Loading...
HomeMy WebLinkAbout2021-09-15-REC-min-attPeter Coleman From: Lexington Farmers' Market <Iexingtonfarmersmkt@gmail.com> Sent: Friday, August 27, 2021 12:24 PM To: Melissa Battite; Recreation Committee Cc: Cathy Severance Subject: Thanksgiving FEASTival Dear Melissa and Recreation Committee members: As we enter into the fall months, the Lexington Farmers' Market is starting to plan for its annual Thanksgiving FEASTival held on the Tuesday before Thanksgiving, which this year will be November 23. The FEASTival is held traditionally from 12 to 4 PM and is the final market of the 2021 season. It is a popular and well attended event; the earlier market times compared to our regular season market account for weather variability and to ensure daylight hours. We would like to request that the Recreation Committee extend the LFM's permit for the Worthen Road Practice Field as the location for this final market. It was an unintentional error on my part to not include the FEASTival in the original permit request, and I appreciate the Recreation Committee's consideration. I would be happy to provide more information if needed. The response to the new site for the market this year has been overwhelmingly positive, and we are grateful for the terrific space. Thanks in advance for your help. Best, Leslie Wilcott-Henrie LFM Board President Sent from my iPlione ELexington Council for the Arts Utility Box Beautification Project Proposal to Fund for Lexington Submitted By: Lexington Council for the Arts September 1, 2021 Project Description The Lexington Council for the Ails proposes to transform some of the Town's utility boxes into unique works of art. Located in Town recreation areas, these painted boxes will contribute to the vitality and beautification of these public spaces. The utility box designs will have a design and color palette suited to their location. They will be painted by accomplished local artists based on their original designs. These are some examples of painted utility boxes in nearby towns: Purpose Our goal is to beautify public spaces, add to the enjoyment of users of recreation areas, bring a spark of art into the lives of our residents, and celebrate and Support local artists. Selection of Boxes to Be Painted The boxes to be painted will be chosen based on direction from the Recreation Committee. We propose that four boxes be selected. Examples of boxes that might be selected include the large box near the Pool Complex and tennis courts, the large box near the Lincoln Park soccer field, and two large boxes near the Center Recreation Complex baseball field. Photos of these boxes: Selection Artists and Designs The Arts Council will engage a curator/project manager who will send out a call for art with a goal of reaching interested experienced artists. Design themes will be developed through consultation with the Recreation Committee and the Recreation Department. Possible themes might include sports -related subject matter for boxes near athletic fields and marine themes for boxes near the Pool complex. Artists will be asked to submit a design related to those themes and show examples of past painted work. Designs will also be required to abide by certain criteria, such as no advertising (other than the artist's signature and website address). Submitted designs will be reviewed by ajury composed of an Arts Council representative, a Recreation Committee representative, a Lincoln Park Subcommittee representative, and the project curator. One factor in artist selection will be whether they reside or work in Lexington. Schedule The call for art will go Out immediately after the funding for the project is approved, the boxes are selected, and the themes chosen. The Arts Council will join an upcoming Recreation Committee meeting in September to coordinate execution of the project. Since we plan to execute and complete the project in the fall of 2021 and artists will need to get started before the weather gets too cold to paint, our goal will be to have design submissions complete by early October, the designs selected shortly after that, and painting to begin no later than the end of October. Request for Funding We propose to pay each of the selected four artists a stipend of $ 1,000 per box to cover materials and the artist's fee and pay the curator a $500 fee to manage the project. Accordingly, we request a grant from the Fund for Lexington for this project in the amount of $4,500. Respectfully submitted, Stephen Poltorzycki & Jillian Tung Co-Cliairs, Lexington Council for the Arts FY21 Annual Report Responsible for the planning and administration ofpublic parks, playgrounds, athletic fields and recreational facilities in the Town. It is charged with administering, expanding, and promoting recreation, leisure activities, play, sports, physical fitness, and education for all citizens. Appointed by the Town Manager: Recreation Committee Chair Rick DeAngelis, Vice -Chair Lisah Rhodes, Lisa O'Brien, Christian Boutwell, and Francesca Pfrommer. Liaisons: Suzie Barry (Select Board), Deepika Sawhney & Eileen Jay (School Committee), Sandy Beebee([EC),Ellen Cameron & Julie Ann Shapiro /COA\. Sub -Committee: Lincoln Park. HIGHLIGHTS: � Expanded Adaptive and Inclusion Services for residents of all abilities, including an expansion of the CTRS presence. 0 Continued to include recommendations from the 2027 Recreation Facilities and ADA � Completed the following Capital Projects: and Field Reconstruction (C ), Enterprise). Athletic Facility Lighting (CPA), Center Track � implemented the [bnlrnunkv Needs Assessment process for future fiscal and operational planning for the Town. � Transitioned to virtual programming and service delivery for the community to access health and wellness opportunities safely from their homes during the pandemic. 0 Expanded Committee membership to 7 beginning in FY2022. 9/15/2021 10:33 AM Frederick DeAngelis,Chuinnau IjeubRhodes, Vice Chair Lisa O'Brien Christian Boubv U Francesca Pfrommer Lexington TownTown�7 e.^pv�gtmn Recreation Committee Tel: (78l)698-4800 Fax: (781) 861-2747 Recreation Committee September 2021 Liaison Reports ------------------------------------------------------------------------------ Lincoln Park Sub -Committee, respectfully submitted by Lisa O'Brien Lincoln Park's next meeting will be Monday, September 27th at4.]Opmn. Brian is going to coordinate t0get ODTown Calendar. Agenda will include StO[yVVGlkvote a3well as grass installation for scoreboards (final proposal from landscaper with costs will be made available); discussions also re: ongoing maintenance and capital considerations. School Committee, respectfully submitted by Deepika Sawhnev l)The testing protocol for our schools: From Dr. Hackett's Superintendent report - A. LPS COVID-19 Testing Consent Form OnAugust2[i2021.|sentiheLexngtonSchOO|[0nnnounhvthisetterregan]inQumdatedCOV|O- 19 Back -{O -School Protocols, including FAQs related to LPS COV|D-19 testing. For the 3021-22 school year, our multifaceted testing program will be multifaceted and include: • Individual testing on symptomatic individuals: is a nasal swab performed by the school nurse when individuals present symptoms while atschool ° Individual testing on close contacts (Test and Stay): is a daily nasal swab performed by the school nurse Or Other qualified healthcare professional for 5-7 days following exposure; for osynnpiorn81icclose contacts *Routine COV|Q-19 safety check (previously referred to as "pooled testing"): collecting and performing test on a group ofsamples for routine testing. For efficiency and similar to our program last year, any necessary fo||ovv'Up individual testing would happen on the same individual samples already sent to the lab. LPS will provide more details in the coming weeks about how staff and students will participate in routine safety checks. Please note for students and staff to participate in any aspects ofour testing program, we must have a signed consent on file before any testing can occur. If we do NOT have a consent form on file, students will need to be quarantined for a minimum of 7 days in the event they are identified as8close contact orexperiencing COV|D-l9symptoms. 2) The policy changes with respect to vaccines for afterschool sports and extracurriculars: From the policy: 1625 MASSAC8 3NTSAVtNIT^LD(IN0nNMASSACHUSF,USU2420 File: EBC Supplemental - INTERIM POLICY ON ISSUES RELATED TO THE COVID-19 PANDEMIC Eligibility for participation in extracurricular activities, including sports (File JJ) Subject tolaw, regulation, and standards established b«the appropriate and legitimate regulatory body, the Superintendent may propose changes to district protocols for participation in extracurricular activities, including sports, subject to the rules established by the Massachusetts Interscholastic Athletic Association. For the 2021-2022 school year, vaccination against SARS-CoV-2 is required for all age -eligible students to participate in school -sponsored sports and rostered extracurricular activities that occur outside ofthe school day. Exceptions tothis requirement can be found in File JLCB. Age -eligible students n. Students who participate inschool-sponsored sports and/or rostered eXin3CU[[iCUl8[Gthat occur outside Ofthe school day are required to be vaccinated except inthose exceptional circumstances where weekly COV|D-I9testing will be allowed. b. Students who are awaiting vaccination are required to participate in state-sponsored testing through Lexington Public Schools orsubmit evidence nfanegative COV|D'I9test onaweekly basis. Age -ineligible students a. Students who will become vaccine -eligible during the sports/extracurricular Seasonin question must be vaccinated within six weeks of becoming eligible. b. Students are required to participate in state-sponsored testing through Lexington Public Schools orsubmit evidence ofmnegative COV|D'19test onaweekly basis. 2 =�� Town of ��e^"^«�gtu"n Recreation and Community Programs Melissa |0ottite,CPRP Tel: 781-698-4800 Director of Recreation and Community Programs Fax: 781-861-2747 Recreation &CoKMmunity Programs September 2021 Report News & Updates: w The Community Center resumed full hours of operation on Tuesday, September 7, 2021 since the closure and modified hours during June 3020 - August ZO2l. For more information, please visit w The Irving H. Mabee Town Pool [brnp|ex Closed for the season on Monday, September 6m. As the season was coming to an end and fall sports began, the LHS swim team was able topractice atthe Pool during the week ofAugust 3Om from 7-8:30prnonce public swim hours ended. • Fall 2021 Registration opened on Wednesday, August 25th with sessions beginning the x m vveekofSepternberE/ an�Septemn�erl3 . Programs can befound here- * Congratulations! Lexington has been selected as a top (Tier 1) level community for USTA National (United States Tennis Association) tobeengaged and advise onfuture "national level" tennis/park focused endeavors. |naddition, the U5T4National Staff will be hosting a USTA Executive Ambassadors group to meet quarterly with all Tier 1 agencies osthe country's top performing park systems. This ioa great compliment and recognition of the Town's continued commitment to the Parks and Recreation system � The CHNAl5POP UPprograms continue tobeahuge success. The August event celebrated National Golf Month on Friday, August 27 th with over 100 attendees visiting the Community Center lawn and a|eefor 8nice cream social and celebrate all things summer! Here are some fun photos from the event. ]9MARRETTROAD, LEXINGTON, MA82421k09cc Lisa George -Cox Memorial Bench is expected to be installed in mid-October, a link on the Park web page and {}Rcode can befound here: UCL —United Cricket League hosted onopen house event ong/10/21aiHastings Park as an opportunity for the community to try the game and learn more about ways to get involved. This was followed hythe league end ofseason match played atCenter Recreation Field under the lights. Athank you toLUSCwho was able tOadjust previously permitted use at the Center Track in order for UCL to hold the end of season tournament 81anearlier time. Temple Isaiah utilized the parking lot at Lincoln Park as well as the Old Reservoir for their Rosh Hashanah ceremonies onTuesday, September 7m . During the December 2Ol9Recreation Committee meeting, amotion unanimously passed "to approve the pilot program for portable restrooms consistent with the memo tVthe Recreation Committee from the Director OfRecreation." The memo isattached to this report. The Portable Toilet pilot program was delayed due tothe restrictions and guidelines inplace due tOthe CoVid-19paOdeDliC. The pilot program will he implemented this fall 8tfive Vfthe six locations. Bridge will not beincluded based on the permitted use. Each ofthe five parks will have /1\ADA unit that will be cleaned weekly. The Storyvva|ksupplies have been ordered and isexpected for install inearly/mid October. The Cary Library iscoordinating installation with DPW while the Lincoln Pork Sub -Committee finalizes the approval on the suggested locations at Lincoln Park. Budget & Capital: o Special Fall Town Meeting — Center Restrooms & Storage is scheduled to be on the • Center Recreation RestroornSand Storage — the organizations (LYLLLL, LHS and DPW) cleaned out their respective storage units at the Park during the last week of August. DPW provided 8durnpster. Each organization will besharing any changes in storage needs otthis project continuesandpn2pan2sforLheFallTovvnMe2ting. o Dates for Rindge Playground Community meeting will be set for sometime in October. o Park Improvements — Hard Court Resurfacing at Center Recreation Center will have community outreach meetings beginning inlate fall. o Staff continues tVwork onthe FYI023operating budget. The deadline tosubmit the operating budget isFriday, October 21t. Pine Meadows: � The game of golf continues to be a popular, safe, and healthy activity for the community to participate. Some mid-day play has started todecrease asmore and more people return to work and less remote hours. * Fall fields, LP8 impact on cornnnunkv use (hours/cost/impact of#oftearns/a1h|etes, rent off site) Due toafew factors for the fall season, the LHS athletics will beholding a few more back tnback games this season. This means @ direct impact nn the community use hours traditionally available for the youth and adult organizations. Atotal ofS].5additional hours have been permitted tU LPSAthletics. |naddition tVthe impact onthe leagues and players, there is a direct loss ofrevenue tDthe Recreation Enterprise FUnd/|ossof permit revenue. The estimated loss ofrevenue for the fall is $1172.50 Additionally, Lexington Youth Lacrosse (LYL) has had to secure fields outside ofLexington inorder tOaccommodate their needs. LYLreports that 4iemrns/b6players have been displaced with Ghours offield space out of Lexington. Rental at The Edge in Bedford from O-lIarn on Saturdays and impacts approximately 8Oplayers inthese session. LYL use ofsynthetic fields was also moved to the Worthen Road Practice field 1.5 hOU[S 8 week with additional rental times at Hayden Recreation. This impacts approximately 60 players in this session. o Lexington United Soccer Club /LU5[\isthe most affected bythe extended use. The total number of hours, player/teams totals and outside rental information is not yet available. Therapeutic Recreation & Inclusion Services * FaUnevvs|etter- • The outdoor tent continues tosee use and is a great alternative tOindoor meetings and classes. During the September I3,2O21Fund for Lexington meeting, funding 8 additional weeks of the tent rental was approved which will extend community access through early November. • AStorvWa|khas been installed atthe Community Center for the month 0fSeptember. Visitors can enjoy Jane Yolen's How Do Dinosaurs Eat Their Food? along with a scavenger hunt when they walk along the path outside the Community Center. This activity was coordinated byFamily ACCESS Community Connections. Recreation Division: Programming: * All day camps, sports clinics, and tennis programs ended for the summer on Friday, August 27m. Overall, the summer was 8huge success asapproximately I,90Ochildren participated in the various youth camps and programs that the department offered this summer. w The fall NFL FLAG Football League season began this Sunday, September l2 tx . There are 24teams with 27]participants inthe league this fall. Operations: � The Irving H. Mabee Town Pool Complex: Todate, the total swim passes sold are comprised ofthe following memberships: o Family —5O7/45Zresident and l37non-reSident\ o Individual —]15(26Oresident and 48non-re5ident) o Senior —2l8/l92resident and 27 non-resident) n 1120 Total passes were sold for the 3021 season We sold 1120 memberships, which is more than then back in 2019. This is without swim lessons, where participants are required to have a membership. I have received a lot of complements regarding the how great the staff were and how clean the facility was all season so this summer was a great success! There were about twice as many daily passes purchased this summer with 8825 sales compared to 4200 back in 2019. Hopefully this trend continues for future seasons! Old Reservoir Complex: o The Reservoir was opened this season, but the days and hours were abit modified than iDpast seasons. VVPchoose tOopen the Reservoir from IZ' 7:3Opnn,opposedto1O:3O-7:OOprnsincevved\dnothavennanypeopleconoein earlier in the day. The Reservoir was only open on weekends as well during the Preseason (June 5 —June 27), opposed to being open Sunday -Saturday in the past. o The season at the Old Reservoir went well, but we did not have many people come through the facility on a regular basis, which has been more of the norm in the last few years. Most people who came by had a swim membership so there were not many patrons who paid the daily fee. o The Old Reservoir was scheduled to close up at the end of the regular season on August 22nd, however due to inclement weather, it ended up closing down on tH August 18 LexingWn M -CREATION &COMMUNITY A 0 ("KA M S MEMOP,ANDLJM TO: Recreation Committee FROM: Melissa Battite, Director DATE: December 18, 2019 SUBJECT: Portable Restrooms The department receives input throughout the year, predominantly spring and fall, about the inadequate access to restrooms throughout the park system. As the demands for seasonal s to restrooms is a growing, several sports organizations have been securing portable restrooms at a few of the locations to ease the burden. Additionally, there has been some misuse of the parks at locations where access is not readily available. Currently, LUSC (Lexington United Soccer Club) secures a seasonal portable restroom at Diamond and Estabrook. LLL (Lexington Little League) secures a season portable restroom at Harrington and Bridge. The community has also provided input for two locations that experience high use, which include Clarke and Adams. I propose that the Recreation and Community Programs department pilot a program at the six locations Diamond, Estabrook, Harrington, Bridge, Clark and Adams. This pilot program would include the Fall 2020 and Spring 2021 seasons. The sports organizations would no longer secure private leases on public park space during this pilot period. The program would be evaluated in late spring 2021 for your review and next steps. It is estimated that the 6 locations for 6 months (September -November and April —June) would be approximately $4800. The town would secure the lease and absorb this expense within the Recreation Enterprise Fund through fees associated with the field permitting program. Thank you. MEMORANDUM TO: Recreation Committee FROM: Melissa Battite Director ofRecreation 0'Community Programs DATE: September l4,2O21 SUBJECT: 5 year capital plan Enclosed isadraft ofthe 5year capital plan. During the August meeting, the upcoming FY23 projects were highlighted along with some considerations for inclusion in the 5 year capital plan. These considerations come from community requests via the Recreation Committee or directly toTown staff, in addition to life cycle, health & safety compliance and/or improved technology and the key findings of the 2020 Community Needs Assessment and 2017 ADA Compliance Study. Below includes notes onthe FYZ3project requesbandnevventhestothe5yearp|an,in addition to the full summary of the requests that is attached in the draft 5 year plan. • Park and Playground Improvements 0nneensPark — Playground Replacement. End of life, increased request based onquotes solicited inAugust 2O21. This has been in the 5 year plan for 5years. • Park Improvements —Athletic Fields — Fiske. Increased request based on cost of living and current market. This has been in the 5 year plan for 5 years. • Park Improvements - Hard Court Resurfacing & Reconstruction — Center Recreation Gallagher Tennis Courts and FariaSBasketball Courts - This project vviUrequire community outreach meetings to best determine the timing for stakeholders and park impacts. This has been inthe Syear plan for 5years. w PineMeadoma|nnpnmvennents—nevvfairmmK@reensideandreconstructionofbunkens, and tees and associated with acombination ofholes I,7,U,and 9. Additionally, complete the design and engineering associated with cart path at5. This has been in the 5 year plan for 5 years, with the exception of the cart path at 5 which is a new introduction. ° Town Pool Water Heater —Swimming Pool. After a preventative vva|kthrnugh of the facility with DPF, the existing heater is within its last year of life cycle. This has been in the 5year plan for 2years. * Community Park Master Plan Lincoln Perk. This 5year capital plan /FY23-27\ reflects the possibility of5capital projects occurringsirnu|taneous|yand/orinbackto-back years atLincoln Park. This master plan will bring the goals ofthe many uses wfthe park, recreation, and conservation together through the Lincoln Park Sub -Committee, Recreation Committee, Conservation Committee, and community stakeholders. This is a new introduction to the 5 year capital plan. * Park|rnprovernenLs—SheAnnenities. This istoaddress the deficiency and replacement needs for amenities within the park system that are not recovered through fees/revenue. The site visits completed aspart ofthe 2020Community Needs Assessment has identified conditions, deficiencies and needs within the park system. This isanew introduction tothe 5year capital plan. * Lincoln Park Field Improvements — Field study of the field conditions in preparation of the replacement of the 3 synthetic turf fields at the park. This is a new introduction to the 5year plan. m Pine Meadows Improvements — annual request and uses p|ay8bi|ky staff input, and guidance from the Annual USGA report and site visit to determine project. w Pine Meadows Equipment — annual request and uses the life cycle, course needs, and new technology to prioritize replacement and/or new purchases. * Lincoln Park Improvements — replacement of field #3 as it nears end of life. ^ Park and Playground |nnprovenoents—rep|acennent of the Center Recreation Complex Skate Park with new equipment and athletic lighting. This is new introduction tothe 5 year capital plan. 0 Lincoln Park Fitness Station Equipment — end of life cycle. This is a new introduction to the Syear capital plan. Considerations for discussion - not inany particular order 1 Swimming Pool * Additional shade structure • Additional spray feature for the Wading Pool * Replace lockers inlocker rooms • Additional play equipment etSutherland Park *needs avote ^ Poured inPlace (P|P) surfacing for playground improvements (school playgrounds will all have PIP byFYZ5) • Add water elements toplayground/parks 0 End of life replacements m Shade Structure otCenter Recreation Complex 3 Review nfConservation projects and streann|ine when/where appropriate and able. N ^} Recreation & Community Programs 3t FY2023-27 Capital Summary ID# j Program Name FY2023 FY2024 I FY2025 FY2026 I FY2027 Funding Source 6201 I Pine Meadows Improvements $ 95,0001$ -1$ 250,000 $ - $ 60,000 Recreation 6203 Pine Meadows Equipment $ -1$ 95,000 IS - $ 75,000 $ 30,000 Recreation Total Recreation Enterprise Capital Programs $ 95,0001$ 95,000 $ 250,0001$ 75,000 $ 90,000 Rec-23-1 ID# Project Name FY2023 FY2024 FY2025 FY2026 FY2027 Funding Source Rec-23-1 Pine Meadows Clubhouse Renovation Is - $ 120,000 $ - $ 1,680,000 $ - Cash Capital, Bonding Rec-23-2 i Lincoln Park Field Improvements $ - $ - $ 775,000 $ 806,000 $ 838,000 mat aOtherBonding, CPA, Rec-23-3 Town Pool Water Heater Replacement $ 30,000 $ - $ - $ - $ - Cash capital Total Recreation Capital Projects $ 30,000 $ 120,0001$ 775,0001$ 2,486,000 $ 838,000 $ - ID# j CPA Project Name FY2023 FY2024 FY2025 FY2026 FY2027 Funding Source Rec-CPA-1 Park and Playground Improvements $ 200,000 $ 150,000 $ 800,000 $ 835,000 $ 250,000 CPA Rec-CPA-2 Park Improvements - Athletic Fields $ 250,000 $ 285,000 $ 480,000 $ - $ - CPA Rec-CPA-3 Park Improvements - Hard Court Resurfacing $ 2,500,000 $ - $ - $ - $ - CPA Rec-CPA-4 Park Improvements - Site Amenities $ - $ 30,000 $ - $ 30,000 $ - CPA Rec-CPA-5 I Cricket Field Construction $ - $ - $ - $ 200,000 $ - CPA Rec-CPA-6 Community Park Master Plan - Lincoln Park $ 100,000 $ - $ - $ - $ - CPA i Rec-CPA-7 I Lincoln Park Fitness Stations Equipment s $ - $ - $ - $ - $ 50,000 CPA Rec-23-2 Lincoln Park Field Improvements $ - $ 25,000 $ 425,000 $ 442,000 $ 460,000 Cash=Bonding, CPA, Private, a ai Total Recreation CPA Projects $ 3,050,000 $ 490,0001$ 1,705,000 IS 1,507,000 $ 760,000 Recreation - Page 170 Printed September 15, 2021 71 % Town of'Lexie gton - FY2023-2i Capital Program Investment Program Name: Pine Meadows Improvements Date: 8/30/05 Program ID: 6201 Department: Recreation& Community Programs Revised: 9/14/21 Submitted by: Melissa Battite Phone: (781) 698-4801 Email: mbattite@lexingtonma.gov Description of Capital Program: In FY2023, the Recreation Committee requests $95,000 from the Recreation Enterprise Fund to install new fairway bunkers on the 2nd and 7th holes, install a greenside bunker at the 8th hole, reconstruct the bunker on the 9th green and expand the tee at the 9th hole, reconstruct the middle tee on the 8th hole, and complete the design and engineering work associated with the cart path renovation on the 5th hole. Goals of Capital Program: Pine Meadows is a valuable open space and recreational resource for the Town of Lexington. It is used year round by residents to play golf, cross-country ski, sled and walk. Improvements are necessary to provide quality playing conditions. This will ensure an enjoyable golfing experience resulting in more play and revenue for the Town. Impact if Not Maintained: These enhancements will help to improve the overall playability of the golf course. If these improvements are not undertaken, the conditions will worsen, which could result in a reduced number of rounds played, and will continue to decrease the ability to maintain these areas. Major Spending over Past 5 Years: The green on the 4th hole was reconstructed in FY2017. In FY2020, the bunkers on the 61h and 7h green were reconstructed, the bunker on the 5`h hole was converted to a grass hollow, the forward tee on the 6"' hole was rebuilt, drainage work on the 7`h hole was completed, the cart paths on the I" hole by the green to the 2nd tee and from the parking lot to the 5th tee were reconstructed, the cart path by the 4`h green was relocated and the cart path on the 6`h and 7t" holes were repaired and extended. A total of $140,000 was appropriated for both of these projects. Work Currently Underway: The design and engineering work associated with the drainage improvement project on the I st and 2nd fairways, which is scheduled for FY2025, will be taking place in FY2022. Planned Spending for Next 5 Years: FY2025: $250,000 - Complete the drainage improvements on the I st and 2nd fairways and renovate the cart path on the 5th hole. The design and engineering phase for the drainage improvements will be completed in FY2022 and the design and engineering phase for the 5th cart path will be completed in FY2023. FY2027: $60,000 - Reshape the 2nd green (which will involve stripping the sod, shaping the green, and replacing the existing sod), cart path and restoration work at the 7th tee, extend the 3rd fairway to the left and install irrigation, and complete a new Master Plan (replacing the 2006 Master Plan, which is substantially complete). Basis for Cost Projections: The cost is based on an estimate provided by a golf course architect in August 2021. All cost estimates are provided in then -year dollars (FY2023 request in FY2023 dollars, FY2025 request in FY2025 dollars, FY2027 request in FY2027 dollars). Stakeholders: Residents, Non -Residents, DPW, Recreation & Community Programs, Recreation Committee, Lexington High Golf Team, Minuteman High School, and the Conservation Commission Operating Budget Impact: A reduction in revenue if the fairways, greens, and tee boxes are not playable. Recreation - Page 173 Printed September 15, 2021 Funding Source: Recreation Prior Authorizations: Town Meeting Authorized Expended Encumbered Remaining Returned 2016/9 $ 65,000 $ 64,677 $ $ $ 323 2019/15A $ 75,000 $ 69,859 $ $ $ 5,141 2021/11A $ 25,000 $ — $ $ 25,000 $ — Totals $ 165,000 $ 134,536 $ $ 25,000 $ 5,464 Funding Request: Design/Engineer $ Construction $ Equipment Contingency $ Totals $ CPA Amount $ FY2023 FY2024 FY2025 FY2026 FY2027 25,000 $ 20,000 $ 15,000 60,000 $ 210,000 $ 40,000 10,000 95,000 $ 20 250,000 $ 5,000 60,000 Recreation - Page 174 Printed Septetnber 15, 2021 417, Townof.Lexin n - FY2023-27 Capital Program Investment .r 9to Program Name: Pine Meadows Equipment Date: 8/08/11 Program ID: 6203 Department: Recreation & Community Programs Revised: 9/14/21 Submitted by: Melissa Battite Phone: (781) 698-4801 Email: mbattite@lexingtonnia.gov Description of Capital Program: The past and future success at Pine Meadows can be attributed to the ongoing investment in golf course infrastructure and equipment to maintain the 88 acres of property. Sufficient equipment is needed to properly maintain the golf course on a daily basis and also to provide superior playing conditions on a consistent basis throughout the year. Goals of Capital Program: Each day, the course is open for play from dawn to dusk. The golf course is staffed so that the greens, tees, and fairways can be cut with minimal disruption of play while providing outstanding playing conditions. The quality of cut and height of cut from mowers ensures that golfers will be able to quickly locate their ball and be able to hit a satisfactory shot resulting in an improved pace of play. An improved pace of play and superior playing conditions ensures an enjoyable golfing experience resulting in more play and revenue to the Town. The overall aesthetic quality of a golf course is very important to its ultimate financial success. The good maintenance of a golf course requires equipment that operates efficiently, effectively, and safely. Electric and/or hybrid options will be considered when purchasing new equipment. Impact if Not Maintained: If the turf and fairways are not maintained properly, it will affect the quality of play and the Town will lose customers, thus reducing revenue. In addition to the financial loss, employee safety issues arise if machinery is operated beyond its reasonable life span. Major Spending over Past 5 Years: In FY2018, a new Toro Triplex mower for the greens and an Excel Hustler Trim mower were purchased. In FY2019, a new Toro Triplex mower for the tees and fringe, a Smithco Super Bunker Rake, and a Lely Spreader were purchased. In FY2022, a new Toro Fairway mower will be purchased. A total of $177,000 was appropriated for this new equipment. Work Currently Underway: A new Toro Fairway mower will be purchased in FY2022, replacing the 2012 fairway mower. The life expectancy of a fairway mower is 10 years. Planned Spending for Next 5 Years: FY2024: $95,000 - Purchase a new Turfeo Top Dresser replacing the 2001 Turfco Top Dresser and a Toro Groundsmaster 4500D Rough Mower replacing a 2015 Toro Groundsmaster 4500D Rough Mower. The life expectancy of a top dresser is 15 years and 8 years for a rough mower. FY2026: $75,000 - Purchase a new Toro Triplex greens mower replacing the 2009 Jacobsen mower, a buffalo blower replacing the 2007 buffalo blower, and a Toro Workman utility vehicle replacing the 2006 Toro Workman utility vehicle. The life expectancies of a greens mower and buffalo blower are both 10 years and 13 years for a utility vehicle. FY2027: $30,000 - Purchase a new Toro fairway aerator replacing the 2006 Toro fairway aerator. The life expectancy of a fairway aerator is 12 years. Recreation - Page 175 Printed September 15, 2021 Basis for Cost Projections: August 2021 cost estimate. All cost estimates are provided in then -year dollars (FY2024 request in FY2024 dollars, FY2026 request in FY2026 dollars, FY2027 request in FY2027 dollars). Stakeholders: Residents, Non -Resident Golfers, Recreation & Community Programs, Recreation Committee, Lexington Public Schools Golf Team, Minuteman Tech High School Golf Team Operating Budget Impact: Reduce repair costs. Funding Source: Recreation Prior Authorizations: Town Meeting Authorized Expended Encumbered Remaining Returned 2017/11 $ 55,000 $ 51,812 $ $ $ 3,188 2018/15 $ 60,000 $ 60,000 $ $ $ — 2021/1113 $ 62,000 $ — $ $ 62,000 $ Totals $ 177,000 S 111,812 $ $ 62,000 $ 3,188 *Data current as qJ'August 31, 2021. Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Design/Engineer Construction Equipment $ 95,000 $ 75,000 $ 30,000 Contingency Totals $ 95,000 $ $ 75,000 30,000 CPA Amount $ — S $ — Recreation - Page 176 Printed September 15, 2021 Town of Lexington - FY2023-2 7 Capital Improvement Project Project Name: Pine Meadows Clubhouse Renovation Date: 8/15/17 Project ID: Rec-23-1 Department: Recreation & Community Programs Revised: 9/14/21 Submitted by: Melissa Battite Phone: (781) 698-4801 Email: mbattite@lexingtonma.gov Description of Project: The Recreation Committee is requesting $120,000 in FY2024 for the design and engineering costs associated with a renovation of the clubhouse at the Pine Meadows Golf Club. This request was initially submitted in FY2021 and FY2022, but was postponed as a result of the COVID-1 9 pandemic. The clubhouse was constructed prior to the Town's acquisition of the course in 1988 and due to its current condition, the building is in need of a complete renovation. The project will include renovating the men's and women's bathrooms as well as the main concourse area, repairs to the plumbing system and installation of all new fixtures (toilets, sinks, drinking fountain), new windows, and replacement of the existing roof. Additionally, in its current condition, the clubhouse is not ADA -compliant. This project will address the accessibility issues in the clubhouse that were cited in the 2017 ADA Compliance Study, which was identified as the #2 priority by the Commission on Disability, Going forward, Pine Meadows will become compliant with ADA and a facility that is welcoming to people of all ages and abilities. The Pine Meadows Golf Club is a crown jewel of the Town's Recreation infrastructure and this renovation will support the continued, successful operation of the course for the next generation. Following the design and engineering phase for this project, construction is scheduled to take place in FY2026. Justification/Benefit: The Pine Meadows Golf Club is a recreation facility that is open during the spring, summer, and fall. The course averages approximately 33,000-35,000 rounds played each year and generates approximately $800,000 in revenue each season. With that being said, the course has experienced a significant increase in demand during the COVID-19 pandemic, which is reflected in 46,072 rounds being played and $1,162,255 generated in revenue during FY202 1. While the facility continues to operate safely, the clubhouse was built prior to the Town's acquisition of the golf course in 1988 and no significant renovations have taken place over the past 30 years and is currently not in compliance with ADA. The design and engineering phase will provide the Town with a detailed list of recommended upgrades and repairs needed, thus allowing the Town to plan and budget the upgrades and repairs effectively and responsibly. Impact if Not Completed: If immediate needs are not identified and addressed, the condition of the Pine Meadows clubhouse will continue to deteriorate, which will impact the Town's ability to attract golfers of all ages and abilities in addition to decreased revenues. Timeframe: 2023-2026 Replacement Frequency: 30 years Recreation - Page 179 Printed September 15, 2021 Basis for Cost Projections: Cost estimate provided in October 2020 based on similar projects. Annual inflation of 4% has been added to the construction phase of the project. All cost estimates are provided in then -year dollars (FY2024 request in FY2024 dollars, FY2026 request in FY2026 dollars). Stakeholders: Residents, Non -Residents, Recreation & Community Programs, Recreation Committee, DPW, Lexington Public Schools Operating Budget Impact: Maintenance and repairs to the clubhouse has become an annual occurrence which impacts the operating budget. Funding Source: Cash Capital, Bonding Prior Authorizations: None. Funding Request: FY2023 111Y2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer 120,000 Project Management $ 25,000 Construction $ 1,555,000 Equipment Contingency $ 100,000 Totals $ $ 120,000 $ $ 1,680,000 $ CPA Amount $ $ — $ $ — $ Recreation - Page 180 Printed September 15, 2021 Town of Lexington - FY2023-2 7 Capital Improvement Project Project Name: Lincoln Park Field Improvements Date: 8/28/19 Project ID: Rec-23-2 Department: Recreation& Community Programs Revised: 9/14/21 Submitted by: Chris Filadoro, Phone: (781) 274-8355 Email: cfiladoro@lexingtonma.gov Description of Project: The Recreation Committee requests $25,000 in FY2024 to complete a feasibility study which will determine the extent of the field replacement that will be needed at Lincoln Park. The results of the study will reveal if a full profile replacement will be required or if some of the subsurface or base materials can be reused. Upon completion of the feasibility study, the three synthetic turf fields at Lincoln Park will be replaced in three subsequent years, with the Recreation Committee requesting $1,200,000 in FY2025 to replace the synthetic turf field at Lincoln #1, $1,248,000 in FY2026 to replace the synthetic turf field at Lincoln #2, and $1,298,000 in FY2027 to replace the synthetic turf field at Lincoln #3 (each project will also include work within the vicinity of the field and these quotes are not included in the initial estimates. One example of this is in speaking with the Conservation Commission, drainage improvements will be made to the area surrounding Lincoln #2 when that field is replaced). The Lincoln Park fields see excessive use and timely replacement is critical to provide safe and playable fields for youth and adult sports organizations, the community at large, and the Lexington Public Schools. These requests represent a three-phase capital improvement program to address safety and playability at Lincoln Park between FY2025-FY2027. The synthetic turf at each field will be removed, partially recycled, and replaced with a similar synthetic turf and infill to provide a safer and more uniform surface. Depending on the results of the feasibility study, the pad underneath the synthetic turf may also need to be completely replaced. The drainage will be inspected and repaired (if necessary) and the subsurface will be laser -graded prior to the synthetic turf installation. Each project also includes replacement of the wooden anchors and edging around the perimeter of the field and rehabilitation of the walkways and guardrails at the site. In 2003, Lincoln Park was renovated to include the installation of three synthetic turf fields. The synthetic turf at Lincoln #1 and #2 was last replaced in 2015 and the synthetic turf at Lincoln #3 was last replaced in 2016. Each of those replacements included a 10 -year warranty. The turf at all three fields will need to be replaced based on the life expectancies of the fields and due to the excessive amount of use that the fields receive. Justification/Benefit: Lincoln Park was reconstructed back in 2003 and the synthetic turf playing fields have been a valuable asset to the community. Safety for all participants is a top priority and maintaining and improving upon the safety of the fields is a major benefit to all users. The Town of Lexington athletic fields are heavily used by the community and the synthetic turf allows for increased use during most weather conditions without damage to the turf. Impact if Not Completed: The impact of not approving this request will be a continuing deterioration of the synthetic fields which may lead to an unsafe playing surface and game cancellations and the facility closing. This would impact the Lexington Public Schools, youth and adult leagues, and residents. Timeframe: 2023-2027 Replacement Frequency: 10 years Recreation - Page 181 Printed September 15, 2021 Basis for Cost Projections: Cost projections are based on similar past projects and information provided by vendors and architects in September 2021. The synthetic turf, pad, and infill are not part of the CPA request. All cost estimates are provided in then - year dollars (FY2024 request in FY2024 dollars, FY2025 request in FY2025 dollars, FY2026 request in FY2026 dollars, FY2027 request in FY2027 dollars). Stakeholders: Residents, Non -Residents, Lexington Public Schools, Youth and Adult Organizations, DPW, Recreation & Community Programs, Recreation Committee Operating Budget Impact: DPW staff hours, equipment, and materials costs should decrease with improved field conditions that will require routine maintenance and not emergency repairs. Funding Source: Cash Capital, Bonding, CPA, Private, Other Prior Authorizations: Town Meeting Description Authorized Expended Encumbered Remaining Returned 2013/8H Lincoln Park Field Improvements $ 565,000 $ 564,999 $ $ $ 1 2014/8H Lincoln Park Field Improvements $ 620,000 $ 616,521 $ $ $ 3,479 2015/8M Lincoln Park Field Improvements $ 650,000 $ 649,968 $ $ $ 32 Totals $ 1,835,000 $ 1,831,488 $ $ $ 3,512 Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer $ 20,000 $ 75,000 $ 75,000 $ 75,000 Project Management Construction $ 1,025,000 $ 1,073,000 $ 1,123,000 Equipment Contingency $ 5,000 $ 100,000 $ 100,000 $ 100,000 Totals $ — $ 25,000 $ 1,200,000 $ 1,248,000 $ 1,298,000 CPA Amount $ — $ 25,000 $ 425,000 $ 442,000 $ 460,000 Recreation - Page 182 Printed Sey)tember 15, 2021 -71 Town ofLexington - FY2023-2 7 Capital Improvement Project Project Name: Town Pool Water Heater Replacement Date: 10/5/20 Project ID: Rec-23-3 Department: Recreation& Community Programs Revised: 9/14/21 Submitted by: Peter Coleman Phone: (781) 698-4803 Email: pcole,man@lexingtonma.gov Description of Project: The Recreation Committee requests $30,000 in FY2023 to replace the water heater at the Irving H. Mabee Town Pool Complex. This request includes materials and labor costs associated with the plumbing and electrical work that will be required to dispose of the existing water heater and install a new water heater at the facility. Justification/Benefit: The Irving H. Mabee Town Pool Complex is a popular and highly utilized recreation facility during the summer. While the facility continues to operate safely, the current water heater was installed back in 2013 and it has a life cycle of 10 years. The water heater provides warm water to the sinks and showers in the women's and men's locker rooms and the family bathroom as well as to the outdoor showers on the pool deck. Providing hot water to these areas is a requirement of the Massachusetts Department of Public Health code for public swimming pools, so the water heater must be replaced to ensure successful operation of the facility moving forward. Impact if Not Completed: If the water heater is not replaced and it fails during the summer, the Town Pool may be closed for an extended period of time during the peak season, which would negatively impact pool users and significantly decrease revenue. Timeframe: Fall 2022 Replacement Frequency: 10 years Basis for Cost Projections: Cost projections are based on similar past projects and a cost estimate was provided by the Facilities Department in September 2021. This cost estimate is in then -year dollars (FY2023 request in FY2023 dollars). Stakeholders: Residents, Non -Residents, Recreation & Community Programs, Recreation Committee, DPW, Facilities Department, Health Department, Lexington Public Schools Operating Budget Impact: Failure to replace the hot water heater will result in higher repair costs to keep the current unit operational. Funding Source: Cash Capital Prior Authorizations: None. Recreation -Page 183 Printed September 15, 2021 Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer Project Management Construction $ 6,000 Equipment $ 21,000 Contingency $ 3,000 Totals $ 30,000 $ $ $ $ CPA Amount $ — $ $ $ $ Recreation -Page 184 Printed September 15, 2021 'g - 40 �Y ;�qr�� Town of Lexington - FY2023-27 CPA Project Program Name: Park and Playground Improvements Date: 8/30/05 Program ID: Rec-CPA-1 Department: Recreation& Community Programs Revised: 9/14/21 Submitted by: Peter Coleman Phone: (781) 698-4803 Email: pcoleman@lexingtonma.gov Description of Capital Program: The Recreation Committee requests $200,000 in FY2023 to update and replace the playground equipment and safety surfacing, install fencing around the playground, signage, park benches, and a bike rack at Kirincens Park. The new playground equipment would be designed for children ages 2-12 and poured -in-place (PIP) safety surfacing would be installed at specific locations, which would greatly enhance accessibility to those play elements and significantly reduce the maintenance needed at the site going forward. Once the new play equipment has been installed, an inspection by an independent, third -party company will be completed. Goals of Capital Program: Through the Community Needs Assessment, the playgrounds have been classified as either neighborhood or community parks and they are used frequently by the children of Lexington. The existing play equipment at the various parks is outdated and needs to be replaced. The playground equipment at Kinneens Park was last replaced in 2004. The proposed playground improvements will renovate and rehabilitate existing safety surfacing and equipment so that all sites will be in compliance with local and national health and safety standards. Impact if Not Maintained: Based on the playground audits and the site assessments from the Community Needs Assessment, both completed in 2020, the current playground equipment, use zones, and surfacing are at the end of their life cycle and the CPSC, ASTM, ADA standards have been revised over the years in an effort to maximize safety and accessibility. As the equipment continues to age and deteriorate, more frequent inspections, repairs and equipment removal will be needed to ensure that the users are safe. This is neither cost effective nor efficient. Major Spending over Past 5 Years: In FY2016, the playground equipment and safety surfacing at Marvin Park was replaced. In FY2017, the safety fencing at the Center Recreation Complex along Worthen Road and at Muzzey Field was replaced. In FY2018, new swings were installed at Munroe Park, Franklin Park, and at the Center Recreation Complex. InFY2021,the playground equipment and safety surfacing was replaced and ADA improvements were completed at Sutherland Park. A total of $298,000 was appropriated for these four projects. Work Currently Underway: Funding was appropriated in FY2022 ($170,000) to update and replace the playground equipment and safety surfacing at the neighborhood park on South Rindge Avenue. The project also calls for the installation of fencing around the playground, signage, park benches, trash receptacle, and a bike rack at the park. Additionally, based on the recommendations in the 2017 ADA Compliance Study, the walkway leading to the playground will also be renovated to meet the minimum width regulations and have a running slope of less than 5% and an accessible path leading to the Arlington Reservoir Trail and a connection to the basketball courts will also be installed. It is anticipated that this project will be completed in Spring/Summer 2022. Planned Spending for Next 5 Years: FY2024: $150,000 - Update and replace the playground equipment and safety surfacing and install signage and a bike rack at the Justin Street Park (the playground equipment at this neighborhood park was last replaced in 2003). Additionally, based on the recommendations in the ADA Compliance Study, an accessible route will be installed between the accessible parking area and the playground. Recreation - Page 187 Printed September 15, 2021 FY2025: $800,000 - Update and replace the playground equipment and rehabilitate the rubber poured -in-place safety surfacing at Lincoln Park. The Lincoln Park Playground is one of two community playgrounds in Lexington. The new playground will provide universal access to all play components and elements so the playground will be welcoming and accessible to individuals of all ages and abilities. The playground equipment was last replaced in 2003 and the safety surfacing was last rehabilitated in 2013. FY2026: $835,000 - Update and replace the playground equipment and install safety surfacing at the Center Playground at the Center Recreation Complex. The Center Playground is one of two community playgrounds in Lexington. The new playground will feature poured -in-place safety surfacing (as compared to the engineered wood fiber that is there currently) and will provide universal access to all play components and elements so the playground will be welcoming and accessible to individuals of all ages and abilities. The playground equipment was last replaced in 2006. FY2027: $250,000 - Replace the equipment and install a new lighting system at the Skate Park, located at the Center Recreation Complex. This request is being brought forward based on feedback received from the community about the need for nighttime use at the Skate Park. The equipment at the Skate Park was last replaced in 2014. Basis for Cost Projections: The cost projections are based on similar renovation projects and an updated cost estimate provided in September 2021. All cost estimates are provided in then -year dollars (FY2023 request in FY2023 dollars, FY2024 request in FY2024 dollars, FY2025 request in FY2025 dollars, FY2026 request in FY2026 dollars, FY2027 in FY2027 dollars). Stakeholders: Residents and Non -Residents Operating Budget Impact: The playground equipment will need to be removed if it is deemed unsafe. Funding Source: CPA Prior Authorizations: Town Meeting Description Authorized 2014/81 Park and Playground $ 65,000 $ 68,000 Improvements $ $ — 2015/8i Park and Playground $ 68,000 $ 59,932 Improvements $ — $ 68 2016/8n Park and Playground $ 75,000 - Improvements — $ 170,000 $ — 2017/1 On Park and Playground 2,200 $ 60,000 $ Improvements 2020/10i Park and Playground $ 95,000 Improvements 2021/10b Park and Playground $ 170,000 Improvements Totals $ 533,000 $ *Data current as ofAugust 31, 2021. Recreation -Page 188 Expended Encumbered Remaining Returned 64,828 $ $ $ 172 68,000 $ $ $ — 67,642 $ $ 7,358 $ — 59,932 $ $ — $ 68 92,800 $ 2,200 $ — $ - - $ — $ 170,000 $ — 353,202 $ 2,200 $ 177,358 $ 240 Printed September 15, 2021 Funding Request: Recreation - Page 189 Printed Septetnber 15, 2021 FY2023 FY2024 FY2025 FY2026 FY2027 Design/Engineer $ 10,000 $ 15,000 $ 25,000 $ 25,000 $ 1.5,000 Construction $ 65,000 $ 75,000 $ 300,000 $ 310,000 $ 80,000 Equipment $ 115,000 $ 50,000 $ 430,000 $ 455,000 $ 125,000 Contingency $ 10,000 $ 10,000 $ 45,000 $ 45,000 $ 30,000 Totals $ 200,000 $ 150,000 $ 800,000 $ 835,000 $ 250,000 CPA Amount $ 200,000 $ 150,000 $ 800,000 $ 835,000 $ 250,000 Recreation - Page 189 Printed Septetnber 15, 2021 Town of Lexington - FY2023-2 7 CPA Project Program Name: Park Improvements - Athletic Fields Date: 9/15/06 Program ID: Rec-CPA-2 Department: Recreation & Community Programs Revised: 9/14/21 Submitted by: Chris Filadoro Phone: (781) 274-8355 Email: efiladoro@lexingtonma.gov Description of Capital Program: The Recreation Committee requests $250,000 in FY2023 to renovate the Fiske School Fields. The renovation will include installation of an irrigation system, laser grading, new natural grass, and the installation of new backstops, fencing, and signage. Additionally, based on the recommendations in the 2017 ADA Compliance Study, additional walks will be installed to provide accessibility to the various ball field team areas and these walks should be extended beyond the team areas to provide general access to the shared outfields in the center of the site. The Town of Lexington athletic fields see excessive use and timely renovations and updates are critical to provide safe and playable fields for all user groups. The athletic fields are used by the Residents, Non -Residents, Lexington Public Schools, Youth and Adult League programs, Recreation & Community Programs and by youth & adult organizations and neighborhood families evenings and weekends. Proposed future renovations will include natural turf, drainage, new irrigation systems (where applicable), and site amenities (benches, backstops, etc.). Goals of Capital Program: Safety for all participants is the major concern and improving upon the safety of the fields is the major benefit to all users. The Town of Lexington athletic fields are constantly used by recreation, school, youth, and adult groups. They are in need of major repairs that cannot be completed within the operating budget. There are safety issues with faulty backstops, uneven turf, uneven infield areas, and drainage. This is an ongoing multi-year capital program to address safety and playability concerns and to provide adequate and safe field conditions for neighborhood families, recreation, and school programs. The benefit would be to renovate the fields to a condition where they will be safe, playable, and more easily maintained. Impact if Not Maintained: The Public Works Department oversees the maintenance of the school and Town athletic facilities. The impact of not approving this request is a continuing deterioration of the fields which may lead to injuries and cancellation of games. This will impact the School teams, youth leagues, adult leagues, and Recreation programs and affect the quality of life in Lexington. Major Spending over Past 5 Years: In FY2016, the softball field at Lincoln Park was renovated. In FY2017, the multi-purpose field at Adams Park was renovated. In FY2018, irrigation upgrades were made at 14 athletic fields throughout town (Center, Lincoln, Clarke, Diamond, Estabrook, Garfield, and Harrington). In FY2020, the athletic fields at the Diamond Middle School were renovated. A total of $765,000 was appropriated for these four projects. Work Currently Underway: Funding was appropriated in FY2021 ($370,000) to renovate the Harrington School Field, including excavating the infield areas, laser grading, and new in -ground irrigation systems at the Harrington, Bowman, and Franklin. Additionally, based on the recommendations in the 2017 ADA Compliance Study, at Harrington, the gravel driveway from Lowell Street into the site is being paved to allow for the provision of additional accessible parking and a formal entrance. A route from the school drive to the softball arid baseball team areas is also being created and the team areas are being renovated to provide more appropriate wheelchair space, which would make them accessible. This project is on hold until the status of the proposed Mystic River Watershed stormwater mitigation project is known as ADA components are included in both projects. Recreation - Page 190 1'rinted September 15, 2021 In FY2022, funding was appropriated to renovate the Muzzey Field ($155,000). The renovation will include irrigation upgrades, laser grading, the installation of new natural grass, and an accessible path will also be installed as part of this renovation. This project is scheduled to take place during Summer 2022. Planned Spending for Next 5 Years: FY2024: $285,000 - Bridge Field renovation will include irrigation upgrades, laser grading, new natural grass, and the installation of new backstops, signage, and park benches. Additionally, based on the recommendations in the ADA Compliance Study, the route to the fields from the sidewalk that runs along the school's entrance driveway will be formalized to become compliant with accessibility regulations. The routes between the two softball field and the playground will also be formalized to provide universal access throughout the site, FY2025: $480,000 - Bowman Field renovation will include a complete reconstruction with the installation of a new natural grass Little League field, new irrigation system, new backstops, signage, and park benches. Additionally, the trail that leads to the the abutting Dunback Meadow conservation area will be restored, and based on the recommendations in the ADA Compliance Study, the end curb that runs parallel to the dugouts will be cut back to allow access to the ball field from the parking lot and an accessible path will be installed from the dugout on the parking lot side of the field behind the backstop to provide access to the dugout closest to the playground. Basis for Cost Projections: Cost projections are based on similar past projects and information provided by vendors and architects in September 2021. All cost estimates are provided in then -year dollars (FY2023 request in FY2023 dollars, FY2024 request in FY2024 dollars, FY2025 request in FY2025 dollars). Stakeholders: Residents, Non -Residents, Lexington Public Schools, Youth and Adult League programs, DPW, Recreation & Community Programs, Recreation Committee Operating Budget Impact: DPW staff hours, equipment and materials costs should decrease with improved field conditions that will require routine maintenance and not emergency repairs. Funding Source: CPA Prior Authorizations: Town Meeting Description Authorized Expended Encumbered Remaining Returned 2014/8j - Athletic Athletic Fields $ 100,000 $ 99,820 $ $ 180 2015/8i Park Itnprovernents - Athletic Fields $ 85,000 $ 81,041 $ $ 3,959 2016/8m Park Improvements - Athletic Fields 120 ,000 $ 119 707 , $ $ $ 293 2017/101 Park Impic Frielovedments - Aets thl $ 125,000 $ 104,046 $ $ $ 20,954 2019/14i Park Improvements - Athletic Fields $ 435,000 $ 339,731 $ 33,939 $ 61,330 $ — 2020/10j Park Im- Athletic pFieldrovements s $ 370,000 $ $ 370,000 $ 202 1 /1 Oc Park Improvements - Athletic Fields $ 155,000 $ — $ — $ 155,000 $ — Totals $ 1,390,000 $ 744,345 $ 33,939 $ 586,330 $ 25,386 *Data current as ofAugust 31, 2021. Recreation -Page 191 Printed September 15, 2021 Funding Request: Recreation - Page 192 PrintedSeptember 15, 2021 FY2023 FY2024 FY2025 FY2026 FY2027 Design/Engineer $ 15,000 $ 15,000 $ 25,000 Construction $ 180,000 $ 225,000 $ 405,000 Equipment $ 35,000 $ 25,000 $ 25,000 Contingency $ 20,000 $ 20,000 $ 25,000 Totals $ 250,000 $ 285,000 $ 480,000 $ — $ — CPA Amount $ 250,000 $ 285,000 $ 480,000 $ — $ — Recreation - Page 192 PrintedSeptember 15, 2021 17 c'9 Y A.\ii , Town of Lexington - FY2023-27 CPA Project Program Name: Park Improvements - Hard Court Resurfacing Date: 8/13/07 Program ID: Rec-CPA-3 Department: Recreation & Community Programs Revised: 9/14/21 Submitted by: Peter Coleman Phone: (781) 698-4803 Email: pcoleman@lexingtoma.gov Description of Capital Program: The Recreation Committee requests $2,500,000 in FY2023 to renovate the Farias Basketball Courts and Gallagher Tennis Courts. The project will include the construction of post tension court surfaces for basketball and tennis/ pickleball. In addition to new courts, the project will provide new fencing, athletic equipment, storage shed, shelter, site amenities (park and player benches, receptacles, etc.), tennis practice backboards, and signage. The Farias Basketball Courts, which consists of two fiall-size basketball courts and seven basketball hoops, were last resurfaced in 2008. The Gallagher Tennis Courts, which currently consists of ten tennis courts and four pickleball courts, were constructed in 2000 and these courts have been resurfaced twice since then, most recently in 2015. The tennis practice boards were installed in 2006. Due to the extensive use that they receive, a complete reconstruction of the the courts and the installation of new practice boards will be needed. Goals of Capital Program: The hard court resurfacing program includes resurfacing, painting, and striping the hard court surfaces at Recreation facilities. These facilities include neighborhood Basketball Courts, Center Track and Courts at the Center Recreation Complex, Clarke Middle School, Adams, and Valley. Over the past 20 years, the Town has supported and invested in an upgrading of the Town's recreation infrastructure. The hard court resurfacing program is a program for hard surface athletic facilities which include basketball, tennis, track and the skate park. The program will include resurfacing and painting the hard court surfaces and installing new posts, backboards, nets and rims at Recreation facilities. It is important to maintain these valuable assets in the community to ensure their usability and the safety of the users. It is important to maintain the Town's recreation infrastructure. Impact if Not Maintained: The impact of not approving the request is a deterioration of the athletic facilities and unsafe conditions for the residents in the community. Major Spending over Past 5 Years: In FY2016, the basketball courts at Marvin Park and Sutherland Park were resurfaced. In FY2017, the basketball courts at Kinneens Park and Rindge Park were resurfaced. In FY2020, the basketball and tennis courts at Adams Park were resurfaced and the tennis courts were lined for pickleball. In FY2021, the Valley Tennis Courts were resurfaced and line for pickleball. A total of $331,000 was appropriated for these four projects. Work Currently Underway: The resurfacing, painting, and restriping of the Valley Tennis Courts has been completed. Additionally, at the recommendation of the 2017 ADA Compliance Study, the parking area will be paved. The existing overgrown stone dust path will also be paved to reduce the need for maintenance and the areas at and around the bench and trash receptacle will be maintained as well. Planned Spending for Next 5 Years: Basis for Cost Projections: The cost estimate is based on similar past projects and was provided in September 2021. The cost estimate is provided in then -year dollars (FY2023 request in FY2023 dollars). Recreatior) - Page 193 Printed September 15, 2021 Stakeholders: Neighborhood Families and Residents, Lexington Public Schools, Recreation & Community Programs, Recreation Committee, DPW, Youth and Adult Sports Programs. Operating Budget Impact: Failure to maintain the infrastructure will result in higher repair costs and/or complete reconstruction. Funding Source: CPA Prior Authorizations: Town Meeting Description Authorized Expended Encumbered Remaining Returned 2014/8k park Improvements - Hard Court $ 85,000 $ 85,000 $ — $ — $ — Resurfacing 2015/81 Pak rovements - Hard Court $ 55,000 $ 54,999 $ — $ — $ 1 doping 2016/8k Park Improvements - Hard Court $ 61,000 $ 59,959 $ — $ — $ 1,041 Resurfacing 2019/14h Park I pro ements - Hard Court $ '70,000 $ 63,985 $ 1,739 $ 4,276 $ — 2020/1 Oh Park Improvements - Hard Court Resurfacmg $ 100,000 $ 9,135 $ 32,077 $ 58,789 $ — Totals $ 371,000 $ 273,078 $ 33,816 $ 63,065 $ 1,042 *Data current as of August 31, 2021. Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Design/Engineer $ 100,000 Construction $ 1,755,000 Equipment $ 450,000 Contingency $ 195,000 Totals $ 2,500,000 $ — $ -- $ — $ — CPA Amount $ 2,500,000 $ — $ — $ — $ — Recreation - Page 1.94 Printed Septernber 15, 2021 If 140 lk' �dT Town of Lexington - FY2023-27 CPA Project Project Name: Park Improvements - Site Amenities Date: 9/14/21 Project ID: Rec-CPA-4 Department: Recreation & Community Programs Revised: Submitted by: Peter Coleman Phone: (781) 698-4803 Email: pcoleman@lexingtom-na.gov Description of Capital Program: The Recreation Committee requests $30,000 in FY2024 to update and replace site amenities at various parks and recreational facilities. Site amenities can include, but are not limited to, signage, shade structures, park and player benches, fencing, gates, and backstops, bike racks, trash and recycle receptacles, and water fountains. Justification/Benefit: While the 2020 Community Needs Assessment highlighted several strengths that currently exist within the Town's park system, one area for improvement is in regards to the amenities present at each site. Twenty-seven (27) individual park/site assessments were completed during the Community Needs Assessments and approximately 80% of the assessments completed (21 out of 27) identified site amenities as a deficiency with the lack and/or poor condition of signage, spectator seating, pedestrian lighting, and trash/recycle receptacles as the most commonly listed deficiencies. Recent capital improvement projects have included the installation of new amenities, whereas the amenities at other parks have aged and are in poor condition or are non-existent altogether. Establishing consistent signage throughout the Town's parks will enhance the overall appearance as well as the user's experience while at these facilities. This request will help to address the shortcomings that were identified in the Community Needs Assessment. Impact if Not Completed: The Public Works Department oversees the maintenance of the Town's parks, playgrounds, and athletic facilities. The impact of not approving this request is a continuing deterioration of the amenities that are currently in place, which could ultimately lead to their removal. This would be to the detriment of all park users, whether it be residents, non-residents, the Lexington Public Schools, youth and adult sports organizations, and Recreation and Community Programs Department -sponsored programs and activities. Timeframe: FY2024 and FY2026 Replacement Frequency: 10-1.5 years, depending on the amenity Planned Spending for Next 5 Years: FY2026 - $30,000 for upgrades and enhancements to site amenities at the various parks Basis for Cost Projections: Based on the actual cost for these items when purchased during previous capital improvement projects Stakeholders: Residents, Non -Residents, Lexington Public Schools, Youth and Adult League programs, Recreation & Community Programs, Recreation Committee Operating Budget Impact: If this request is not approved, then these items would need to be purchased out of the Department's operating budget. Funding Source: CPA Recreation - Page 195 Printed September 15, 2021 Prior Authorizations: None Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer Project Management Construction $ 5,000 $ 5,000 Equipment $ 25,000 $ 25,000 Contingency Totals $ — $ 30,000 $ $ 30,000 $ CPA Amount $ — $ 30,000 $ $ 30,000 $ Recreation - Page 196 Printed September 15, 2021 Town of Lexington - FY2023-27 CPA Project Project Name: Cricket Field Construction Date: 8/11/16 Project ID: Rec-CPA-5 Department: Recreation & Community Programs Revised: 9/14/21 Submitted by: Peter Coleman/Chris Filadoro, Phone: 781-698-4803 Email: pcoleman@lexingtonma.gov Description of Project: The Recreation Committee is requesting $200,000 in FY2026 to build a cricket field. This project would include the construction of a new cricket field. The site for the cricket field is unknown at this time and will depend on whether the project involves the conversion of an existing athletic field to a cricket field or if it will be the creation and construction of a brand new cricket field. This request was introduced in the plan four years ago and as of September 2021, a location has not yet been identified. In the meantime, staff continue to work with the various cricket advocates in an attempt to come up with a field that is appropriately sized for practices and matches for the short-term. Justification/Benefit: Played throughout the world, the sport of cricket is gaining in popularity in the United States. Locally, the United Cricket League (UCL) was created in 2013 and offers cricket opportunities to the youth of Lexington. The dimensions and specifications required for a cricket field are unique. The required dimensions for the batting area, referred to as the "pitch," are 66 feet in length by 10 feet in width and this area needs to be a hard, firm surface, such as compacted clay. Another unique feature is that the ball can be hit in any direction. As a result, the entire field should have a radius of 180 feet, which makes for an extensive playing area. Currently, cricket is played on natural grass multi-purpose athletic fields in Lexington, which are the most heavily used athletic fields in town. Constructing a field specific for cricket use would not only promote the game of cricket, but it would also help to reduce the amount of maintenance needed on the existing multi-purpose athletic fields. The Recreation Committee is charged with pursuing new, up-and-coming recreational activities for the residents of Lexington and the construction of a cricket field would enable cricket organizations to expand their programs and offerings within the community. Impact if Not Completed: The impact of not approving this request is that cricket would continue to be played on the multi-purpose athletic fields, which are the most heavily used athletic fields in town. This means that the cricket opportunities available to the community would be limited. Additionally, the overuse of the multi-purpose athletic fields would result in the continued deterioration of these fields, which could cause injuries and game cancellations. Timeframe: 2026 Replacement Frequency: 15 years Basis for Cost Projections: The cost estimate is based on similar past projects and information from vendors and architects. This cost estimate is in then -year dollars (FY2026 request in FY2026 dollars). Stakeholders: Residents, Non -Residents, United Cricket League, Adult Cricket Organizations, Recreation & Community Programs, Recreation Cornmittec, DPW Recreation - Page 197 PrintedSeptember .15, 2021 Operating Budget Impact: The impact that this project will have on the operating budget is unknown at this time since the location of the field is still to be determined. However, by designating a field specifically for cricket use, DPW staff hours, equipment, and materials should decrease as a result of this project. Funding Source: CPA Prior Authorizations: None. Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer $ 20,000 Project Management Construction $ 164,000 Equipment Contingency 16,000 Totals $ $ $ 200,000 $ CPA Amount $ $ $ 200,000 $ Recreation - Page 198 Printed September 15, 2021 Town of Lexington - FY2023-27 CPA Project Project Name: Community Park Master Plan - Lincoln Park Date: 9/14/21 Project ID: Rec-CPA-6 Department: Recreation & Community Programs Revised: Submitted by: Melissa Battite Phone: (781) 698-4801 Email: v Description of Project: The Recreation Committee requests $ 100,000 in FY2023 to complete a master plan of Lincoln Park. The results of the master plan will provide a strategic road map for implementing improvements, enhancements, and upgrades at Lincoln Park in upcoming years. Justification/Benefit: Lincoln Park was identified in the 2020 Community Needs Assessment as being one of two Community Parks in Lexington (the Center Recreation Complex is the other Community Park). With numerous active and passive recreation opportunities available, Lincoln Park is a crown jewel of the Town's recreation infrastructure. The park features three synthetic turf multi-purpose fields (one lighted), one Little League field, one softball field, an ages 2-12 playground, the Teresa and Roberta Lee Fitness/Nature Path, the Granite Forest, a picnic area with two shade structures, and public restrooms, among other amenities and attractions. The FY2023-FY2027 5 -Year Capital Plan reflects the possibility of six (6) capital improvement projects occurring simultaneously and/or in back-to-back years during this timeframe. This all-inclusive master plan will incorporate the findings in the 2020 Community Needs Assessment and bring together the goals of the many uses of the park through the Lincoln Park -Sub Committee, Recreation Committee, Conservation Commission, and community stakeholders. The end result will be a coordinated, holistic approach when implementing future capital improvement projects at Lincoln Park. Impact if Not Completed: If the master plan is not completed, then the upcoming capital improvement projects may not capture all of the upgrades and enhancements desired by the community. Timeframe: FY2023 Replacement Frequency: 15 years Basis for Cost Projections: Based on cost estimates for similar feasibility studies and master plans. Stakeholders: Residents, Non -Residents, Recreation & Community Programs, Recreation Committee, Lincoln Park Sub -Committee, Conservation Commission, DPW, Lexington Public Schools, Youth and Adult League programs Operating Budget Impact: If this request is not approved, then the master plan would need to be funded through the Department's Enterprise Fund. Funding Source: CPA Prior Authorizations: None. Recreation - Page 199 Printed September 15, 2021 Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer $ 90,000 Project Management Construction Equipment Contingency 10,000 Totals $ 100,000 $ $ CPA Amount $ 100,000 $ $ Recreation - Page 200 Printed September 15, 2021 Town of Lexington - FY2023-2 7 CPA Project Project Name: Lincoln Park Fitness Stations Equipment Date: 9/14/21 Project ID: Rec-CPA-7 Department: Recreation & Community Programs Revised: Submitted by: Peter Coleman Phone: (781) 698-4803 Email: gov Description of Project: The Recreation Committee requests $50,000 in FY2027 to upgrade and replace the equipment at the fitness stations at Lincoln Park. Justification/Benefit: When Lincoln Park was completely renovated back in 2003, fifteen (15) fitness stations were installed along the Teresa and Roberta Lee Fitness/Nature Path. The nature path is one of the gems of the park as evidenced by the fact that the equipment has been frequently used by park goers over the years. Due to its deteriorating condition, the time has come for the equipment to be replaced so that fitness enthusiasts can continue to enjoy the benefits that this equipment provides for years to come. Impact if Not Completed: If this request is not completed, the equipment will continue to deteriorate and at some of the fitness stations and removal of the equipment will be needed. Timeframe: 2027 Replacement Frequency: 20 years Basis for Cost Projections: Based on cost estimates for similar purchases of fitness equipment. Stakeholders: Residents and Non -Residents, Recreation & Community Programs, Recreation Committee, Lincoln Park Sub -Committee Operating Budget Impact: If this request is not approved, then these items would need to be purchased out of the Department's operating budget. Funding Source: CPA Prior Authorizations: None Recreation - Page 201 Printed September 15, 2021 Funding Request: FY2023 FY2024 FY2025 FY2026 FY2027 Site Acquisition Design/Engineer Management Construction $ 5,000 Equipment $ 40,000 Contingency $ 5,000 Totals $ $ $ $ $ 50,000 CPA Amount $ $ $ $ $ 50,000 Recreation - Page 202 Printed September 15, 2021