HomeMy WebLinkAbout1989-09-14-PBC-min.pdf TOWN OF LEXINGTON MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of September 14 1989 committee meeting in Room G-1 Town Office Building, as approved October 12 , 1989 The meeting was called to order by Chairman Kennedy at 7 45 with other committee members Edson, Johnson (slighter later) , Scanlon and Smith present Other attending included Director of School Building Operation John Moynihan, Superintendent of Schools Philip Geiger and Clerk of the Works Manny Coscia, as well as consultants Aitchison and Rowlands of Chartwell Improved schools ' condition has been noted by LEA president among others , Geiger reported He now has six maintenance people Fresh air intakes have been opened and exhaust fans restored at the high school Custodians now have better tools and equipment , including a lift to reach field house lights Johns now have solid plastic dividers and MRWA-recommended water miser toilets Some cafeterias have been renewed and graffiti is now covered within 24 hours Minutes of August 10 1989 committee meeting were approved as submitted Substantial Completion of the Diamond and Fiske libraries was reported by Coscia In order to get certificate of occupancy, fire alarms will be completed this weekend and virtual completion can be accomplished before next week' s end The schools have arranged by extension of contract with the firm on the job for the necessary new built-in bookcases Purchase order is from the school budget Punch list has been held down due to daily supervision At Diamond the heating system has not been tested due to a disconnected feed line in the corridor Moynihan reported he was concerned by damage to stair treads by the asbestos removal job It is a matter for the subcontractor ' s insurance Handicapped lift in the high school has caused much distress for the principal , upset by complaints from handicapped students , as well as for Moynihan, who has put in daily calls for repairs to the lift mechanism Vandalism prevention measures are needed The equipment is totally computerized and very sensitive It is Cadillac quality equipment from a well established manufacturer, installed by a topnotch technician Replacement with an elevator would cost about $100 , 000 Emergency evacuation variance is now before the local Building Code Board of Appeals The Building Commissioner had previously ruled that the staircase, at the dead end of a corridor with six classrooms on the second floor, was not essential to emergency egress Diamond Corridor problems include patchwork that needs to be colored to match existing and a hanging pipe with heat valve that needs to be covered with a soffit or otherwise secured These need rapid solutions as dedication of the Diamond Library is scheduled in the near future High School auditorium lighting panel instruction session that was supposed to happen September 6th has been rescheduled for September 1 PBC Minutes 9/14/89 27th This session will be video taped for future reference A problem with pulsation of lights was reported Among the complications Crowley, the electrician has gone out of business Hiah School front doors have been planed several times They swell in hot humid weather and shrink in the cold Concern expressed that they not be the correct door for their use and that they cannot be operated by handicapped people Coscia said he is now working on a list of problem items from Moynihan Asbestos information to enable Moynihan to file in the asbestos class action suit against Johns Manville will be gathered for end of September with the help of Chartwell Final filing deadline is October 31 Field House roof is still in negotiation with Morello, with hope of settlement tomorrow Extension of the PVC cap to below the skylights will add insulation from the outside The $12,500 extra will have to come from the town Accounting differences between Chartwell and the Comptroller 's office are now being reconciled and then the approximately $25, 000 in change orders from J P Construction settlement negotiations can soon begin Some claimed items are due to incomplete specifications and drawings Payment of Accounts, including two final payments to Briggs and none to contractors , as listed by Chartwell VOTED VOTED unanimously by roll call to go into Executive Session at 9 03 The meeting resumed in open session to adjourn at 9 22 p m until Thursday, October 12 at 7 30 p m in Room G-1 Respectfully submitted, Erna S Greene, Secretary to the Committee 2