Loading...
HomeMy WebLinkAbout1997-06-25-PBC-min.pdf TOWN OF LEXINGTON, MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of Wednesday June 25 1997 Meetina at Lexington High School , as approved July 15, 1997 The meeting wac called to order by Chairman Bruckman at about 7 10 a m , with other committee members Johnson, Kelley, and Poinelli present, as well as Director of School Buildings Operation Moynihan, Paul Bongiovanni and Dawn McKenna Dorthia Hayes of HMFH attended also, bringing new draft plans for Bowman, Bridge and Harrington Schools Bowman plans show an added Kindergarten wing on the right end of the building Wetlands and wetland buffer zones surround the building on all other sides Concern was expressed about total square footage of the addition and how to stay within budget Bridge school wetland is in the play field Committee suggested that the kindergartens could be 1100 square feet instead of 1200 and still meet state standards (and be easier on the budget) Harrinaton plans show a one-story addition making the total structure a closed square around an enclosed courtyard connected to the right side of the present building by a hallway The addition across the back would contain the early education center and four kindergarten rooms The courtyard would be visible through the hallway, which would be glassed on both sides and accessible through doors on opposite sides of the hallway Committee members suggested exploring variations from using a two-story addition, and they expressed a liking for the curved lines shown in the Master Plan draft In any case, they also recommended exploring a shorter hallway, a pod plan in an angled addition or other possibilities Schedule progress reported The Fiske estimates are due at HMFH today These would be "conceptual cost estimates" not including program changes Committee members called for schematic cost estimates (within 10 percent accuracy, project descriptions and spread sheets on each school as well as elevation pictures and schematics by August 15 "We cannot be late, " it was stated around the room, as pressing the architects and consultants for prompt delivery was strongly urged The plans would go to the schools after the PBC signs off on them The PBC mission for the project is "downward refinement" wherever possible Bowman, Bridge and Clarke schematics are needed in two weeks In order that the PBC catch up on its contributions to schedule expediting, a half hour presentation by Steve Friedlaender on the high school will be added to the July 1 agenda and an extra meeting was scheduled for 7 15 a m Thursday, July 3 at Harrington School In continued delineation of design development interim progress expectations, the committee called for August 15 delivery of conceptual cost estimates and schematic designs By September 2 project descriptions beyond schematics and by September 16 cost estimates should follow Completion of architectural design development would come later, with total final approval by the committee and others by December 15 In discussion of who and how payment for a second cost estimate PBC Minutes of 6/25/97 - Page 2 would come about, the committee would favor use of the forthcoming project manager 's services for this However, Moynihan pointed out that the RFP for design development calls for cost estimating as a basic service The allowance for cost estimating in the contract therefore would include both parallel estimates The meeting adjourned at 8 35 a m Respectfully submitted, --&-5-44-12----.• Erna S Greene, Secretary ii