HomeMy WebLinkAbout1993-05-19-PBC-min.pdf TOWN OF LEXINGTON, MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of May 19 1993 Meeting in Room G-15 , Town Office Building, as approved September 22 , 1993 The meeting was called to order by Chairman Kennedy at 8 10 p m with other committee members Edson, John Kennedy, and Touart present Also attending were Director of School Building Operation John Moynihan III , and Capital Expenditures Committee representative Paul Hamburger Proposal document for Town Buildings Study by Archetype summarizing scope of project and price of $37 ,000 has been received The following buildings are included in the study Bandstand Town Office Building *Police Department *Westview Cemetery Building *Animal Shelter *Central Fire station East Lexington Fire station *Visitors ' Center *Recreation Building at Old Reservoir Center Field Building Two storage buildings at Munroe Cemetery Cary Library East Lexington Branch Library Senior Center *DPW Building * studies have been done and will be sent Archetype A comprehensive study will be requested, but Archetype will be asked only to fill in missing information and not to redo work already done Maintenance considerations are to be included All of the data is to be put on a computer system to be updated continuously (by town forces) Three categories of needed work should be enumerated immediately needs, near-term needs and long-term needs There should be room in the computer program for life-cycle data Possibly asbestos data (need for special asbestos contractor? ) should also be included Understood that Archetype's quotations of $37 ,000 and $93 , 000 for town and schools buildings study would included diagnostics , engineering and asbestos studies Approval of both proposals VOTED List of buildings has been agreed upon Timetable Work on schools will begin in June Peter Chalpin will be contacted about schedule for work in town buildings Other PBC involvement will include work on consolidation of communications functions Jim Scanlon will work with the police Field House Roof Trial date has been postponed until October 18 , 1993 Hastings School Opening Renovation plan proposals - 14 of them - have been received Appropriation of $208 ,000 was approved by 1993 Town PBC Minutes 5/19/93 - Page 2 Meeting Together with collected rental money and money saved from statement reimbursements, a total of $750 ,000 has been assembled for the project Among the Architects under consideration are DRA and Rosenfeld Interviews will be conducted with several (possibly five) by three committee members Ted Edson, Chairman Kennedy and Mary Lou Touart John Kennedy may join the effort if he is available Project must begin soon to take advantage of state funding Current capital proiects are elevator construction at the High School and Diamond Middle School Contractor Smith Groves is paying subcontractors direct The elevator subcontractor is Beckwith Meeting adjourned at 9 15 p m until June 16 at 8 p m Respectfully submitted, Erna S Greene, Secretary to the committee