Loading...
HomeMy WebLinkAbout1994-04-07-PBC-min.pdf TOWN OF LEXINGTON, MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of April 7 1994 in the Selectmen' s Meeting Room, Town Office Building The meeting was called to order by Acting Chairman Francis X Fields at 4 10 p m with committee members Chiefs Bergeron and Casey (for protection services) , Edson, McCabe, J Kennedy, Scanlon and Touart present The following also attended Selectman Leo McSweeney, Town Manager Richard White, Appropriation Committee member Jane Paget, Town Purchasing Agent James McLaughlin, Fire Dispatcher Frank San Severino, Firefighters Joseph Foley, Richard Sullivan and John Tobias, Police Captain James Kilmartin, and Peter Berry and Chuck Langone of RAM Communications Police Chief Casey noted that the police and fire departments have worked closely on the plans for consolidation of town safely dispatch services in the Police Building The motion to be proposed to Town Meeting calls for appropriation (and bonding) of $1 6 million Chief Casey presented overall description of the project and Fire Chief Bergeron described the equipment , on which he has concentrated attention Brett Donham of Donham and Sweeney worked on project scope and trimming and will be at Town Meeting during discussion of Article 15 In addition, Purchasing Agent McLaughlin helped to reduce project cost by 15 percent Fire department radios , some dating back before 1978 , are to be replaced, as will the Police Bapern system Computer hard and software acquisitions will maximize existing equipment Included will be closed circuit TV for cable and tie-in for alarms , telephones , data lines and intercom The cable will be installed underground in an existing conduit along Massachusetts Avenue, rather than overhead This will save money In the building security and safety doors and bullet resistance for prison processing will be installed and the cells will be brought into compliance in all aspects including size, heat and equipment Cost of all construction work in Article 15 $694 ,000 That encompasses complete conversion of the dispatch area, asbestos work and the East Lexington Fire Station boiler Reported that eleven general bids were received Low bidder was A J Robicheau Construction Inc of Roslindale Motorola equipment was selected from the State bid list Computer hardware bids will not be opened until April 14 Selectman McSweeney asked about change orders Response each change order requires three signatures Contingency allowances in the $1 6 million are ten percent ($40 000) on the renovation work and two percent $25 ,000) on equipment A half time Clerk of the Works will be hired for eight weeks Electrical work bid was a filed sub-bid There may be a challenge in the heating/ventilation bid since the highest of low bidders was taken Meeting was adjourned at 4 53 p m Respectfully submitted, Kek -- Erna S Greene, Secty