Loading...
HomeMy WebLinkAboutLexington Pre-construction checklistLEXINGTON CONSERVATION COMMISSION PRE-CONSTRUCTION CHECKLIST Project Location: _______________________________ DEP File Number/Local Bylaw (VPC) Number: ______________________ Date: ___________ 1. Has the Order of Conditions been recorded at the Registry of Deeds and evidence of the recording uploaded to the ViewPoint Cloud record? 2. Has the appeal period expired? (10 business days from issuance date) 3. Is the DEP & Local CNOI # sign displayed appropriately and visible from the street? 4. Are the wetland flags present in the field? 5. Is the erosion control installed correctly? 6. Is the limit of work clearly marked with fencing, stakes, flags and/or erosion control, as approved? 7. Has the signed statement by the general contractor confirming they have received, read, and understand the OOC and agree to comply with the OOC been provided? 8. Has the name and contact information of the contractor or person(s) responsible for on-site compliance with the OOC been provided? 9. Has a construction schedule been provided? 10. Have access, stockpile, and stump disposal areas been identified? 11. Will construction vehicles/equipment be parked outside the buffer zone? YES NO ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____