HomeMy WebLinkAboutCONCORD AVE 524Noone Sibe &Shelter
•Address 524 Concord Avenue
Service No.232
~.a-oI'9
Kind of Pipe
Location
Size Size of Main
Location
Date Materiai Amount Total Date Amount
i Labor 1149
10%Overhead ..I~8'-3;4"Copper TUb'ng @.~;6
1-3/h"Cx~LW.R S&W I
l-3/4"Cx3/4"C Union (3 pts)
Totali 3397
I
ojwner
Aind Laid By
Trench Dug By
Pipe Sluplied
Labor
1 Hr.TruckiM
Patching 20x3
•
•
I
11-7-51
:•
•
•