HomeMy WebLinkAbout1998-04-07-PBC-min.pdf TOWN OF LEXINGTON, MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of Tuesday Auril 7 1998 PBC Meetina in Estabrook Hall , Cary Memorial Building, as approved May 20 , 1998 The meeting was called to order at 7 07 p m by Chairman Kelley, with other committee members Bruckman, Poinelli and Touart present Arriving by 7 30 p m were HMFH representatives Philip Lewis and Arthur Duffy, Director of School Building Operations Moynihan, and from the ad hoc advisory group Dan Busa, Neal Boyle, Bill Kennedy (Capital Expenditures liaison) , Paul LaPointe (Appropriation liaison) , Richard Lucas , Dave Eagle, Ed Natale, as well as nominee for School Committee representative to the PBC Nick Cannalonga and observer Dorrie Traficante Minutes of March 31 1998 were APPROVED as amended Materials distributed included two lists of items for consideration for possible cuts from the previously estimated costs for high school renovation One list was compiled by Moynihan and the other by HMFH and previously circulated last Thursday at a small meeting with the architects, Moynihan and committee representatives Beginning with introductions of the two group members to each other, the joint PBC-ad hoc group meeting began at 7 37 and lasted until 10 07 General discussion of the high school project raised questioned whether a project for $15 million could address enrollment and program needs at the high school Chairman Kelley pointed out that not all aspects of the high school plans had been finalized when work was discontinued on the project Need for having a reimbursable project was doubted by two ad hoc group members; need for adherence to all kinds of code was also questioned Pointed out that there is no choice in some areas such as sprinklers, whereas some areas are more "grey area" such as energy code Representatives of the financial committees called state reimbursement , "pivotal in the long term financial interest of the town " Busa reminded the group that they were committed to making a report by May 26 To the question about how much of the December proposal to renovate four schools was the high school , architects responded $28 million, of which the construction cost alone was a little over $23 million, to which "soft costs" have to be added to make up the total project cost Asked if it is possible to "get more than five percent out " Busa admitted that although a goal of $15 million for the high school project was proposed, a project limited by that amount "may be unacceptable " He later stated that $15 million is "not set in stone " In a memo from the architect to the ad hoc group, there was no mention of a dollar amount Cuts were described as occurring in two phases , Phase I not to affect program and Phase II that would To questions about classroom utilization, Moynihan responded that at the high school level , the maximum utilization achievable would be 85 percent , with a high percentage possible in elementary schools , where students do less moving around General town financial picture in relation to debt service, expectation that a reimbursable project should look ahead for 40 years and assure lasting 20 years , and advisability of PBC Minutes of 4/7/98, page 2 looking into "Performance contracting for multi schools" were brought up before the committee turned to detailed cost estimating analysis of the HMFH list of proposed "LHS Phase I cost cuts " highlighted by Lewis in ball park figures Site work items #1 through #8 were termed less costly, ranging from $38 ,000 for the first three items , about $17-18,000 to substitute pre- cast concrete curbing instead of granite curbing Deleting the free- standing entry "gazebo" would eliminate $50 ,000 Called more costly were Items #9 inner courtyard work ($250 ,000) , #10 second commons patio ($72 ,000) and reconfiguration of the existing rear parking lot , with some exceptions could eliminate $500 ,000 Renovations and additions especially questioned and discussed included roofs, particularly PVC roofs of varying ages and conditions , several that have failed or are seriously in need of repair and acoustic ceilings, which could be reduced to save $180 ,000 PBC committee members cried "unacceptable" to a proposal not to replace wood flooring in the gymnasium; the advisability of repairing rather than replacing gymnasium bleachers was mulled ($75-80 ,000) Windows and curtain wall reductions and revisions that could save up to $1 25 million were questioned in light of poor condition of some of them Leaving in place blinds in poor condition (#28) raised strong objection from PBC member Touart Although proposed elimination of sprinklers in the field house and crawl spaces would have to approved by the Fire Chief and Building Inspector, this combined cut (#s 30 and 31) would save nearly $200 ,000 PBC members questioned whether repairing rather than replacing the existing operating gymnasium partition would be an economy at all , and expressed distaste for eliminating painting of existing spaces not to be reconfigured (#s 32 and 35) Items #s 36 to 41 were described as small , but the PBC noted that item #41 is "still on the table " Hot and domestic water system cuts (#s 42 and 43) could save $80 ,000, heating system economies ($100 ,000 in #44) might be achieved by not switching to gas fuel However, small economies in air conditioning suggested by the architects were unfavorably received by the PBC Pointed out that no saving would be achieved by eliminating the "summer boiler" (#46) and items 47 to 50 were not accepted due to the age of the units not replaced in the last renovation round Items 51 and 52 were termed small Item 53 could realize $16,000 saving; #54 $20 ,000, #55 $15 ,000 Item 56 suggesting eliminating replacement of existing lighting in the field house but leaving new additional would save $26,000 , no new addition to field house lighting would cut $3,000 Fire alarm savings were not certain because of substitute costs (#58, save $60 ,000?) Savings in lighting (#59a $250,000 and $320 ,000 for items 59b-g) were questioned on due to possible affect on students More careful cost analysis data were promised by the end of the week, and might be distributed to committee members via the police station Cary Library's April 2 hearing with the Historic Districts Commission met objections from all eight sitting Commission members , it was reported by those who attended The visual mass of the building, the PBC Minutes of 4/7/98 , page 3 overpowering impression of the ramp, metal window material , sky lights and roof line were all received unfavorably Much work remains Recommended that the Library and Permanent building committee chairmen meet with the library director to assist in the effort to shape a more acceptable project as expeditiously as possible (Reported that the Historic District Commission even offered to send to representatives to the PBC ) The handicap ramp seemed the thorniest of problems Suggested that the PBC might try to smooth the library's relationships with this town board, by producing one unified report from the PBC on the project Meeting adjourned at 10 55 p m Respectfully submitted, Erna S Greene, Secretary