Members: Betty 6eu, Rem Reddy, George Gagliardi , Jim Cadenhead, Mike
Tebaczynoki
Aboent:Bob Heuoolein, Matthias Beebe
Also Present: Robert Peters (Planning Board Lieioon) , Susan Barrett
(Transportation Manager/Liaison) , Ross Morrow (DPW-Engineer) . Omer Khuderi ,
Kiran Niotele. 6oncelo [oote. Priscilla Ryder. Lixin (Simon) 6eo
Open: T:85
Introductions:
Simon - Sat biking, Takeda Group
Simon - His group helped with Bikeway Clean up in Spring
Goncalo - Road Bike, Mountain Bike
Kiran - Avid Biker
Discussing Members of the LBAC - Lexington Bicycle Advisory Committee
I, Review and Approve September 16, 2021 Meeting Notes - Approved
2' Select Board Goal Setting Meeting Update
Betty gave an update of the Open Forum, Kevin and Ram had attended this as
well. Town hired Consulting Firm - structured format. Goal was for all Town
committees to ask for the current status of Lexington vision and
Sustainability goals and ideas to improve,
3. Liaison Reports
3.1. DPW - Ross Morrow
• Centerscape
• Utility poles-Mass Ave and Worthen
• Discussion Followed:
o Jim-Any Improvements? Ross-Hartwell is a long way out.
What is happening sooner is-Striping-waltham St, South of
Rte2 in 2022 + Adding bike lanes at waltham town lane.
Still in Design phase
o Simon - Suggested having a Water station at arlington-
side. One near DPW is good. One near Arlington-side near
Trader Joe's/Bow Street. Ram will raise with FOLB. Simon
said he could organize donations. Betty-Depot Water
Station was funded by FOLB. Ram to talk to Peggy.
o Betty-Waltham St bike lane- Is it std bike lane or does
it have buffers like what DOT did. Ross will share plans,
when available. Ross-Bike paths will be on both sides,
most probably.
3.2. Police - Alex Hagenah
• Not able to make it
3.3. Planning - Robert Peters
• Some links sent out - for Rte2A bridge. Hearing earlier today.
No one from LBAC was able to attend.
�!! s:f/www.in� Ov/ v n 011 x1in On.. irO 0 Il 2 liIn, l�airli ..
.............................................................................................................................................................................................................................. .............. ............................................................................................................................ ..............
r IIa irni nt....mUt ��....0v ir....li.... 5....2021....1t�....14t1 t�f�f�t�....t�4t�f�....2021....1t�....
1 41299999....9499
...............................................................................................................
• Bedford and Hartwell - Complete Streets presentation on Oct 19.
Consultants to present. Looking for people to chime in. Ross-
This includes- Bedford St, Hartwell Ave, Eldred, Wood, Maguire
and Westview, as well. LBAC should attend. Survey results will
be presented. Full Design/25% Design-2 years from now. Should
talk about Separated bike lanes. Also, there is a website and
add comments. Matthias may attend, someone suggested (as it
affects Lincoln Labs)
• Rte 2A resurfacing - West of Rte 128 to Lincoln/Concord.
Richard Canale (BattleRoad project) had said more than repaving
should be done. But for now, only, couple of medians. Maybe
after 2025 changes can happen.
3.4. TSG - Ram (Ross and Susan also attended the last meeting)
• Presentation of Artistic Calming that other towns had done
) . Suggestion was for Kendall
(between Marrett and Waltham) . Ross-May not be a good location,
Reason-Impede Emergency Services and Snow Plowing' Ross- For
Kendall - Can try Temporary Barriers (stuff that was obtained
for Shade Street?) . Ross - If there are better streets for
this/ we can try a Pilot,
• MM Bikeway / Seasons Four - Ross/DPW will take care of it
• Jim - Alt Design group - Traffic Calming - Removable barriers
Update on Transportation by Susan Barrett
• Ped and Bike Transportation Plan in Last meeting - Talked about
Regionalization' Challenges. Effectively and sustainably - build
transit infra. MassDOT funded,
• Bike related programming - Bike Rodeo with Betty and Jim' Was a
Success'
• Lex - Lex Lights The Night (Grab & Go) - Event Date: Thursday/
October 2I/ 2021 - 3:88pm to 6:88pm - Lights customize bags. 688
people last time,
)
• League cycling LCI (I8/22-I8/24) seminar' Certified Biking instructor
- )
� Year-long plans - Peggy and Susan talked' Planning Events for 2822
� www,lex6ikewalk6us,org
� Safe Routes To School - Need Parent Coordinator at each school'
Community-wide effort, How to spread the word especially as some
parents feel the town is not doing much for walking and biking. Jim -
Lot of good stuff happening. Should petition the Town,
4, Bike/Ped Plan Update
4.1. Sub-committee to report on Bike/Ped plan
• Betty - sent out DRAFT plan - created sub-committee for plan- Jim,
Ram and Betty. Help from others and a template from Greenways
corridor was used. Formalize a Letter from LBA[ to the Select Board'
• Jim - Suggested using more inclusive language (including
Pedestrians) / but OK for now. He has a Petition-Bike Transportation
Plan, George is OK, Mike T-Letter is OK. Send it out now.
• A motion was made to send a letter to the Select Board. The
motion passed unanimously.
5' Discuss open Committee positions
0 Open Positions - 2
• Student Liaison - George - regular attendance.
• Simon thinks it is Jesse/Takeda who volunteered. Simon to provide
info.
Nov 18, 2021 next meeting - 6pm - Confirmed.
Close: 8:27pm
+++++++++++++++
FoLB/Bike Lexington:
1. Treasurer's Report - Postponed for next meeting
2. Re-Discovery Day Update -
• 80 helmets for kids - Success
• Bike Connector, Lowell (F ,p //www b..rl�e(...onnec..tor rf )
received many bike donations
3. Bedford is interested in getting together for a Lite Up the Night event on
the Bikeway in November. To Be confirmed