Loading...
HomeMy WebLinkAboutV 599 Sh5SCALE 1 %4` EXCEPT AS NOTED PUB.RD. DlI= STATE FED. AID PROJ.NO. FISCAL' YEAR SHEET NO. TOTAL SHEETS 1 MASS. U272(53) 32' Width Yories Width Yaries 4' l2' q' Accef. or Accel. or — — oecel Lane Oece %cane i5(0 Norma/ z' Ala -mol /?dwy. Ralf e Edgiaq �fivy. Guam rype C35 ,edwy.Edge Edging k'ourrd �o TYOa Sl3 /2 / Type SB %2 "perAt b� row of Zedye Slope Yories Ft Round S /ope Yories /-o¢m i1 %4`pe�rlFtMi/l Mulch (by others) %y per. Ft Min 4. /s1op� Forth S /ope Ex /stripy Glvund 2%i 'A, r. Cone. Race Type I -/ 2f" fait Canc. Pave Type I- -/. 4 edge Allowance I. nee 4!z CrushedSrone Base - 4%i Crushed Stohe Bose - .Gray¢ / �3�se G'rcw�l Base • Treotvn¢ rot yraries (See Typical Sectiorf) Tieatn7errf Yartes (-see T,•�lp /c4 /.Secriort} SECTION AT INTERCHANGE SECTION AT INTERCHANGE FILL OVER '10 FT: LEDGE ' CUT NOTE S �ta'Grave� 2 FOOT 1..EFT HAND SHOULDER - h4u «ter THE FINISH BITUMINOUS _CONCRETE 'SURFACE SHALE BE TREATED WITH Plfhway 6?"are steel Beam 0,3 GALLONS BITUMEN (RS -'2) PER SQUARE YARD AND COVERED WITH ; Fype 3I8" PEASTONE AT A RATE p;' , 5 18S PER SQUARE YARD. T:?F PEASTONE `SHALL BE PREVIOUSLY TREATED, WITH Mulch �' I -1/4 GALLONS SiTUMEN 6MC -0) PER TON OF STONE: gr OthePS ice/ i l r PROPOSED SURFACE RTE 128 TOP COURSE 2!/2 -CLASS I BITUMINOUS CONCRETE TYPE I- I , LAID Its TWO COURSES 1-i /4 EACH [ S COURSE 41/2" CRUSHED STONE PENS- JRATED. WITH 1 -3/4 GALS 81TUMEN(OA` -3 OR OA°-4) PER ° F,�I S.Y. KEYSTONE COVER � ROOK EQUUINDATION 12' GRAVEL -- EXISTING RTE 128 WHERE PRESENT ROADWAY S TO 'BE " Hard Bottom ' RETAINED AS FOUNDATION GUARD RAIL SECT!0N SHOWING ROCK FILL TOP COURSE I-I /4" TOP COURSE CL ASST' BITUMINOUS CONCRETE TYPE I-1,'OVER A VARYING ' DEP r; STA.45 75 'T�0''$TA: 52+55 `LT, LEVELING COURSE (MAX 4-1f2 "DEPTH) 'PRESENT SURFACE TO..B;E TREATED WI'Ty1' "(° SCALE 1 /a °v- I``0" TACK COAT. OF 1/10 G:AI.: BITUMEN (RS' 1) PER S:Y , BASE COURSE, OVER `PRESENT ROADWAY SURFACE A '3" MIN`,70'7 1 /2" MAX. OF CRUSHED, STONE G_'1701,_ BASE COURSE PENETRATED WITH I V2 GAL'S. BITUMEN (OA -3 OR OA -4) FOR 15"­ HICKN �, catchc stn INCREASED" BY 1/4 GAL PER INCH INCREASE IN' CRUSHED STONE" FOR BASE COURSE Catch basin 5 �� .CrontFace catch lG�+sirl FOUNDATION OVER PRESENT ROADWAY 'SURFACE A MIN OF 3 GRAVEL, WHERE USED ; Of C. f. Fronf Face ^..� Front Face of C. /. /Z" YA 4 - L 1r7G DG I NG AT GRANITE C U R RAMPS, INTERSECTING ROADS A TYPE `B' BIT, C ®NC, BERMS TOO COURSE 2-1/2' CLASS!` BITUMINOUS CONCRETE PAVEMENT TYPE'h -I LAID IN TWO COURSES' 1 -1/4" TOP; 1 -1/4" BOTTOM. � T C H BASINS BASE COURSE 41/2 CRUSHED STONE PENETRATED WITH 1- 3/4GALS BITUMEN (OA-3 OR OA -4) PER- COVER. FOUNDATION 12 "GRAVEL. IlZ" B.M.A. SHOULDERS Alortar :TOP `COURSE 2-If 2" CRUSHED STONE PENETRATED WITH 2 GALS `BITUMEN (OA-3 OR OA-4) PE, Bde'Neen Joinis / %z" Sand SEALED WITH 3/8 GALS BITUMEN (OA -3 OR OA -4) PER SY, PEASTONE COVER BASE COURSE_ 4 -1/2 'CRUSHED STONE FOR BASE COURSE PENETRATED WITH 1 -314 GALLONS BIT1 (OA -3 OR OA -4)' PER SQUARE YARD, KEYSTONE COVER o ' n °• • —Class 'C Concrete r FOUNDATION 12 GRAVEL . NO SCALE 'TEMPORARY ROADS_,.WILLIAMS RD. TURNAROUND ACCESS RD. TO FU` See Detad Rhore TOP COURSE 3° CLASS'f BITUMINOUS CONCRETE` PAVEMENT TYPE'I =f LAID IN TWO COURSES: `1-1 /2'I I -Ili BOTTOM . con!. r - e /�' pnc. FOUNDATION 12'; GRAVEL.. PENETRATED WITH 1/2 GAL. BITUMEN (MC -1)" PER S.Y. Crushed Stone ;., n Crushed stun :' a, D BITUMINOUS CONCRETE `WALKS 4. 6 "C /ass 'C "Conc. ✓ Grare! 1* P'COURSE 2" CLASS `1' BITUMINOUS CONCRETE FOR SIDEWALKS FOUNDATION 6" GRAVEL GRANITE RUBBLE BLOCKS AT ENTRANCE„ RAMP. (WHERE EXISITING, IS NOT SEp 2 LOAM "OVER 4 PEAT.OVER 6�� IN. NON LEACHING MATERIAL NO SC A L- E F ,.C}F'E— TREATMENT kF TER MEDIAN IS LOAMED UTILIZE AVAILABLE LOAM ON ISLANDS AT IN' ERCLI THEN ON CUT AND FINALLY ON 4 "1 OR " FLATTER FILL SLOPES UNTIL. ALL, AVA LOAM IS DEPLETED USE PEAT BORROW AS :REQUIRED. _u.,.. r