HomeMy WebLinkAboutWARD ST 28!.¬GF!(!(!(!(!(ASH STREETWA R DSTREET
36.5'35'28 WARDST 72-29A
36 WARDST 72-172
20 WARDST 72-28
Printed Date: 1/28/2015 ¶Legend
swManhole
<all other values>SubtypeCD
Manhole
!(Sewer Manholes
GF Sewer Service Clean Out
!.Sewer Service Connection
Ties_Dimensions Sewer
Sewer Service Line
28 Ward StTOWN OF LEXINGTON Sewer Service Tie Card
MASSACHUSETTS
Address Map and Lot Permit Number Contractor Name Inspector28 Ward St 72-29A 6037 Eycon Construction msprague
Date Material Depth of Cover Amount1/5/2015 6x6 AC to PVC Fern Co 6 ft 1-Connect to existing stub6 " PVC Pipe - SDR 35 28 ft to clean out6" PVC Clean Out 6 ft 1
Type of work completedNew 6" PVC sewer service installed to new house, connection to existing stub.