Loading...
HomeMy WebLinkAbout2006-03-15-PBC-min.pdf R�s TOWN OF LEXINGTON, MASSACHUSETTS ( PERMANENT BUILDING COMMITTEE Minutes of Tuesday March 15. 2006 meeting in the Selectmen's Meeting Room at Town Hall. Permanent Building Committee Chairman, Phil Poinelli called the meeting to order at 7:09 p.m. with other PBC members Jon Himmel,Richard Perry, Mary Lou Touart and Eric Brown present. Present as well, were the Owner's Representative, Bill Kealy, Project Manager, Project Coordinator, Carl Oldenburg, Superintendent of Schools, Paul Ash, Bill Hartigan, Director of Facilities, Pauline Burke and Gail Wagner from DPW On behalf of the School Committee(SC), Helen Cohen, Tom Diaz, Olga Guttag and Tom Griffiths and from Handlin, Garrahan, Zachos and Associates (HGZ), architects, David Handlin, Elizabeth Zachos and Amy Carroll. Also in attendance, Shirley Stolz, Capital Expenditures Committee(CEC), Colin Smith, Design Advisory Committee(DAC), Joe Welch, Historic Districts Commission(HDC), Sonia All Marta, Farmer's Market and neighbors, Nanur Page. Susan Ericson, Valerie Johnson and Stephanie Kendall. 1 HGZ showed how the School Administration Building(SAB) is currently situated and three schemes for the new building with different narking plans stretching from the esplanade to Fletcher Street. Scheme A allows for 62 parking spaces, Scheme B, 83 spaces and Scheme C, 71 spaces. At present there is about 52%green area. With the implementation of Schemes A, B or C (all done to code and zoning by-laws)there will be ( 55%to 59%green area around the new SAB. It was also pointed out that the grade level will be brought up to the entrance of the new SAB. 2. The DAC had concerns regarding the planting of trees for every ten narking spaces: wanted to an increase in green area: thinks access from Fletcher redundant; and preferred Scheme C. 3 Neighbors were apprehensive about the re-orientation of the green (playing) space on Massachusetts Avenue: the new access from Fletcher inviting an increase in traffic;how landscaping might effect the bike path: increased parking and noise levels during meetings at the SAB: and snow removal. (A new back façade and re-landscaping of the parking lot, making it aesthetically more pleasing, was acceptable.)The School Department answered that for daytime meetings a total of 30 more cars would need to park and for evening meetings a maximum of 80 would need to park. As far as, constant traffic in and out of the lot, most employees arrive in the morning, park and leave their space only at the end of the day A possible solution to increased traffic on Fletcher would be to create an entrance on Massachusetts Avenue and an "exit only" on Fletcher. 4 The PBC suggested planting a low hedge that would help to prevent some balls from rolling onto Massachusetts Avenue. 5 Limited access to the green area and narking could nose problems for the Farmer's Market. Flit'JP n tla '43-v ‘NIVIA docr Page 2 PBC Meeting Minutes March 15,2006 6. The DPW stated that there are 175 spaces behind the Town complex including 26 hermit narking spaces and possibly 8 stacked-narking spaces behind the SAB. It might be possible to move the 26 permit parking contracts to another lot in town. 7 The joint meeting adjourned at 8:44 n.m. and the PBC continued with Chairman, Phil Poinelli,other PBC members Jon Himmel,Richard Perry,Mary Lou Touart and Eric Brown present. Also,the Owner's Representative, Bill Kealy, Project Manager, Project Coordinator, Carl Oldenburg,Bill Hartigan,Director of Facilities, Olga Guttag and Tom Griffiths from the School Committee, and from HGZ architects,David Handlin, Elizabeth Zachos and Amy Carroll. 8. Conies of the Cost Estimate and LEED upgrade were distributed. 9 Cost Estimate: Retaining the old historic structure out weighs tearing it down; the current foundation of the historic building is sound and the basement is not intended for use; figure includes a 10% contingency; figures show an increase in HVAC materials; and the Daedalus figure is as of today's date. 10. Regarding the Cost Estimate,the PBC reauested the actual cost to demolish the old historic front of the SAB versus keening it and asked that the figures for this be tied to a schedule. 11 Concerning the SAB budget.the Committee asked to have 30% for soft costs: to think about FF&E and technology and moving expenses(B. Hartigan to do); suggested a hazard specialist review potential problems with asbestos and/or lead paint; estimates for security, construction and architect;to increase the landscape budget; and that the standard for Town lighting(for the site for security reasons)be checked. 12. It was suggested that there be access to the bike Hath from somewhere within the complex. 13. For LEED certification a commissioning agent has to be engaged to review drawings and continue with the project ensuring that all teauirements are fulfilled. An allowance of $20,000 needs to be made for this. 14 LEED administrations costs for the General Contractor could be between$60.000 to $100,000. 15 Daedalus estimates that LEED is 10%of the construction costs. 16. As to whether the PBC decides to annly for LEED Silver or just track the nanerwork will depend upon the final cost estimate. 17 The geothermal is not part of the cost estimate. ,b Ergs §� ids I. 3 I.. Page 3 PBC Meeting Minutes March 15,2006 18. The School Committee needs to vote on the SAB nroiect before it goes to Town Meeting [TM1. 19 The money required for additional design work and carrying the nroiect through the bidding stage will be requested at the Anril TM. 20. HGZ was asked to update the Cost Estimate: connect it to the project budget; and create time lines for the project. 21 At 9:50 p.m. M. Touart made a motion to adjourn the meeting. E. Brown seconded the motion and all were in favor to end the meeting. Respectfully submitted, f/ Cam Shapiro Secretary