HomeMy WebLinkAbout1987-10-13-PBC-min.pdf TOWN OF LEXINGTON, MASSACHUSETTS PERMANENT BUILDING COMMITTEE Minutes of special committee meeting of October 13 1987 in Room 111, Town Office Building, as approved November 12, 1987 The meeting was called to order at 6 30 p m. by Chairman Kennedy, with other committee members Edson, J Kennedy and Touart present as well as architects Manford and MacNicholas and staff Maclnnes and Coscia. Distributed by the architects were compiled lists of all alternates and cuts as well as a two-page list of recommendations for budget reallocation in the final construction package Among the items especially mentioned were the new basketball floor, additional outlets at several schools and rear doors for Diamond; the largest cut item was the storage room not to be built onto the High School (Bill Kennedy pointed out that this decision had long since been made However, it is understood that the use of power mechanics shop for the custodians storage had not been entirely accepted by some of the school staff ) Among omissions recommended to be brought back are some paving at all schools especially Estabrook Outlets decided not to add any unless they are grounded All those within six feet of plumbing should be ground-fault Estabrook floor urinals must be removed, as they no longer meet code Fiske doors and exteriors are desperately in need of renovation. Brickwork must be repainted, especially above each lintel over each window Clarke. Repairs to folding walls are very expensive and have been omitted High School shop dust collection system must be expanded Also additional electrical work may have to be done Bridoe/Bowman receptacles have been omitted It has been impossible to date to get a repairman for the folding classroom walls. Replacement would be expensive ($38,000 to $40,000) Repair of the folding walls is in the contract VOTED - to leave the Fiske library at 2400 square feet (the smaller version) ; - for use of space in the power shop for the custodians' storage; - to replace ceiling tiles missing (may be in Package II) - to add items 4 a) , b) c) , and d) on architects recommended list (high school field house floors, backstops and lighting school entrance portico and miscellaneous electrical and architectural items; - to add brick pointing at Fiske - to remove/replace the urinals at Estabrook PBC Minutes 10/13/87 p 2 The total cost of the above voted additions will be about $300,000, reducing the design contingency to $117 000 Also VOTED to add recommended possible alternates a) rear doors at Diamond; b) classroom painting at Fiske; c) exterior doors at Fiske and d) security lights at Estabrook and Diamond (see architects recommended list) These will be added to the contract if money is found. Bridoe and Bowman Gyms have become considerably noisier due to recent painting Tectem walls with wood strips would cost about $14 000 for each gym. Committee VOTED that k.LG hire an accoustic consultant at a cost not to exceed $2,000 Replacement of Lexan windows at Diamond has prooved more time- consuming work than anticipated because an excess of putty was discovered Also condition of screws and fitting is poor. The contractor is asking $5,000 extra for the putty removal work and a total of $9,000 The meeting adjourned at approximately 7 55 p m. until Thursday, November 12 1987 at 7 30 p.m. in Room G-15 Respectfully submitted, R/ .7 /2 Erna S. Greene, Secretary to the committee