Order of Conditions, 6 Douglas Road - 201-462
It was moved, seconded and voted to approve the Order of Conditions for 6 Douglas Road as
amended.
Minutes - It was moved, seconded and voted to approve the minutes of February 29, 2000, as
amended.
Site Visits - The Hayden Recreation site visit was scheduled for Saturday, March 25, at 10 a.m.
Meet in the upper parking lot off Lincoln Street.
Extension Permit—Lexington Club - 201-390
It was moved, seconded and voted to extend the Order of Conditions for a 1-year period for The
Lexington Club, Health Development Corporation.
DET #00-4, 35 Haves Lane, P Johnson, drainage/single-familv house and street 8 pm
widening
Present: Peter Johnson, applicant; Gary Larson, architect. Others listed in the file.
Mr Larson presented the plans for the construction of a second home at 35 Hayes Lane. The
project-is_detailed_in the RFD_submitted_on_2/23/00._This construction is outside the 200-foot_
Riverfront area of the Vine Brook and the 100-foot buffer of an Isolated Land Subject to
Flooding (ILSF) at the back of the lot. Therefore, the project is filed for review of the drainage
system. A portion of the existing driveway (approximately 900 s.f.)will be removed and the
area will be seeded. At present Hayes Lane is not an approved road, therefore approximately
100 feet of Hayes Lane at the intersection with Fletcher Avenue will be widened so that Hayes
Lane will vary in width from 12 to 18 feet. A drywell is proposed for the stormwater and the rate
of the stormwater runoff from the site will be reduced. A swale captures runoff from the existing
house.
The Commission is concerned about the present runoff condition where stormwater flows down
Hayes Lane to the conservation path and then toward the Vine Brook. Severe erosion is taking
place at the path entrance. There is also concern regarding the swale discharging runoff at the
back of the lot and the removal of shrubbery for the widening of Hayes Lane. Gary Larson said
MINUTES LEXINGTON CONSERVATION COMMISSION 3/14/00 PAGE 2
runoff from the 200 s.f. of paving for the turnaround at the new house will go towards the swale
and all the other runoff will be picked up by a drywell. The runoff causing the erosion on Hayes
Lane is from a point in front of the existing house. They are trying to reduce the rate of runoff
due to this project with the removal of part of that existing driveway In response to the
Commission's comments that the swale ends up in the adjacent property, Mr. Larson noted this
is a reflection of what is happening there now because of the existing topographic contours. It
will not be as wide and flat as it is now, but the amount of water will be decreased with the new
plan. The current runoff is sheet flow; under the proposal,the runoff will be directed through an
open grassed swale. In response to a question about the flagged boundary of the ILSF, Mr
Larson said that soil samples were taken and he will submit a report showing the locations. Mrs.
Miller noted the project has been submitted to the Planning Board for a definitive subdivision
review Mr. Larson said that they worked with Engineering to satisfy their safety requirements
at the intersection of Hayes Lane and Fletcher Avenue. A number of alternatives were
considered. The Engineering Dept. asked for a wider road to accommodate two cars and
accepted this plan as the solution.
Jean Acker, 27 Hayes Lane, expressed her concerns about the road being widened and the safety
issues. She is worried that the cars will travel faster and there may be more accidents.
The Engineering memo was not available for this meeting. Therefore, with the applicant's
permission, it was moved, seconded and voted to continue the meeting to March 28 at 8.30 p.m.
CONT'D HEARING, Bikeway Cable Installation, MFN - 201-464 8.30 p.m.
Present: Tim Smith and Steve Shea, Adesta Communications; Mark Heaney and Paul On, SEA
Consultants; Betty Eddison, Selectman; Jerry VanHook, Bikeway Committee. Others are listed
in the file.
Paul On said that the plans had been revised to reflect the changes requested by the Commission
as a result of the site inspection walks with the consultants. He reviewed the revisions on each
sheet of the plan. In some areas,the alignment of the cable and handhold installations were
moved further_from the wetlands, and the crossings were reduced fromil-to-4.Mrs.Millersaid
that on Plan C-5,the area at wetland line at BA-4 and the area of running water on C-4 should be
marked in blue. Mr On noted that the one on C-5 is the only one in the Commission's
jurisdiction. On C 7 Mr. Orr said that their wetland scientist used the 50% rule to determine that
the area of standing water was not a wetland. On C-8 Mr. Orr said the wetlands scientist said
that an area of what appeared to be a wetland was not connected. Mrs. Miller said the
Commission believes it is connected (it may be underground), and considers it a resource area
that should be protected. It should be reflected on the plan as the North Lexington Brook.
(Ms. Baci arrived at 8:50 p.m.).
t_.
MINUTES LEXINGTON CONSERVATION COMMISSION 3/14/00 PAGE 3
Mr Orr said that plans for the records will be resubmitted to the Commission. The Commission
gave instruction that they should be notified immediately if an obstruction requires a change to
the Directional Drilling plan. Any change will have to be reviewed and approved before a
change is permitted to take place.
As a result of seeing the size of the machinery used by Metromedia for the cable installation on
Waltham Street, Mrs. Frick is concerned about its use on the bikeway project. The pavement is
only 3"thick and the weight of the equipment may damage it. Mr On said they will try to
reduce the size of the machinery to accommodate the bike path. Mrs. Miller asked him to look at
alternatives also. Mr. Orr said that it will be necessary to remove the excavated material in only
20-35%of the areas on the plan. He will check the size of the trucks for their construction
specifications and submit a list of the types of equipment that is being proposed.
In reference to the Bikeway Committee's request to install a third conduit, Mr. Wolk said he
understands that MFN does not want to do this because they prefer not to give future competitors
access to the fiber optic route. He also noted that this is not a Conservation issue, but that it
would be problematic if the trenching had to be repeated. Mr. Orr noted that MFN is consulting
with David Carbonneau regarding this matter. Mrs. Frick reported that there was a unanimous
vote at the Bikeway Committee meeting that a third conduit should be installed at this time.
Harvey Bingham, on behalf of the Bikeway Committee, raised several issues supporting the
installation of the third conduit line. Mrs. Frick submitted a copy for the record.
Mr. VanHook expressed concern over the weight of the equipment on the bike path and the
placement of the excavated material. Mr. Or replied that the material would have to be stored in
a truck, not on the bikeway This may also be a construction staging issue. In reply to Mr.
VanHook's question about the diameter of the bore hole, Mr. Shea said the diameter has been
increased to 8"because 6"was not large enough. Mr. VanHook asked if the trenching could be
changed along the Hartwell Avenue section, but when reviewed, Mrs. Miller said the
Commission is comfortable with what has been proposed along that area. Mr VanHook
commented on the desire of the Bikeway Committee to avoid the future excavations along the
bikeway because more trenching would be detrimental. He believes it makes sense for MFN to
install the third conduit at this time. After discussion, Betty Eddison noted that the Selectmen
have—ultimate—jurisdiction-over-the—bikeway he---will-check-on-this-fonclar-ification
It was moved, seconded and voted to close the hearing.
CONT'D HEARING, Old Smith Farm, 160/170 Wood Street, Wood St. R.T - 201-457
Present: Jim Gaklis, applicant; Ron Wood, Guidelines, Inc., and Fred Russell, Engineer
The initial hearing took place on October 12, 1999 Mr. Hamilton informed the applicant that
when there are a series of hearings over a long time period, there is a risk that the Commissioners
who vote won't be at every meeting. He suggested that the applicant be ready to conclude at the
next meeting.
MINUTES - LEXINGTON CONSERVATION COMMISSION 3/14/00 PAGE 4
Fred Russell presented the plans to give the Commission an overview of what has taken place
over the past few months. This is a Section 9 project under the Planning Board Rules&
Regulations. The changes to the drainage mitigation include filling in a portion of the depression
while maintaining some of the area for flood storage. Engineering required a 3-1 slope and a
shallower basin for safety reasons. They also want to be sure the drainage plan will not cause a
surcharge in the town's drainage system during a 25-year storm. He believes this has been
accomplished. He said Engineering has given their verbal approval of the project, but are
waiting for comments from DPW with regard to certain specific issues. The downstream
impacts from the project must be addressed and the peak volume rates and drainage calculations
will be shown at the next meeting. Mr. Gaklis noted that the Commission's concerns regarding
the ground cover around the detention area and the snow storage plan have been addressed in the
letter dated 12/8/99 which is on file.
With the applicant's consent, it was moved, seconded and voted to continue the hearing to March
28 at 8:45 p.m.
Commissioners Baci, Bitsko, Frick, Hamilton, Miller and Wolk voted to go into Executive
Session for the purpose of discussing litigation.
The meeting resumed in open session.
DET #99-23 - 34 Middlebv Road
Todd Cataldo submitted a plan revision and asked that it be considered a field change. It was
decided that Mr. Cataldo should attend the next meeting to explain the change.
It was voted to adjourn at 10:15 p.m.