Loading...
HomeMy WebLinkAbout2015-09-09-REC-min.attach2Town of Lexington Recreation & Community Programs 5 -Year Capital Plan FY2017- FY2021 Submitted by: Karen Simmons Director of Recreation & Community Programs September 8, 2015 - A Town of Lexington Department: Recreation , A '4. FY 2017-2021 Department Summary of Capital Improvement Projects 41 Priority Project Name FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Total 278 8 Athletic Facility Lighting $0 $350,000 $505,000 $0 $0 $855,000 280 3 Pine Meadows Improvements $65,000 $0 $0 $80,000 $0 $145,000 282 4 Park and Playground Improvements $75,000 $60,000 $0 $70,000 $70,000 $275,000 283 1 Town Pool Renovation $1,500,000 $0 $0 $0 $0 $1,500,000 518 5 Park Improvements - Athletic Fields $120,000 $125,000 $150,000 $400,000 $75,000 $870,000 519 7 Pine Meadows Equipment $0 $55,000 $55,000 $50,000 $60,000 $220,000 532 6 Park Improvements- Hard Court Resurfacing $61,000 $0 $58,000 $43,000 $65,000 $227,000 732 9 Center Track and Field Reconstruction $0 $0 $3,000,000 $0 $0 $3,000,000 893 10 Recreation Site Assessment of Potential Land Acq $0 $0 $0 $0 $0 $0 976 2 Granite Forest at Lincoln Park $30,000 $0 $0 $0 $0 $30,000 Department Totals $1,851,000 $590,000 $3,768,000 $643,000 $270,000 $7,122,000 Approval by: 1-0 CEd7Q c14-12- il?/ii 41: (Department Head Signature required) 9/8/2015 10:22:41 AM Page 1 of 1 Town of Lexington - FY 2017-FY 2021 Capital In provement Projects Project Name: Project ID Number: 283___ Submitted By: Karen Simmons Date: 30-Aug-05 Revision Date: 08-Sep-1*_ Department: Recreation Priority First Year Submission? El Phone #: E-mail Description of Project: The Recreation Committee is requesting $1,500,000 in FY2017 for Phase III of a multi-phased program of renovations to the Irving H. Mabee Pool Complex. The phased approach was identified in the Engineering Consultant's Study completed in FY2008 by Bargmann Hendrie and Archetype. Phase III of the project scheduled for FY2017 will include replacing the filtration systems which are beyond their life expectancy. The building will have to be enlarged in order to accommodate four new filtration systems. The Garnty, Main (|ap) and Diving Pools share a common filter system. The current Department of Health Codes do not allow multiple pools to share a filter. The Town is currently grandfathered until the filter is replaced. By having the pools on a common filter, if a situation occurs that warrants closing a pool, all three pools must be closed. The cos of the project has increased based on ari updated cost estimate. Replacement of the filtrations system is a large undertaking and this project would include the following work: , Expansion of the filter room (an addition to the building is required) . • Replacement of piping between existing surge tank and filter room ( Main and Dive Pools) , Replacement of piping between Garrity Pool and filter room, ▪ Removal and repla�ment of concrete decks to access piping. , Upgrade of electrical service to 600 Amps required for new filtration systems. In addition the result of the p001 facility audit recommended the foliowing: , Replacement of the existing roof. • Replastering of the Wading, Main, and Dive Pools. • Replacement of the three divirig boards. , Reconfiguration of the three one-meter diving board rails (which do not meet code) . • lnstallation of new lifeguard chairs. , Replacement of the fencing with new black vinyl-coated chain link fencing and gates. , Resetting of the copings for the Wading Pool. , lnstallation of a new shade structure. Justification/Benefit: The Irving H. Mabee Pool Complex is a heavily used recreation facility during the summer. Attendance at the Center Poo Complex averages 75,000 people each summer. While the facility continues to operate safely, the filtration system was last updated in 1980. The consultant's report provided the Town with a detailed list of recommended upgrades and repairs needed, thus allowing the Town to plan and budget the upgrades and repairs effectively and responsibly. With each year, the efficiency and effectiveness of the filtration systems and chlorinators decreases. Repairs become more costly as the filtration system breaks down more frequently. The improvements to the filtration system will bring the system into compliance. Funding was approved inun10 for Phase | and ou11 for Phase II. Phase 1 and Phase 11 are complete. Impact if not completed: If immediate needs are not identified and addressed, the p001 may need to be closed for an extended period of time during the peak season, thus affecting the residents and decreasing revenues. Timeframe: Replace. Freq: 2017-2018 30 Years Stakeholders: Residents, Non-residents, Recreation & Community Programs, DPW, Health Department, Lexington Public Schools Operating Budget Impact: Repairs to the flltration system and plumbing system has become an annual occurrence which impacts the operating budget. Cost Analysis: Funding Source: Levy • CPA Revolving State Aid Water Sewer Recreation Private Other emm015 10:2314xm Town of Lexington - FY 2017-FY 2021 Capital Improvement Projects Project Name: Town Pool Renovation Date: 30-Aug-05 Project ID Number: 283 Revision Date: 08-Sep-15 Submitted By: Karen Simmons Department: Recreation Priority 1 First Year Submission? Phone #: 781-862-0500 x8480 E-mail ksimmonsAlexincitonma.gov Capital Funding Request 283 2017 2018 2019 2020 Site Acquisition so Design/Engineer 1 - 590,000 r—TO r---FT—F Construction $1,290,000 $0 $0 $0 Equipment 1-- so 1 so so 1 so _ ,,,....._,„._..._. Contingency FT17,6071---1-6"--r so i so 2021 Totals $0 $0 $90,000 $0 $1,290,000 $0 $0 1$1,500,000 Totals Is1,506,0701. so r so r so CPA Amt Req. [F1 5 00 , 0 0 0 1 $0 $ 0 1 $0 1 $0 Recurring Cost $0.00 Maintenance Cycle 1 Years CPA Purpose -) Open Space i) Recreation .1-) Historic (7) Housing Basis of Cost Projection: The initial cost estimate is based on the Pool Facility Audit completed by Bargmann Hendrie + Archetype, Inc. in February 2008. It was updated in the spring of 2015. 9/8/2015 10:23:14 AM Town of Lexington - FY 2017 -FY 2021 Capital Improvement Projects I Project Name: Granite Forest at Lincoln Park Date: 26-Aug-1 5 Project ID Number: 976 Revision Date: 28- Aug -15 Submitted By: Karen Simmons Department: Recreation Priority First Year Submission? ;v= Phone #: 781-698-4801 E -mail ksimmons@lexingtonma,,gov 2 Description of Proiect: This request is for $30,000 from the CPA to install a monumental work of "Public Art' at Lincoln Park. This is a public/private partnership of which $30,000 is requested from the CPA and $45,000 will be raised privately by the Lincoln Park Sub - Committee. The design calls for the installation of a notable landscape feature 'The Granite Forest" . The Granite Forest is a greenway corridor connecting the lower park to the upper park. It will have granite benches and will be landscaped with trees and shrubs. It will be located in the meadow between the multipurpose athletic field and the woodland /meadow gardens of Lincoln Park. This is along a high traffic path connecting the high school campus to the upper section of Lincoln Park. The primary material for the design started with the opportunity to utilize 11 antique granite foundation stones from the Issac Mulliken House built around 1850 and located at 2013 Massachusetts Ave. This house was being moved and renovated as part of the Inn at Hastings Park project. The granite was donated by Mr. and Mrs. Michael Kennealy. These 11 pieces of hand carved granite range in size from 5 feet to 11 feet and are a priceless reminder of earlier methods of building. Ultimately, it is the intent to have text carved into the granite adding a layer of ecology, history and poetry art. This is modeled after Thoreau's Path at Bisters Hill in Concord. Justification/ Benefit: The Granite Forest is to serve as a landmark, providing a gathering space for individuals using the nature path, the playground and the athletic fields. This much used and loved area serves as a quiet, peaceful link between the two major recreation areas in Town; The Center Recreation Complex and Lincoln Park. It will exemplify the principal of adaptive reuse and creativity in the park environment and will provide a window on the ecological and social processes which shape the landscape. The spirit of reclamation is alive at Lincoln Park as it continues its transformation from a landfill to a thriving recreational and nature treasure. It is also the location of the Teresa and Roberta Lee Fitness /Nature Path, Dick Kirk Overlook and the Azalea Woods. Impact if not completed: The Town would lose this opportunity to connect the lower and upper park utilizing historical building material. Timeframe: Fall 2016 Stakeholders: Lexington residents Operating Budget Impact: This project was initiated and will be maintained by the Lincoln Park Sub - Committee, Replace. Freq: 0 Years Cost Analysis: Funding Source: Levy • CPA "" Revolving State Aid Water Sewer Recreation • Private Other Capital Funding Request 976 Site Acquisition Design /Engineer Construction Equipment Contingency Totals CPA Amt. Req. 2018 2019 2020 2021 Totals so 4 so so $30,000 80 $0 so . $o $0 r $30,000 $0 $o Recurring Cost $0.00 Maintenance Cycle 0 Years CPA Purpose () Open Space Recreation . i Historic Housing 9/8/2015 10:23:14 AM Town of Lexington - FY 2017-FY 2021 Capital Improvement Projects Project Name: Granite Forest at Lincoln Park Project ID Number: 976 Submitted By: Karen Simmons Date: 26-Aug-15 Revision Date: 28-Aug-15 Department: Recreation Priority First Year Submission? v Phone #: 78 ,-698-4801 E-mail ksimmonsplexingtonma,gov 2 Basis of Cost Projection: Based on cost estimate by the architect in 2014 and a quote from a contractor 9/8/2015 10:23:14 AM Town of L ~FY2017.FY2021 Capital Improvement Projects Project Name: Pine Meadows ImDrovements Project ID Number: 280 Submitted By: Karen Simmons Date: Revision Date' Department: Recreation Priority 3 First Year Submission? Phone #: E-mail ksimmonsAlexingtonma goy Description ofProject: In FY2017, the Recreation Committee requests $65,000 from the Recreation Enterpnse to reconstruct the 4th Green and to reconstruct the men's tee box on the 8th hole. The unfavorable contours on the fourth green have resulted in significant turf injury over the course of the last few winter seasons. Because of the contours in the green there is poor surface drainage as well as poor underlying drainage throughout the greens surface. The result has been signiflcant winter kill and a poor putting surface from the Ioss of turE grass. A Senior Agronomist for the USGA, and Pine Meadows golf course architect, have recommertded that the fourth green be reconstructed with proper drainage and constwction methods. The new green should eliminate the past problems of loss of turf and disruption of play to those golfers supporting Pine Meadows. A temporary green will be used while the new green is constructed so there will be little impact on the golfers. The reconstruction of a new middle tee on the 8th hole is another important capital project at Pine Meadows. The back tee is Iocated in an environmentally sensitive and denseiy wooded part of the golf course with IittIe sun and very well shaded for much of the growing season. In addition, the size of the tee is relatively small resulting in turf quality tha is just fair and is not able to handle the significant play throughout the golf season. A temporary area located in front of the existing back tee was cut down and is currently used as a middle tee periodically throughout the golf season for the second set of tee markers. We are planning to reconstruct this middle tee at a slightly higher elevation and greater size with quality soil and a level tee surface. The existing forward and back tee will be used while the new middle tee is under construction. The cost of this improvement is important to provide for three quality tee locations for all level of golfers on the eighth hole. FY2020- $80,000 ▪ Reconstruction of the cart path on the first hole by the green to the second tee, from the parking lot to the fifth tee and extending the cart path on the sixth hole and repair the grading for improved drainage in the rough. , Install drainage on the Ieft side of the eighth hole and by the first green. , Reconstruction of fairway bunker on the second hole (2) and the seventh hole. Justification/Benefit Pine Meadows is a valuable open space and recreational resource area for the Town of Lexington. It is used year round by residents to play golf, cross-country ski, sled and walk. Improvements are necessary to provide quality playing conditions. This will ensure an enjoyable golfing experience resulting in more play and revenue for the Town. Impact if not completed: If the project is not undertaken we will continue to have majo problems with this green both in the spring and during the season under certain weather conditions. Significant costs have been incurred in the pas in attempting to minimize the issue and correc the problems with seeding, aenfication, topdressing, sodding and installing drainage. The Town has sustained a loss of revenue in the past from the temporary closing of the green by offering reduced greens fees or reduced play from golfers not happy with a poor putting surface. Timeframe: Develop specifications afte Town Meeting approva and perform renovations beginning November of 2016 Replace. Freq: 20 Years Stakeholders: Residents, Non-residents, DPW, Recreation & Community Programs, Lexington Public Schools, Lexington High GoIf Team, Minuteman High School and the Conservation Commission Onerating Budget Impact: A reduction in revenue if the fairways are not playable. Cost Analysis: Funding Source: Levy CPA Revolving State Aid Water Sewer • Recreation Private �� Other Capital Funding Request Recurring Cost 9/8/2015 10:23:14 AM Town of Lexington - FY 2017 -FY 2021 Capital Improvement Projects Project Name: Pine Meadows Improvements Project ID Number: 280 By: Karen Simmons Date: Revision Date: Department: Recreation Priority First Year Submission? Phone #: 781 862 -0500 x8480 E -mail ksimmonslexingtonma.gov„ 30- Aug -05 29- Aug -15 3 280 Site Acquisition Design /Engineer Construction Equipment Contingency Totals CPA Amt. Req. 2017 2018 2019 2020 2021 Totals $0 $0 „m..m $0 $10,000 $1'25,00r- $5,000 $85,000 i so Basis of Cost Projection: The cost is based on an estimate provided by a golf course architect. $80,000 $0 $10,000 $145,000 $0.00 Maintenance Cycle 1 Years CPA Purpose 3 Open Space n Recreation Historic 0 Housing 9/8/2015 10:23:14 AM Town of Lexington - FY 2017 -FY 2021 Capital Improvement Projects Project Name: Park and Playground Improvements Date: 30- Aug -05 Project ID Number: 282 Submitted By: Chris Filadoro Department: Recreation Revision Date: 03- Sep -15 Priority 4 First Year Submission? Phone #: „781- 274 -8355 „ E -mail cfilada of?lexingtonma.00v Description of Proiect: The Recreation Committee requests $75,000 in FY2017 to replace the safety fencing at the Center Recreation Complex along Worthen Road and at the Muzzey Multipurpose Field along Massachusetts Ave. The impro ° ^ s will include removing, disposing and installing approximately 1,2001/f of new chain link fence between both locations. Approximat 600 t 4' height and approximately 400 I/f at 8' height. The 8' height is requested next to the baseball and softball field to minimize balls from ' "i' "Ing vehicles along Worthen Road. FY2018 - $60,000 to replace and update the swing sets and install bike racks at Bow Street Park, Franklin Park and Munroe Park. Install safety surface. FY2020- $70,000 to update and replace the playground equipment at Sutherland Park and install a bike rack. Install safety surface. FY2021- $70,000 to update and replace the playground equipment at Rindge Park and install a bike rack. Install safety surface. The proposed playground improvements will renovate and rehabilitate existing safety surfacing and equipment so that all sites will be in compliance with the Consumer Product Safety Commission (CPSC) , American Society for Testing and Materials (ASTM) and the American with Disabilities Act (ADA) . Justification /Benefit: The existing fence is over 40 years old and is in disrepair. For safety it is recommended to replace the fence at the Center Recreation Complex and at Muzzey Field. Impact if not completed: Over the years, frost heaves has caused the fence posts to come out of the ground and the fence is falling over requiring replacement. The current playground equipment, use zones, and surfacing do not comply with CPSC, ASTM or ADA standards. As the equipment continues to age and deteriorate, more frequent inspections, repairs and equipment removal will be needed to ensure that the users are safe. This is neither cost effective nor efficient. Timeframe: Fall 2016 Stakeholders: Residents Operating Budget Impact: no impact to the operating budget Replace. Freq: 30 Years Cost Analysis: Funding Source: Levy CPA Revolving State Aid Water Sewer Recreation Private Other Capital Funding Request 282 Site Acquisition Design /Engineer $0 $0 Construction I $72,000 1 $15,000 Equipment $0 Contingency $3,000 $3,000 Totals CPA Amt. Req. 2017 2018 2019 $0 2020 so 2021 $o $20,000 Totals $0 $127,000 I $75,000 1 $60,000 m. $0 $5,000 $o r $70,000 $70,000 $16,000 $275,000 Recurring Cost $0.00 Maintenance Cycle 1 Years CPA Purpose 0 Open Space f; Recreation ''i Historic .mm 1 Housing 9/8/2015 10:23:14 AM Town of Lexington - FY 2017-FY 2021 Capital Improvement Projects Project Name: Park and Playground Im rovements Date: 30-Aug-05 Project ID Number: 282 Revision Date: 03-Sep-15 Submitted By: Chris Filadoro Department: Recreation Priority 4 First Year Submission? Phone #: 781-274-8355 E-mail cfiladorogi)lexincitonma.cov Basis of Cost Projection: The cost projections are based on similar renovation projects. 9/8/2015 10:23:14 AM Town of Lexington - FY 2017 -FY 2021 Capital Improvement Projects Project Name: Park Im rovements - Athletic Fields Date: 15- Sep -06 Project ID Number: 518 Revision Date: 28- Aug -15 Submitted By: Chris Filadoro Department: Recreation Priority 5 First Year Submission? Phone #: 781- 274 -8355 E -mall cfiladoroMexinctonma Qov� Description of Proiect: The Recreation Committee requests $120,000 in FY2017 to renovate the Adams Park Multipurpose athletic field located behind the Waldorf School. The renovation to the multipurpose field will include laser grading the athletic field, grading for proper drainage, and adding permanent park benches. The Town of Lexington athletic fields see excessive use and timely renovations and replacement are critical to provide safe and playable fields for all user groups. The athletic field is used by the Waldorf School during the day and by youth organizations evenings and weekends. Proposed future renovations will include turf, drainage, and irrigation ( where applicable, and site amenities ( benches, backstops, etc.) : FY2018 - $125,000 - Harrington Baseball and Softball Fields FY2019 - $150,000 - New in- ground irrigation systems at the Hastings, Bowman and Franklin. FY2020 - $400,000 - Diamond School Field renovation will include drainage, laser grading, and new irrigation controls. FY2021 - $75,000 - Computerized Irrigation Controls for all in- ground Town systems. Justification /Benefit: Safety for all participants is the major concern and improving upon the safety of the fields is the major benefit to all users. The Town of Lexington athletic fields are constantly used by recreation, school, youth, and adult groups. They are in need of major repairs that cannot be completed within the operating budget. There are safety issues with faulty backstops, uneven turf, uneven infield areas, and drainage. This is an ongoing multi -year capital program to address saftey and playability concerns and to provide adequate and safe field conditions for neighborhood families, recreation, and school programs. The benefit would be to renovate the fields to a condition where they will be safe, playable, and more easily maintained. Impact if not completed: The Public Works Department oversees the maintenance of the school and Town athletic facilities. The impact of not approving this request is a continuing deterioration of the fields which may lead to injuries and cancellation of games. This will impact the School teams, youth leagues, adult leagues, and Recreation programs and affect the quality of life in Lexington. Timeframe: Develop specifications after Town Meeting approval and perform renovations beginning fall of 2016. Replace. Freq: 10 Years Stakeholders: Residents, non - residents, Lexington Public Schools and Waldorf School, Youth League programs, DPW, Recreation & Community Programs Department Operating Budget Impact: DPW staff hours, equipment and materials costs should decrease with improved field conditions that will require routine maintenance and not emergency repairs. Cost Analysis: Funding Source: Levy , CPA Revolving State Aid Water Sewer Recreation Private Other Capital Funding Request 518 Site Acquisition Design /Engineer Construction Equipment 2017 $0 2018 2019 $0" $o $145,000 $0 $0 $5,000 $0 $15,000 $10,000 $100,000 $1 $0 10,000 Contingency I $5,000 1 $5,000 Totals CPA Amt. Req. $120,000 $125,000 1$150,000 2020 $0 $20,000 $365,000 $0 $15,000 $400,000 $7$,000 I $870,000 L 5120,000. $125,000 $150,000 I $400,000 $75,000 1 2021 $0 Totals $o 50 $45,000 $0 $720,000 $75,000 $75,000 $30,000 $0 Recurring Cost $0.00 Maintenance Cycle 1 Years CPA Purpose ) Open Space ation ) Historic Housing 9/8/2015 10:23:14 AM Town of Lexington - FY 2017-FY 2021 Capital hnprovement Dnro Project Name: Date: 13-Amg-07 Project ID Number: 532 Revision Date: Submitted By: Chris Filadoro/Karen Simmons Department: Recreation Priority First Year Submission? Phone #: -__ E-mail cfiladoroftlexingtonma.goi ___- 6 Description of Proiect: The Recreation Committee requests funds to institute and carry out a hard court resurfacing program. The program includes resurfacing, painting and striping the hard court surfaces at Recreation facilities. These facilities include neighborhood Basketball Courts, Center Track and Tennis Courts at the Center Complex, Clarke Middle School and ValIey. The FY2017 request is for $61,000 to rehabilitate the basketball courts at Rindge Park and Kinneens Park. The projectwill include reconstruction of the courts and installation of new backboards/poles. The current surfaces have extensive cracks and frost heaves which will require a reconstruction. It will also include funding to purchase and permanently install a bike rack at each site. Future projects: FY201e $58.000 Adams Park - resurface, paint, and restripe the Adams Tennis Courts and the Adams Basketball Court and installation of a bike rack. FY2020 $43.000 - ValIey Tennis Courts resurface, paint, and restripe the tennis courts and installation of a bike rack. FYuuu1'$so.ouo- Center Basketball Courts resurface, paint, and restripe the basketball courts and installation of a bike rack Justification/Benefit: Over the pas 18 years, the Town has supporte and invested in an upgrading of the town's recreation infrastructure. The hard court resurfacing program is a program for hard surface athletic facilities which include basketball, tennis, track and the skatepark. The program will include resurfacing and painting the hard court surfaces and installing new posts, backboards, nets and rims at Recreation facilities. It is important to maintain these valuable assets in the community to ensure their usability and the safety of the users. It is important to maintain the Towns recreation infrastructure. Impact if not completed: The impac of not approving the reques is a deterioration of the athletic facilities and unsafe conditions for the residents in the community Timeframe: Fall 2016 Stakeholders: neighborhood families and residents Operating Budget Impact: Failure to maintain the infrastructure will result in higher repair costs and/or complete reconstruction. Replace. Freq: 15 Years Cost Analysis: Funding Source: [] Levy • CPA Revolving State Aid Water Sewer Recreation - Private � Other Capital Funding Request 532 Site Acquisition Design/Engineer Construction Equipment Contingency Totals CPA Amt. Req. [ / 2017 2018 2019 2020 2021 Totals $0 $0 so '| — - . -- | 1 l Y '' ' ? ' / �u7�0O | 80 | $*5�OO | $30,000 | �5U�O0 U $1r3�OV |��$2 f �' -7 '-- -| \ �»» | �n / �2�OO / *2,0OO I $2,000 $5,000 1 -' ' )- — -. , ---' ---- — $81,000 N 1 *��OVV ^ T $65, •we Recurring Cost $0.00 -___-___ Maintenance Cycle 5 Years CPA Purpose 9/8/2015 10:23:14 AM 74,4, Town of Lexington - FY 2017-FY 2021 Capital Improvement Projects 13-Aug-07 Project Name: Park Improvements- Hard Court Resurfacing Date: 0-7(0-- Project ID Number: 532 Revision Date: 03-Sep-15 Submitted By: Chris FiladoroiKaren Simmons Department: Recreation Priority 6 First Year Submission? Phone #: 781-274-8355 E-mail cfiladoroMexingtonma. Joy Basis of Cost Projection: The cost estimates are based on similar past projects. 9/8/2015 10:23:14 AM ��]� -p�/���7_��'���� � �~_.'~~�~~~�~.�.~.~ ~�^-~�. ��~~.'�~.=�°"=° Improvement Projects Project Name: Llipmagu__________________-_____________ Date: 11-Amg'08 Project ID Number: 519 Date: Revision 2n����__ Submitted By: Karen Simmons Department: Recreation Priority 7 First Year Submission? Phone #: 781f862-0500 x8480 E-mail ksbmooum(8,1exiontoomo.gm/_____-_ Description of Proiect: The FY2018 reques is for $55,000 from the Recreation Enterprise Fund to purchase a Toro Triplex mowe for the greens replacing a 2002 Greensking mowe and an Excel Hustier Trim mower replacing a Ferris mower. The Iife expectancy of golf course mowers average 7 years. FY2019 - $55,000 to purchase a Toro Triplex mower for the tees and apron replacing a 2005 Greensking mower: a Turfco Top Dresser machine replacing oTurfcommennaon Top Dresser and ooa|oo Greens Roller. FY2020 - $50,000 to purchase a Massey Fergusen Tractor replacing a 1995 Massey Tractor. Fv2021 $60,000 to purchase a Jacobson fairway mower replacing the 2012 Jacobson fairway mower. �ustification/Denwfit: The past and future success at Pine Meadows can be attributed to the ongoing investment in golf course infrastructure and equipment to maintain the eighty eight acres of property. Sufficient equipment is needed to properly set up the golf course on a daily basis and also to provide superior piaying conditions on a consistent basis throughout the year. The existing 2002 Greensking mower is at the end of its usefui life. The mower is used on a daiiy basis in maintaining the greens throughout the goif course. Technological improvements have been made over the years to both the operating efficiency and quality of cut to the mower. Each day piay begins at 6 am and piay continues into the eariy evening during the summer season. The goif course is staffed so that the greens, tees arid fairways can be cut with minimai disruption of play whiie providing outstanding playing conditions. The quality of cut and height of cut from mowers ensures that golfers will be able to quickly locate their ball and be able to hit a satisfactory shot from the rough resulting in an improved pace of play. An improved pace of piay and superior piaying conditions ensures an enjoyable golfing experience resulting in more play and revenue to the Town. The overall aesthetic quality of a golf course is very important to its ultimate financial success. The good maintenance ofogolf course requires equipment that operates efficiently, effectively, and safely. The quality of the turf and grooming of the course is critical to the overall operation. Impact if not completed: If the turf is not maintained properly, it will affect the quality of play and the Town will lose customers, thus reducing revenue. In addition to the financial loss, employee safety issues arise if machinery is operated beyond its reasonable life span. Timeframe: Replace. Freq: August 2017 7 Years Stakeholders: Residents, Non-resident golfers, Recreation & Community Programs, Lexington Public Schools Golf Team, Minuteman Tech High School Golf Team Operating Budget Impact: Reduce repair costs Cost Analysis: Funding Source: Levy CPA Revolving _ State Aid Water Sewer • Recreation '- Private Other Capital Funding Request Recurring Cost 9/8/2015 10:23:14 AM l'own of Lexington - FY 2017 -FY 2021 Capital Improvement Projects Project Name: Pane Meadows Equipment ] Pro ect ID Number: 519 By: Karen Simmons Date: 11- Aug -08 Revision Date: 29- Aug -15 Department: Recreation Priority First Year Submission? #: e..7 8 1 -862 .05 00 x8...4 80 E -mail _ k i m mo s lexingtonma.gov .... 7 519 Site Acquisition Design /Engineer Construction Equipment Contingency Totals CPA Amt. Req. 2017 I so r $0 2018 2019 2020 $o $o $0 $o $55,000 $50,000 $ 2021 Totals $0 ra—ir $0 $0 $60,000 $220,000 s0 .... $o —59-1- 0 r $55,000 555,000 $50,000 $60,000 f $220,000 Basis of Cost Projection: August 2015 cost estimate $0.00 Maintenance Cycle 1 Years CPA Purpose Open Space (1.1) Recreation .'' Historic Housing 9/8/2015 10:23:14 AM 1 own of Lexington - 1-Y 2017 -FY 2021 Capital Improvement Projects Project Name: Athletic Facility Lighting Project ID Number: 278 Submitted By: Karen Simmons /Chris Filadoro Date: 25- Aug -05 Revision Date: 31- Aug -15 Department: Recreation Priority First Year Submission? Phone #: 781-862-0500 x8480 E -mail ksimmons(arlexingtonma_gov Description of Proiect: The Recreation Committee requests $350,000 in FY2018 for Phase I of an Athletic Facility Lighting upgrade to replace the existing lighting system and structures at the Gallagher Tennis Courts and the Center Complex Basketball Courts with more cost efficient fixtures and illuminants. Phase II of the project scheduled for FY2019 requests $505,000 to replace the existing lighting system at the High School Varsity Baseball and Varsity Softball field. Justification /Benefit: The current lighting system is constantly being repaired and does not operate efficiently. Tennis court lighting was last upgraded in 1986. The basketball court lighting was also improved in 1986. With the exception of bulb and fixture replacement and repair, there have been no significant improvements to the lighting systems in these areas. The Center # 2 Softball Lights were installed in 1986 and the Center # 1 Baseball lights were installed in 1997. The installation of newer energy and cost efficient systems will provide financial savings to the Town and allow for a safer environment in which to participate in night activities. Recreation is a value added service to the community. Impact if not completed: The repair budget for the existing lighting systems will continue to increase. As energy costs continue to rise, the cost to operate the lights increases yearly. Outdated, inefficient lighting at heavily used areas such as the Center Recreation Complex have a negative impact upon the department budget. Newer lighting will enhance playing conditions for participants, provide the users of the area with a safer facility in which to recreate, be less obtrusive for the neighborhood and environment, and be more energy efficient and trouble free for the Town. Timeframe: Phase I- 2018; Phase II - 2019 Stakeholders: Lexington Public Schools, Residents Replace. Freq: 25 Years Operating Budget Impact: The specifications will include a 25 -year warranty and maintenance program. This will eliminate maintenance costs for 25 years including labor and materials. New energy efficient fixtures and bulbs will result in a operating cost savings. Cost Analysis: Funding Source: Levy • CPA Revolving State Aid Water Sewer Recreation Private Other Capital Funding Request 278 Site Acquisition Design /Engineer Construction Equipment Contingency Totals CPA Amt. Req. 2017 2018 $0 I 2019 $oj._ $0I $0 2020 2021 Totals so ( $o $o r� $0 I $150,000 $220,000 $0 $0 $370,000 $0 $1907000 i $275,000 $0 $0 $465,000 $6 ..$10 000 $0 ! 5350,000 5505,000 $0 $0 $855,000 $0 I $350,000 f $505,000 I Basis of Cost Projection: The cost is based on a 2014 estimate from Musco Sports Lighting, LLC.. $o I $o Recurring Cost $0.00 Maintenance Cycle 25 Years CPA Purpose .....,) Open Space (*) .iteCreation Hi 'c O. Housing 9/8/2015 10:23:13 AM 1 own of Lexington - 1- Y 2017 -1-Y 2U21 Capital Improve n .ent Projects Project Name: Center Track and Field Reconstruction Project ID Number: 732 Submitted By: Chris Filadoro /Karen Simmons Department: Recreation Date: 15- Aug -11 03- Sep -15 Revision Date: Priority First Year Submission? Phone #: 781-2/4-8355 ,,. E -mail cfiladorp(atlexingtopma.gov,,, Descriation of Proiect: The Center track area is one of the most heavily used facilities in town and is open and available 365 days per year depending on the weather. The track and the associated athletic field area are used by the school, youth and adult groups, Recreation and residents. The area is used for walking, running, track and field events, soccer, Special Olympics and Physical Education Basses. The track surface was recoated in the fall of 2012 and that was the last recoating that the track can undergo. It was estimated to add 5 to 6 years of life to the existing surface. This request is to totally reconstruct the track surface, do a complete renovation of the athletic field with the installation of synthetic turf, installation of lights and replacement of the existing bleachers. The FY2019 request for this project is $3,000,000. This project is being moved from FY2018 to FY2019 due to the unknown location of a potential new high school. Justification /Benefit: The track surface continues to wear out at a high rate creating unsafe conditions which affect a large number of users. The reconstruction will allow for continued high use for a wide range of users and provide a safer and more comfortable surface. The reconstruction of the athletic field will allow for extended use similar to Lincoln Park. Impact if not completed: The track surface will continue to deteriorate causing safety concerns and possible closures for more costly short-term repairs. The athletic field will be at capacity and the hours of use will be limited by indement weather and worn areas causing down time for programs that are already at their limit. Timeframe: 2019 Stakeholders: Lexington Public Schools, Recreation & Community Programs, youth and adult sports programs, residents. Operating Budget Impact: It is estimated that the expense to operate the lights is approximately $6,000 per year. This will be offset by revenue. Replace. Freq: 25 Years Cost Analysis: Funding Source: • Levy • CPA Revolving State Aid Water Sewer Recreation Private Other Capital Funding Request 732 Site Acquisition Design /Engineer Construction Equipment Contingency Totals CPA Amt. Req. 2017 2018 2019 2020 2021 $0 $300,000 I $o I $0 $0 $2,000,000 $400,000 so 1 Totals so $30Q000 $0 $2,0 00,00 °0 ,00.:,.,,.,,.., 0 $0 $0 $400,000 $0 1 $0 1 $300,000 $0 $3,000,000 $0W 10 $3,000,000 $0 1 $2,400,0001 Recurring Cost $5,000.00 Maintenance Cycle 0 Years CPA Purpose Open Space • Recreation ( .1) Historic ( Housing Basis of Cost Projection: Cost projections provided by Stantec based on similar projects. The synthetic turf is estimated to cost $600,000. The subsurface drainage and track construction is estimated at $2,400,000. 9/8/2015 10:23:14 AM Town of Lexington - FY 2017 -FY 2021 Capital Irnprovement Projects Project Name: Recreation Site Assessment of Potential Land Acquisition Date: 30- Sep -13 Project ID Number: 893 Revision Date: 03- Sep -14 Submitted By: Karen Simmons Department: Recreation Priority 10 First Year Submission? Phone #: 781 -862 -0500 x8480 E -mail ksimmons ?„lexingtonma.cov Description of Project: In the event that a parcel of land is identified for acquisition that may accommodate recreation programming, it is proposed that money be appropriated for site work including an environmental assessment, engineering and design services. This is a placeholder. Justification /Benefit: Additional athletic fields will benefit the community by providing more space for organizations to utilize. Impact if not completed: The Town will lose an opportunity to fufill athletic field and open space needs. Timeframe: Stakeholders: Lexington Public Schools, Recreation & Community Programs, youth and adult sports programs, residents. Operating Budget Impact: Funding unknown at this time Replace. Freq: 0 Years Cost Analysis: Funding Source: Levy • CPA Revolving State Aid Water Sewer Recreation Private Other Capital Funding Request 893 Site Acquisition 2017 2018 2019 2020 2021 $o.,...._ .$o so so r. a.. -.s o. I $o -I $0 1 so $o 1-161--761-1-6- 0 $0 $o so so so Design /Engineer r Construction Equipment Contingency Totals CPA Amt. Req. Basis of Cost Projection: $ Totals $0 $0 $0 $0 $0 Recurring Cost $0.00 Maintenance Cycle 0 Years CPA Purpose ,.. Open Space Recreation Historic 0 Housing 9/8/2015 10:23:14 AM