HomeMy WebLinkAbout2015-05-18-BOS-Packet-releasedSELECTMEN'S MEETING Monday, May 18, 2015 7:00 PM AGENDA PUBLIC COMMENTS Public comments are allowed for up to 10 minutes at the beginning of each meeting. Each speaker is limited to 3 minutes for comment. Members of the Board will neither comment nor respond, other than to ask questions of clarification. Speakers are encouraged to notify the Selectmen's Office at 781-698-4580 if they wish to speak during public comment to assist the Chairman in managing meeting times. SELECTMAN CONCERNS AND LIAISON REPORTS TOWN MANAGER REPORT ITEMS FOR INDIVIDUAL CONSIDERATION 1. Accept Donation from Rotary for Community Center (5 min.) 7:00 PM 2. Discussion of School District Building Projects Plan (10 min.) 7:05 PM 3. Presentation on Westminster Avenue/Lowell Street Intersection 7:15 PM 4. Youth Services Programming (30 min.) 7:25 PM a. Human Services Recommendations Regarding Youth at Risk b. School Committee Request for Coalition for Lexington's Youth 5. Center Streetscape Project - Meriam Street to Police Station (30 min.) 7:55 PM 6. Conflict of Interest Obligations for Committee Members - Mass. Avenue Intersection Project (5 min.) 8:25 PM 7. Approve Letter to MassDOT - East Mass. Avenue Intersection Project (10 min.) 8:30 PM 8. Town Meeting Preparation Process (10 min.) 8:40 PM 9. Send Letter to State with Resolution on Fossil Fuel Divestment (5 min.) 8:50 PM 10. Appointment/Reappointment (5 min.) 8:55 PM a. Human Services Committee - Appointment b. MPO Designee - reappoint c. Planning Board Subcommittee on Housing - appointment 11. Town Manager Appointment - Recreation Committee (5 min.) 9:00 PM 12. Future Meetings (5 min.)9:05 PM 13. Consent Agenda (5 min.)9:10 PM a. Use of Battle Green - Travel Channel b. Accept Terms of the Robin Elizabeth Glabe Scholarship Fund c. Accept Terms of the William Stetler Nichols Scholarship Fund d. Designate Members of Grain Mill Alley Steering Committee as Special Municipal Employees. CONSENT AGENDA EXECUTIVE SESSION 1. Executive Session: Exemption 6 - Consider Purchase, Exchange, Lease or Value of Real Property 9:15 PM ADJOURN The next regular meeting of the Board of Selectmen is scheduled for Monday, June 1, 2015, at 7:00 p.m. in the Selectmen Meeting Room. Hearing Assistance Devices Available on Request All agenda time and the order of items are approximate and subject to change. AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Michelle Ciccolo ITEM NUMBER: I.1 AGENDA ITEM TITLE: Accept Donation from Rotary for Community Center (5 min.) SUMMARY: Members of Rotary Club of Lexington will be at your meeting for a presentation of their donation and a thank you from the Board. I expect the Colonial Times and Lexington Minuteman to be their for a photo op. RECOMMENDATION / SUGGESTED MOTION: FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 7:00 PM ATTACHMENTS: Description Type Thank You Letter - Rotary Backup Material May 14, 2015 Dave Eagle Chairman of the Charitable Trust Rotary Club of Lexington P.O. Box 615 Lexington, MA 02421 Dear Mr. Eagle: The Board of Selectmen and the Community Center Advisory Committee are tremendously grateful to the Rotary Club of Lexington for its generous donation of $17,000 for equipment and supplies for the Community Center Billiards Room. This donation has enabled the complete fit-up of the Billiards area which we anticipate will become a much loved activity venue at the new Community Center. In addition, the donation allows Lexington to have two professional billiards tables suitable for tournaments with neighboring communities. Residents are eagerly looking forward to having this opportunity. The Rotary Club sponsorship is important to the mission of the Lexington Community Center and has greatly enriched the programming we will be able to offer the Town. Thus, it is with appreciation and thankfulness that we extend this letter of gratitude to the Rotary Club of Lexington and all its members. Sincerely, Michelle L. Ciccolo Selectman and Chair of the Community Center Advisory Committee lap AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.2 AGENDA ITEM TITLE: Discussion of School District Building Projects Plan (10 min.) SUMMARY: This agenda item will appear on every regular meeting of the Board to allow us to hear and discuss status updates on the progress on the building and administrative responses to overcrowding in the school system. This week's updates: Action Items arising from Friday May 8 pre-summit meeting1. Project Team presentation to School Committee - Tuesday May 19, 2015 6pm at the Selectmen's Meeting Room 2. Project web site accessible from quick links on the LPS web site or at: http://www.lexingtonmultipleprojects.com 3. Other status TBD4. RECOMMENDATION / SUGGESTED MOTION: N/A FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 7:05 PM AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: David Kucharsky, Transportation Planner; David Cannon, Assistant Town Engineer ITEM NUMBER: I.3 AGENDA ITEM TITLE: Presentation on Westminster Avenue/Lowell Street Intersection SUMMARY: In response to a neighborhood inquiry, the Board of Selectmen requested that the Transportation Safety Group review vehicle and pedestrian improvements at this intersection. RECOMMENDATION / SUGGESTED MOTION: Move to approve the proposed traffic and pedestrian safety improvements at the Westminster Avenue/Lowell Street intersection. FOLLOW-UP: If approved by the Selectmen, DPW will schedule this work APPROXIMATE TIME ON AGENDA: 7:15 PM ATTACHMENTS: Description Type Project History and Proposed Design Presentation Lowell/Westminster Intersection Improvements Background•April 1, 2014 - Traffic Safety Advisory Committee (n.k.a. Transportation Safety Group) reviewed a request to address traffic speeds and safety conditions in this area. Committee agreed that improvements should be considered given the increased activities associated with LexFarm, a planned LexHab site and other factors.•July 8, 2014 – During a regularly scheduled committee meeting TSAC invited members of the public to view and comment on a preliminary concept plan which included new sidewalks, a crosswalk and a reconfiguration of the Lowell Street/Westminster Avenue intersection.•September 12, 2014 – Planning & Engineering staff met with representative from Lex Farm and residents from 48 Lowell Street at the location of the proposed improvements to further refine the concept plan.•March 10, 2015 – A public meeting was held with area residents to review the latest plans for the intersection (approx. 12 people attended). LexFarm³ AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Charlotte Rodgers, Human Services Director ITEM NUMBER: I.4 AGENDA ITEM TITLE: Youth Services Programming (30 min.) SUMMARY: This past year, the School Committee appointed an ad hoc committee for youth at risk to make recommendations to reduce stress, build resiliency and provide services for youth at risk. School Department staff previously provided its feedback on this report. Attached is additional feedback from the Department of Human Services. Further, a representative from the School Committee will suggest formation of a committee to provide direction to the Board of Selectmen and School Committee to implement all or portions of the recommendations in the report. RECOMMENDATION / SUGGESTED MOTION: Options to consider: Take recommendations under advisement• Discuss further at Selectmen's Goal Setting Session in July• Discuss further with Youth Services Committee• FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 7:25 PM ATTACHMENTS: Description Type Response to Report Presentation Youth Services Council Charge Backup Material Overview of gYouth and Family Services Programming Backup Material Response from the Town of Lexington Human Services Department to Ad hoc Committee for Youth at Risk Report and Recommendations Board of Selectmen Monday May 18, 2015 Charlotte Rodgers RN, MA, CCM Human Services Director Leadership and Organization Youth Services Council •Brings together Municipal, School, Community leaders with the major role of identifying unmet needs, planning and coordinating programs •Facilitates interdepartmental collaboration and community participation •Monthly meetings with wide communication back to boards and committees 2 Youth and Family Programming Current initiatives •Human Services Department collaborates with Lexington Public School (LPS) staff to plan and promote a variety of educational programs for youth and parents •Recreation and Community Programs Department provides youth recreation programming, serving over 7,000 youth in 2014 •Major initiatives with LPS and community include Stress Reduction Programming, Media Violence and the Effect on Children, Cyberbullying, Community Discussions on Underage Drinking and Marijuana and Youth 3 Counseling and Case Management •The Human Services Department staff includes 4 master’s level positions that include LICSW, RN, CCM and LSW who provide accessible no cost counseling, consultation and case management to Lexington residents of all ages •Holistic Approach •Case Management – the Human Services Department provides immediate assessment, referrals and counseling; as well as long term case management support •Parent Coaching and School Consultation services 4 Recommendations •The Human Services Department recommends that the report of the Ad hoc Committee for Youth at Risk be referred to the Youth Services Council so the identified areas of need are addressed •The Youth Services Council should use this report as a guide to developing future efforts for education and programming, and to develop a work plan •The future of Youth and Family programming in Lexington is bright! Opportunities for expansion and coordination of services for youth and families will be implemented at the new Lexington Community Center 5 Human Services Department 1475 Massachusetts Avenue Lexington, Massachusetts 02420 781-861-0194 Youth Services Council Description: The Youth Services Council’s overall mission is to: • Identify unmet needs for mental health, substance abuse, risky behaviors and related services among Lexington youth • Improve the availability of such services to all Lexington youth • Facilitate coordination and collaboration among service providers in Lexington • Communicate recommendations (program, goals or budget needs) to the Human Services Committee and the Human Services Director • The Human Services Director will report findings to the Town Manager • The Human Services Committee will report findings to the Board of Selectmen Members: The Youth Services Council is a community and interdepartmental working group with representatives from: • Board of Selectmen • Human Services Department • Recreation Department and Community Programs Department • Cary Memorial Library • School Prevention, School Health and Wellness, School Guidance Departments • School Committee • PTSA/PTO Leadership • Police Department (School Resource Officer) • Fire Department • Community Representative • 5 Student Representatives Staff Support and Facilitation: Youth and Family Services Social Worker, Human Services Department Director and/or other staff as assigned Meetings/Contact info: Monthly - For more information contact Kristie Demirev LICSW at kdemirev@lexingtonma.gov Current Members (not updated for FY 2016): Norman Cohen Board of Selectmen Charlotte Rodgers Human Services Department Director Kristie Demirev Human Services Department Sheila Butts Community Center Director Thomas Romano Recreation and Community Programs Jennifer Forgit Cary Memorial Library, Teen Librarian Julie Fenn School Prevention Jennifer Wolfrum School Health and Wellness Val Viscosi School Guidance Department Manjua Karamcheti School Guidance Department Jessie Steigerwald School Committee Bettina McGimsey PTAS/PTO Leadership Jen Vogelszang PTSA/PTO Leadership Peg Gibson PTSA/PTO Leadership Sharon Kendall PTSA/PTO Leadership Jillian Dimmock PTSA/PTO Leadership Jeff Chaisson Lexington Police Department Tim Johnson Lexington Fire Department Dan Palant Community Representative + 5 Youth Members (names withheld) Town of Lexington Human Services Department 781-861-0194 Fax 781-863-2271 1475 MASSACHUSETTS AVENUE • LEXINGTON, MASSACHUSETTS 02420 Human Services Department/ Overview of Youth and Family Services The Human Services Department works with families (youth, adults, seniors) experiencing a wide range of challenges. Financial distress, stress, mental illness (depression, anxiety disorders, schizophrenia, bipolar disorder, etc.), domestic violence, lack of parenting supports, homelessness, substantiated abuse and/or neglect and addiction are some of the stressors faced by Lexington families. Work with these families involves connecting them to resources (Fuel Assistance, Food, Mass Health), as well as stabilization (counseling the family) with the goal of providing a fairly seamless transition to therapeutic supports such as longer term counseling and therapy groups. Many of these families are referred to the department by the Lexington Public School staff (guidance, social work or nursing). The Human Services Department maintains an excellent relationship with the LPS Wellness, Guidance and Counseling Department, collaborating on several ongoing projects. The follow list provides an overview of community partnerships, collaborations and initiatives: • Maintain “Forum for Youth” therapy listing and referral source with yearly updates • 2009 CHNA 15 Grant awarded to LPS and HSD “Red Flags and Resources Guide” • Teen-Adult Community Dialogue Nights “Can We Talk” and “Listen to Me” • 9th grade Girls Group – led by HSD social worker in collaboration with LHS prevention specialist • Middle School Boys Group (at risk) at Clarke Middle School (2014) • Ongoing collaboration on yearly stress reduction programming at LHS with SADD (Students Against Destructive Decisions) – “Stop and Smell the Noses” and other initiatives that address safety, risky behaviors and stress in collaboration with PE, Health and Wellness and Prevention at the high school • Co-sponsored “AP Courses and Other Myths about What Colleges Really Want” with YSC and LHS • Co-sponsored “Social Host Liability” event with the DA, Lexington Police, YSC and LHS • Coordinate monthly Parenting Matters article in the Colonial Times magazine, authored by staff & local experts who work with families and children • Collaborated on presentation of “Hidden Pictures” – sponsored by the community and focused on Global Mental Health initiative • Co-sponsored “Media Violence and the Effect on Children” panel presentation with YSC • Co-sponsored two presentations on “Cyberbullying” by Elizabeth Englander, nationally known expert on cyberbullying and cyber safety issue • Interdepartmental collaboration with Lexington Health Department on CHNA 15 Mental Health/Community grant (Mental Health First Aid Classes and Community conversation) • Co-sponsor 2015 “Parent Academy” with SHAC, PTA/O Presidents Council, Chamber of Commerce, CAAL, IAL and Lexington Youth and Family Services, Inc. • Co-Sponsor 2015 “Clearing Away the Smoke – Facts and Fiction about Marijuana and Youth” with LHS PE/Wellness, PTSA and the Human Services Department • Co-sponsor 2015 “Thinking Not Drinking” – A Community Discussion on Underage Drinking” with the Lexington Police Department, LHS PTSA, SADD and PE/Wellness • Collaboration on Community Movie Nights for Youth and Summer Fun Fest AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.5 AGENDA ITEM TITLE: Center Streetscape Project - Meriam Street to Police Station (30 min.) SUMMARY: Discuss issues raised at Town Meeting with aspects of the Center Streetscape project other than changes to the intersection at Massachusetts Avenue and Woburn Street. RECOMMENDATION / SUGGESTED MOTION: FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 7:55 PM ATTACHMENTS: Description Type 10/6/2014 Center Streetscape Presentation Backup Material Lexington Town Center Streetscape Project Town Center Streetscape Project Lexington, MA Project Update Board of Selectmen Meeting October 6, 2014 Lexington Town Center Streetscape Project Project Update Date Committees 6/24/2013 Transportation Forum 8/8/2013 Center Committee 9/10/2013 Streetscape Committee 9/30/2013 Streetscape Committee 11/25/2013 Streetscape Committee 12/5/2013 Public Meeting Workshop 12/19/2013 Streetscape Committee (debrief public workshop) 1/9/2014 Streetscape Committee (on Battlegreen) 1/9/2014 ADA Committee 1/18/2014 Battle Green Committee 2/14/2014 Coordination Meeting with Nelson Nygaard on Parking Study 2/20/2014 Battle Green Committee 2/28/2014 Tourism Committee 3/11/2014 Pre-BOS meeting with Town Manger 3/12/2014 Property Owners Meeting 3/12/2014 Streetscape Committee-Lighting 3/17/2014 BOS Meeting 3/18/2014 Public Meeting 6/13/2014 Streetscape Committee (Preliminary Design Reviews 7/10/2014 ADA Committee 7/17/2014 Preliminary Design Submittal 9/10/2014 Streetscape Committee (Project Coordination) Lexington Town Center Streetscape Project Presentation Outline •Town Center 1.Traffic Safety Improvements •Pedestrians, Bicycles & Vehicles 2.Streetscape Improvements •Walkway Treatment Renderings •Interpretive Elements Lexington Town Center Streetscape Project Overall Plan Waltham St Edison Way Cary Memorial Library Meriam St Cary Memorial Building Project Limit Project Limit Lexington Town Center Streetscape Project Lexington Town Center Streetscape Project Electronic Blankout Sign With Volume Controlled Audio Feature Lexington Town Center Streetscape Project Massachusetts Avenue/Woburn Street/Winthrop Road Intersection Lexington Town Center Streetscape Project Design Option Comparisons Massachusetts Avenue/Woburn Street/Winthrop Road Intersection Design Option Pros Cons Option 1 - Do Nothing Maintains existing traffic movements. Maintains the existing island. Unsafe traffic patterns. No pedestrian or bicycle accommodation. Queuing on Woburn Street (320 feet) Poor Operation (LOSF) Appearance/ expansive pavement Option 2 - Modify Geometry, No Signal Establish gateway to Town Center. Pedestrian/ bicycle accommodations. Improved traffic patterns/ channelization. Traffic Calming. Pedestrian crosswalk unprotected. Increased traffic queues on Woburn Street. (Minuteman crossing; 500 ft. beyond) Poor operation (LOSF). Option 3 - Modify Geometry, Traffic Signals Enhanced gateway to Town Center Protected pedestrian/ bicycle accommodations. Improved traffic safety/ operations. Traffic calming benefits. Manage Mass. Ave. Traffic. Manage Winthrop Rd. traffic. Installation and maintenance of traffic signals. Roundabout Controls traffic without the use of traffic signals. Requires extensive Right-of-Way. Lexington Town Center Streetscape Project Design Option Comparisons Summary Massachusetts Avenue/Woburn Street/Winthrop Road Intersection Design Option Option 1 (Do Nothing) Option 2 (Modify Geometry, No Signal) Option 3 (Modify Geometry, Traffic Signal) 1.Overall Safety - + + + 2.Pedestrian Crossing - + + + 3.Traffic Calming - + + + 4.Level of Operation (Delays/ LOS) - -- + 5.Appearance - + + + 6.Gateway - + + + 7. Winthrop Rd. - + + Legend -Negative +Positive Note: Our recommendation is Option 3. It provides overall safety, operational improvements and gateway enhancements. Lexington Town Center Streetscape Project Massachusetts Avenue/Woburn Street/Winthrop Road Intersection Recommended Option Lexington Town Center Streetscape Project Existing Proposed View A Lexington Town Center Streetscape Project Existing Proposed View B Lexington Town Center Streetscape Project Commercial Area/ Waltham Street Gateway Lexington Town Center Streetscape Project Grain Mill Alley •Gathering Area/Historic Interpretation •Coordinate with Grain Mill Alley Previous Design Lexington Town Center Streetscape Project Salter Building Previous Design Lexington Town Center Streetscape Project Lexington Town Center Streetscape Project Lexington Town Center Streetscape Project Next Steps •Final Design –50 % Design –100 % Design •Construction Phase (2 to 3 Phases Subject to Funding Availability) AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.6 AGENDA ITEM TITLE: Conflict of Interest Obligations for Committee Members - Mass. Avenue Intersection Project (5 min.) SUMMARY: Committee members who reside in the Mass Ave 3 intersections project corridor may be subject to the provisions of the conflict of interest law. Committees that might take action on this project may include: Bicycle Committee, Sidewalk Committee, Transportation Safety Committee, Historical Commission, etc. The conflict of interest law, G. L. c. 268A, is intended to prevent, among other things, self-dealing. Section 19 of the conflict law generally prohibits a municipal employee (paid or unpaid, appointed or elected, full- time or part-time) from participating in any particular matter in which the municipal employee, an immediate family member or partner, or a business organization in which he or she has certain affiliations, has a financial interest. The exemption most often available for appointed municipal employees is § 19(b)(1). A municipal employee who first advises his or her appointing authority of the nature and circumstances of the particular matter, makes full disclosure of the financial interest, and then receives in advance a written determination made by the appointing authority may act in matters in which he or she would otherwise be prohibited from participating. This exemption is not available to elected municipal employees because they do not have an appointing authority. The determination made by the appointing authority is that "the interest is not so substantial as to be deemed likely to affect the integrity of the services which the municipality may expect" from the employee. Whether the municipal official receives the written determination rests solely with the appointing authority. The Ethics Commission has no role in making the determination. RECOMMENDATION / SUGGESTED MOTION: FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 8:25 PM AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Michelle Ciccolo ITEM NUMBER: I.7 AGENDA ITEM TITLE: Approve Letter to MassDOT - East Mass. Avenue Intersection Project (10 min.) SUMMARY: Note: Acting on the advice of the State Ethics Commission, Selectman Pato - whose property directly abuts this project - will recuse himself from this item. Attached is another draft letter to MassDOT regarding the Massachusetts Avenue Roadway Reconstruction Project for discussion and approval. Also attached is additional information provided by Richard Canale. RECOMMENDATION / SUGGESTED MOTION: Motion to send the proposed letter to MassDOT regarding the Massachusetts Avenue Roadway Reconstruction Project asking for their assistance to accelerate the MassDOT internal reviews necessary for the project to move to 100% with PS&E drawings. FOLLOW-UP: Selectmen's Office APPROXIMATE TIME ON AGENDA: 8:30 PM ATTACHMENTS: Description Type Proposed Letter to MassDOT Backup Material Staff Recommendation Backup Material Project Evaluation Backup Material Proposed Draft TIF Backup Material Evaluation Summary Backup Material May 18, 2015 Patty Leavenworth, Chief Engineer MassDOT, Highway Division 10 Park Plaza Boston, MA 02116 RE: Mass. Avenue, Lexington, PROJIS 607409 Ms. Leavenworth: Thank you for this opportunity to comment on the proposed Massachusetts Avenue Roadway Reconstruction Project now at the 25% design stage. We are writing as a follow-up to the MassDOT Public Hearing held on May 7, 2015, and have several additional comments we wish to be included in the official record. The Board of Selectmen has consistently voted to support studies and engineering funds aimed at addressing needed improvements along this corridor. Moreover, it featured this project as part of its commitment to “Complete Streets” projects in the 2014 Lexington Town Report. This area has long been a challenge for pedestrian and bicycle safety and is a heavily traveled regional corridor by the motoring public. Two of the three intersections included in this project are frequently congested and the Massachusetts Avenue and Maple Street intersection has a high accident rate compared to other Lexington intersections. As you know, Massachusetts Avenue is a critical regional route providing important access to homes, jobs, and services to the community of Lexington, as well as its neighboring communities of Woburn, Winchester, Arlington, Waltham, and Burlington, all of which utilize Massachusetts Avenue to interconnect. Massachusetts Avenue is also a key transit route hosting MBTA Bus Routes 62 and 76. Finally, in June, the Town will open its new Community Center at 39 Marrett Road which we expect will lead to yet more travel in this corridor by all transportation modes. Over the years, the Town has held a number of public information sessions and reached out to the community in innovative ways to seek input and gather ideas. We recognize that the plans are still at the 25% design phase and may change further in meaningful ways before the project is ready to bid. Nonetheless, as a Board, we are committed to completing the design of the project in a timely fashion. Moreover, although no community can ever achieve 100% consensus on any project, we have received feedback both positive and negative and are working to incorporate residents’ ideas and suggestions. We believe the community, based on this input Patty Leavenworth, Chief Engineer May 18, 2015 MassDOT Page Two and on the fact that Town Meeting supported design funding, expects us to deliver a project that addresses the safety concerns along this corridor and that there is broad community support to proceed with making meaningful improvements along the corridor. Indeed, Town Meeting unanimously approved $500,000 in funding last year to bring this project to final design and have appropriated a total of $790,000 over the years for the design of this corridor. As mentioned above, the value of this project goes beyond providing improvements for automobile travel. Just this past month the Lexington Town Meeting approved without opposition a resolution calling on the Board of Selectmen to take urgent action to address town- wide bicycle and pedestrian safety needs. That same night Town Meeting also voted without opposition to accept Section 1 of Chapter 90-I of the Massachusetts General Laws related to the Commonwealth’s Complete Streets Program. The Boston MPO has voted in support of advancing this multi-modal project and has scheduled the TIP Funding for Federal Fiscal Year 2016 with advertising expected before September 30, 2016. Given the TIP schedule the Town is working proactively with BSC Engineering to complete the plans. In order to do so and keep the project on track, we will schedule additional public input meetings as necessary. We urge you to assist the Town in completing the design of these plans by accelerating the MassDOT internal reviews that are necessary for the project to move to 100% with PS&E drawings. We view the proposed Massachusetts Avenue Roadway Reconstruction Project as an integral element of responding to the community’s desire for safe multi-modal transportation infrastructure and support advancing the project and thank you for your support of this project. Sincerely, NOTE: Selectman Joseph Pato is a direct abutter to this project and acting on the advice of the State Ethics Commission has recused himself from all matters pertaining to the project. lap cc: Stephanie Pollack, MassDOT Secretary Paul Stedman, Acting District 4 Highway Director David Mohler, Executive Director, Office of MassDOT Planning Eric Bourassa, Transportation Director, MAPC Senator Kenneth Donnelly Senator Mike Barrett Representative Jay Kaufman State Transportation Building • Ten Park Plaza, Suite 2150 • Boston, MA 02116-3968 Tel. (857) 702-3700 • Fax (617) 570-9192 • TTY (617) 570-9193 • www.bostonmpo.org Stephanie Pollack, MassDOT Secretary and CEO and MPO Chairman Karl H. Quackenbush, Executive Director, MPO Staff BOSTON REGION METROPOLITAN PLANNING ORGANIZATIONBOSTON REGIO N METROP OLITA N PLANNI N G O RGANIZATIONMPO MEMORANDUM DATE: April 16, 2015 TO: Boston Region Metropolitan Planning Organization FROM: Sean Pfalzer, Transportation Improvement Program Manager, MPO Staff RE: Staff Recommendation for the FFYs 201619 Transportation Improvement Program Highway Target Funding The purpose of this memorandum is to present a staff recommendation for the MPO’s Highway Target funds for federal fiscal years (FFYs) 2016–19 Transportation Improvement Program (TIP). This year’s staff recommendation proposes transportation projects and programs to fund with the MPO’s Regional Highway Target Funding over the upcoming four federal fiscal years of the TIP. In developing the staff recommendation, MPO staff worked with the target funding levels to: • Address project schedule issues • Allocate funding to current and ongoing TIP commitments • Propose new projects to receive funding that advance the MPO’s priorities This memo proposes 11 new projects for the upcoming TIP. The newly proposed projects are primarily derived from this year’s First-Tier List of Projects. This list includes projects that have earned the highest scores in the MPO’s evaluation process and that could be made ready for advertising within the scope of the TIP. REGIONAL HIGHWAY TARGET FUNDING MassDOT released the draft Regional Highway Targets on March 17, 2015. The Regional Targets indicate that the Boston Region MPO has approximately $350 million to spend on projects and programs in the FFYs 201619 TIP. Table 1 compares the funding levels of the current TIP and the FFYs 201619 TIP. As shown in the table, there are significant increases in target funding in FFYs 201718. In FFY 2019, the Regional Target remains higher than last year’s levels, at approximately $92.6 million. TABLE 1. Comparison of Regional Target Funding, Current vs. New Total Regional Target FFY 2016 FFY 2017 FFY 2018 FFY 2019 Total Current Funds $75,009,821 $75,009,821 $75,009,821 New Funds $75,009,821 $88,759,294 $92,626,333 $92,626,333 $349,021,781 Difference $0 $13,749,473 $17,616,512 Boston Region MPO 2 April 16, 2015 The Regional Highway Target Funds contain annual targets for three of the eligible funding programs: 1) Congestion Mitigation and Air Quality Improvement (CMAQ) Program, 2) Highway Safety Improvement Program (HSIP), and 3) Transportation Alternatives Program (TAP). Under the federal transportation bill, Moving Ahead for Progress in the 21st Century Act (MAP-21), the CMAQ Program provides a flexible funding source for transportation projects and programs that help meet the requirements of the Clean Air Act; HSIP aims to achieve a significant reduction in traffic fatalities and serious injuries; and TAP supports the implementation of on- and off-road pedestrian and bicycle facilities, infrastructure projects for improving bicycle and pedestrian access to public transportation, and safe-routes-to-school projects. For the FFYs 201619 TIP, the funding targets remain the same for CMAQ and HSIP, and TAP increases in FFYs 2016-18. In developing the staff recommendation, staff considers project funding eligibility in order to allow the MPO to meet its funding targets. TABLE 2. Comparison of Regional Targets by Funding Program, Current vs. New The remaining portion of funding is eligible to be programmed under the Surface Transportation Program (STP) or the National Highway Performance Program (NHPP). The funding level for these two programs combined is capped at approximately $264 million over FFYs 2016-19. Regional Target by Funding Program FFY 2016 FFY 2017 FFY 2018 FFY 2019 Total Current CMAQ Target $13,427,220 $13,427,220 $13,427,220 New CMAQ Target $13,427,220 $13,427,220 $13,427,220 $13,427,220 $53,708,880 Difference $0 $0 $0 Current HSIP Target $4,296,710 $4,296,710 $4,296,710 New HSIP Target $4,296,710 $4,296,710 $4,296,710 $4,296,710 $17,186,840 Difference $0 $0 $0 Current TAP Target $4,346,838 $2,824,382 $2,824,382 New TAP Target $5,097,438 $3,312,089 $3,312,089 $2,548,719 $14,270,335 Difference $750,600 $487,707 $487,707 Current Non-CMAQ/HSIP/TAP Funds $52,939,052 $54,461,509 $54,461,509 New Non-CMAQ/HSIP/TAP Funds $52,188,452 $67,723,275 $71,590,315 $72,353,684 $263,855,726 Difference -$750,600 $13,261,766 $17,128,806 Boston Region MPO 3 April 16, 2015 PROJECT SCHEDULE ISSUES In working on a staff recommendation, MPO staff consulted with the MassDOT Highway Division to identify schedule issues for projects currently programmed in the FFYs 201518 TIP. There are six projects programmed in the current TIP that have a high risk of not being made ready for advertisement in their current fiscal year of programming. FFY 2015 • Improvements to Commonwealth Avenue in Boston • Tri-Community Bikeway in Winchester, Stoneham and Woburn FFY 2016 • Reconstruction of Route 85 in Marlborough • Intersection and Signal Improvements at Route 9 and Village Square (Gateway East) in Brookline • Middlesex Turnpike Improvements (Phase III) in Bedford, Billerica, and Burlington • Reconstruction and Widening on Route 18 in Weymouth and Abington CURRENT AND ONGOING COMMITMENTS Staff next identified current and ongoing programming commitments to the Green Line Extension, Phase 2, from College Avenue to Route 16 and Reconstruction and Widening on Route 18 in Weymouth. The MPO has supported these projects in the LRTP, programmed them in the FFYs 201518 TIP, and expects to continue programming them in the FFYs 201619 TIP. Table 3 lists the currently anticipated programming amounts for the projects in FFYs 201619 and future TIP programming beyond FFY 2019 for the Green Line Extension, Phase 2. Table 3 indicates that these projects, accounting for 17% of MPO target funding in FFY 2016, becomes an even larger share of the MPO’s investments in FFY 2017 (48%), FFY 2018 (66%), and FFY 2019 (50%). The remaining balance shown in the table represents funding that would need to be programmed in subsequent TIP years. Based on the current cost estimate and schedule, the project would require programming through FFY 2021. Boston Region MPO 4 April 16, 2015 TABLE 3. Summary of Current and Ongoing Commitments Table 4 below lists the Long-Range Transportation Plan commitments currently programmed and those commitments scheduled to be implemented through the TIP. Table 4 indicates that the MPO has committed nearly 73 percent of the Target Program to LRTP projects or major infrastructure projects between FFYs 2016-19, ranging from 50 percent in FFY 2019 to 86 percent in FFY 2016. TABLE 4. Overview of Long-Range Transportation Plan Commitments Projects FFY 2016 FFY 2017 FFY 2018 FFY 2019 Remaining Balance Green Line Extension, Phase 2 (Somerville and Medford) $8,100,000 $29,900,000 $40,000,000 $40,000,000 $72,000,000 Reconstruction and Widening on Route 18 (Weymouth) $4,800,000 $12,850,000 $21,031,758 $6,600,000 $0 Percent of Target Program 17% 48% 66% 50% Projects FFY 2016 FFY 2017 FFY 2018 FFY 2019 Remaining Commitments Middlesex Turnpike Improvements (Bedford, Billerica and Burlington) $21,691,442 $6,604,904 Reconstruction and Widening on Route 18 (Weymouth) $4,800,000 $12,850,000 $21,031,758 $6,600,000 Route 128 Add-a-lane (Needham and Wellesley) $30,000,000 $14,000,000 $13,768,183 Green Line Extension, Phase 2 (Somerville and Medford) $8,100,000 $29,900,000 $40,000,000 $40,000,000 $72,000,000 Reconstruction of Montvale Avenue (Woburn) $4,752,838 Total $64,591,442 $68,107,744 $74,799,941 $46,600,000 $72,000,000 Percent of Target Program 86% 77% 81% 50% Boston Region MPO 5 April 16, 2015 DEVELOPMENT OF THE STAFF RECOMMENDATION Based on the project schedule changes and ongoing commitments, MPO staff worked to prepare a staff recommendation that would satisfy the needs of currently- programmed projects and balance the following factors:  Readiness: Given the number of currently-programmed TIP projects that have a high risk of not being ready for advertisement in FFY 2016, MPO staff prioritized projects in the first two years that had the greatest likelihood of being ready for advertisement. Staff first sought currently-programmed projects in later years of the TIP to move forward into FFY 2016, however there were none that were ready. Then, staff identified unfunded projects that had a high likelihood of being ready for advertisement in FFY 2016 or 2017 based on MassDOT Highway Division guidance.  First-Tier List of Projects: When readiness was not the primary issue, MPO staff relied on the First-Tier List of Projects for newly proposed projects for programming. These projects ranked highest according to the evaluation criteria and are more likely to help the region attain the visions established by the MPO and meet its performance goals in the future. Given the high allocation percentage for major infrastructure in the current TIP, and the MPO’s desire for a larger percentage of lower-cost investment strategies, MPO staff prioritized the addition of non-major infrastructure over major infrastructure from the First-Tier List of Projects. Also, MPO staff used readiness as the deciding factor when two First-Tier List projects were under consideration for the same fiscal year.  Geographic equity: In prioritizing projects from the First-Tier List of Projects, MPO staff also considered geographic equity to help ensure that investments address needs throughout the region.  Cost: In prioritizing projects from the First-Tier List of Projects, MPO staff also accounted for cost to comply with fiscal constraint.  Long-Range Transportation Plan Implementation: MPO staff did not propose any new LRTP commitments. Given the high percentage of LRTP commitments (i.e. major infrastructure projects) in the TIP, and the MPO’s desire for a larger percentage of lower-cost investment strategies, MPO staff prioritized the addition of non-major infrastructure over major infrastructure from the First-Tier List of Projects. FIRST-TIER LIST OF HIGHWAY PROJECTS MPO staff created the First-Tier List of Highway Projects using project-evaluation results and information on readiness. The First-Tier List comprises projects that have received high scores through the TIP evaluation process, and that could be made ready for advertisement within FFYs 201619. Table 5 presents the First-Tier List of Highway Boston Region MPO 6 April 16, 2015 Projects. This year’s First-Tier List contains fourteen projects, totaling almost $130 million worth of transportation infrastructure investments. TABLE 5. First-Tier List of Highway Projects Proponent(s)Project Name Current Cost Estimate Project Evaluation Rank Design Status Newton and Needham (MassDOT) Reconstruction of Highland Ave, Needham St and Charles River Bridge, from Webster St to Route 9 $14,297,606 104 25% Approved Everett Reconstruction of Ferry St, South Ferry Stand a portion of Elm St $6,440,000 90 PRC Approved Natick Reconstruction of Route 27 (North Main St), from North Ave to the Wayland town line $13,090,726 88 25% Submitted Lexington Reconstruction on Massachusetts Ave, from Marrett Rd to Pleasant St $5,200,000 87 25% Submitted Hopkinton Signal and intersection improvements on Route 135 $7,235,377 85 25% Submitted Natick (MassDOT) Bridge replacement, Route 27 (North Main St) over Route 9 (Worcester St) and interchange improvements $25,793,370 84 25% Submitted Boston Improvements on Boylston St, from the intersection of Brookline Ave and Park Drive to Ipswich St $6,555,000 83 PRC Approved Ashland Reconstruction on Route 126 (Pond St), from the Framingham town line to the Holliston town line $13,277,165 77 25% Submitted Walpole (MassDOT) Reconstruction on Route 1A (Main St), from the Norwood town line to Route 27 $15,886,000 76 25% Approved Lynn Reconstruction on Route 129 (Lynnfield St), from Great Woods Road to Wyoma Square $3,457,578 73 25% Approved Milford Resurfacing and intersection improvements on Route 16 (Main St), from Water St to the Hopedale town line $2,800,000 73 25% Submitted Hingham Reconstruction and related work on Derby St from Pond Park Rd to Cushing St $3,840,661 71 25% Submitted Boston Traffic signal improvements at 9 locations $3,036,200 71 25% Submitted Boston Region MPO 7 April 16, 2015 OVERVIEW OF THE STAFF RECOMMENDATION The staff recommendation proposes programming 11 new projects, including 9 of the 14 projects from the First-Tier List of Projects. These nine complete street projects and two intersection improvement projects will help attain the MPO’s goals by advancing safety, system preservation, mobility, and economic vitality. These investments will implement past planning work through the United Planning Work Program (UPWP) by programming recommendations from three past MPO studies. These investments also promote geographic equity by addressing needs across MAPC subregions and community types. There are newly proposed projects in 6 out of the 8 MAPC subregions, including three projects in ICC, three projects in SSC, two projects in SWAP, and one project each in MAGIC, TRIC, and MWRC. These investments are also distributed across each of the four MAPC community types, including two projects in Inner Core communities, five projects in Maturing Suburbs, two projects in Developing Suburbs, and two projects in Regional Urban Centers. NEWLY PROPOSED PROJECTS FOR PROGRAMMING The staff recommendation proposes the following 11 new projects for the TIP, totaling approximately $75 million. FFY 2016  Lexington – Reconstruction of Massachusetts Avenue: The proposed project will address safety and capacity deficiencies at three intersections along Massachusetts Avenue; Marrett Road (Route 2A), Maple Street (Route 2A) and Pleasant Street (Routes 4/225). The improvements will be designed to be consistent with the principles of “complete streets” and will improve safety for pedestrians, bicyclists, and drivers. The project will also consolidate some uncontrolled mid-block crosswalks, improve transit (bus) operations and bus stops and provide bicycle accommodation along the roadway. o Investment Program: Complete Streets o Cost: $5,200,000 o Funding Eligibility: HSIP, CMAQ o Evaluation Rating: 87 points o CO2 Impact: 80 annual tons reduced o Project Length: 0.7 miles Newton Reconstruction and signal improvements on Walnut St, from Homer St to Route 9 $4,648,360 70 25% Submitted Boston Region MPO 8 April 16, 2015 o MPO/CTPS Study: Safety and Operational Improvements at Selected Intersections (2008) o MAPC Subregion: MAGIC o MAPC Community Type: Maturing Suburb  Weymouth – Intersection Improvements at Middle Street, Libbey Industrial Parkway and Tara Drive: The project will install traffic signals at the intersection of Middle Street, Libbey Industrial Parkway and Tara Drive. The project will include pavement rehabilitation, lane reconfiguration, sidewalk and wheelchair ramp installation/repair/reconstruction, installation and/or resetting of granite curbing and installation of signs and pavement markings. Since the side streets of this 4-way intersection are off-set, each side street will operate on a separate phase. o Investment Program: Intersection Improvements o Cost: $937,326 o Funding Eligibility: CMAQ o Evaluation Rating: 68 points o CO2 Impact: 6 annual tons reduced o Project Length: 0.1 miles o MAPC Subregion: SSC o MAPC Community Type: Maturing Suburb FFY 2017  Hingham – Reconstruction and related work on Derby Street: This project is proposed to address ongoing safety and capacity issues at the Derby Street/Route 3 ramps. Ramp modifications including signalization of ramps are proposed. In addition, there is a need to provide improved multi-modal accommodation on this targeted segment of Derby Street. o Investment Program: Complete Streets o Cost: $3,840,661 o Funding Eligibility: HSIP, CMAQ o Evaluation Rating: 71 points o CO2 Impact: 166 annual tons reduced o Project Length: 0.8 miles o MAPC Subregion: SSC Boston Region MPO 9 April 16, 2015 o MAPC Community Type: Maturing Suburb  Hingham – Intersection Improvements at Derby Street, Whiting Street (Route 53) and Gardner Street: Work on this project will consist of intersection improvements at Derby Street, Whiting Street (Route 53) and Gardner Street. Work includes the installation of a new traffic signal system and geometric modifications at the intersection. The project will also include improved accommodation for bicycles and pedestrians. o Investment Program: Intersection Improvements o Cost: $2,827,048 o Funding Eligibility: HSIP o Evaluation Rating: 59 points o CO2 Impact: increase of 60 annual tons o Project Length: 0.3 miles o MPO/CTPS Study: Route 53 Corridor Transportation Plan (2003) o MAPC Subregion: SSC o MAPC Community Type: Maturing Suburb FFY 2018  Walpole – Reconstruction of Route 1A (Main Street): The proposed project consists of reconstructing 8,000 feet of Route 1A including intersection and approach improvements at Fisher, Gould, North, and Bullard/Willet Streets, and at the Stop and Shop Plaza. The Route 1A bridge over the Neponset River, near the intersection with North Street, will be analyzed to determine if it can be rehabilitated or must be replaced. The limits of work are from approximately 2,000 feet north of Route 27 northerly to the Norwood town line. o Investment Program: Complete Streets o Cost: $15,866,000 o Funding Eligibility: CMAQ o Evaluation Rating: 76 points o CO2 Impact: 94 annual tons reduced o Project Length: 2.3 miles o MAPC Subregion: TRIC o MAPC Community Type: Developing Suburb Boston Region MPO 10 April 16, 2015 FFY 2019  Everett – Reconstruction of Ferry Street: The project will reconstruct Ferry Street from the Malden city line (Belmont Street) to Route 16 and Elm Street between Ferry Street and Woodlawn Street. The work will include resurfacing, new sidewalks, wheelchair ramps and curb extensions. The traffic signals at five locations and the fire station will be upgraded. Signals at Chelsea Street will be replaced by a roundabout. o Investment Program: Complete Streets o Cost: $6,440,000 o Funding Eligibility: CMAQ, HSIP o Evaluation Rating: 90 points o CO2 Impact: 159 annual tons reduced o Project Length: 1.6 miles o MPO/CTPS Study: Community Transportation Technical Assistance Program (2013) o MAPC Subregion: ICC o MAPC Community Type: Inner Core  Natick – Reconstruction of Route 27 (North Main Street): The project begins on Route 27 (North Main Street) at North Avenue and extends northerly 2.2 miles to the Wayland town line, excluding the Route 9 interchange. The proposed improvements include minor widening of the section of roadway south of Route 9 to a more consistent cross-section. The pavement will be reconstructed and cement concrete sidewalks will also be constructed on both sides of the roadway throughout the length of the project. The existing signals will be upgraded and, if warrants are met, new signals will be installed at Lake Street, Rutledge Road and Pine Street. o Investment Program: Complete Streets o Cost: $13,090,726 o Funding Eligibility: CMAQ o Evaluation Rating: 88 points o CO2 Impact: 74 annual tons reduced o Project Length: 2.2 miles o MAPC Subregion: MWRC o MAPC Community Type: Maturing Suburb Boston Region MPO 11 April 16, 2015  Hopkinton – Signal and intersection improvements on Route 135: The project involves intersection improvements at Route 85, Pleasant Street and Wood Street. The improvements include signal equipment upgrade, geometric modifications, and additional lanes at Route 85; possible signalization at Pleasant Street; and minor widening, geometric modifications and equipment upgrades at Wood Street. The project includes pavement rehabilitation from Ash Street to Wood Street, drainage improvements as needed, reconstructed sidewalks and wheelchair ramps, and streetscape enhancements in the town center. o Investment Program: Complete Streets o Cost: $7,235,377 o Funding Eligibility: HSIP, CMAQ o Evaluation Rating: 85 points o CO2 Impact: 566 annual tons reduced o Project Length: 0.8 miles o MAPC Subregion: SWAP o MAPC Community Type: Developing Suburb  Boston – Improvements on Boylston Street, from the intersection of Brookline Avenue and Park Drive to Ipswich Street: This roadway improvement project which will improve pedestrian mobility, encourage local and regional bicycle travel, and improve vehicular congestion. o Investment Program: Complete Streets o Cost: $6,555,000 o Funding Eligibility: CMAQ, TAP o Evaluation Rating: 83 points o CO2 Impact: 806 annual tons reduced o Project Length: 0.6 miles o MAPC Subregion: ICC o MAPC Community Type: Inner Core  Milford – Resurfacing and intersection improvements on Route 16 (Main Street), from Water Street to the Hopedale town line: The project involves Boston Region MPO 12 April 16, 2015 resurfacing along Route 16, from Water Street to the Hopedale Town line, a distance of 0.6 miles. Additional work includes sidewalk reconstruction, culvert repairs and related work. The project also includes improvements to the intersection of Route 16 and Route 140, including upgraded signal equipment and widening where feasible. o Investment Program: Complete Streets o Cost: $2,800,000 o Funding Eligibility: CMAQ, HSIP o Evaluation Rating: 73 points o CO2 Impact: 84 annual tons reduced o Project Length: 0.6 miles o MAPC Subregion: SWAP o MAPC Community Type: Regional Urban Center  Lynn – Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square: This roadway and safety improvement project includes drainage improvements, curbing, new sidewalks, wheelchair ramps, intersection improvements, pavement markings, signing, landscaping, and other incidental work. o Investment Program: Complete Streets o Cost: $3,457,578 o Funding Eligibility: CMAQ o Evaluation Rating: 73 points o CO2 Impact: 3 annual tons reduced o Project Length: 1.0 miles o MAPC Subregion: ICC o MAPC Community Type: Regional Urban Center SP/sp Evaluated Major Infrastructure Projects for the LRTPAbbreviated Project Name Project Cost AADTSafetyCost per EPDOEPDO per 100,000,000 vehiclesEPDOTop 200 Crash Location (Total EPDO)HSIP Cluster (Total EPDO)Truck Polygon (Truck-involved EPDO)HSIP Bicycle Cluster (Bike-involved EPDO)HSIP Pedestrian Cluster (Ped-involved EPDO)System PreservationImproves substandard pavementImproves substandard bridge Improves sidewalk infrastructureImproves bicycle facilities Improves emergency response/Improves response to extreme conditionsCapacity Management/Mobility (Autos)MPO-identified express highway bottleneck locationMPO-identified arterial bottleneck locationCapacity Management/Mobility (Buses)Number of Bus Routes ServedTotal Bus Trips Served DailyCapacity Management/Mobility (Peds/Bikes)Expands bicycle networkBay State Greenway Priority 100High Priority Gap (Network Evaluation Study)Expands sidewalk networkImproves transit accessEconomic VitalityProvides vehicle access to target development area Provides transit access to target development area Provides bicycle access to target development area Provides pedestrian access to target development area Mostly serves existing area of concentrated developmentPartly serves existing area of concentrated developmentFacilitates new developmentAllston Viaduct Realignment (Boston) $460,000,000 174,000 medium $1,133,005 236 406 3 high 7 X medium medium 9 421 high X X X high X X X X X XRoute 18 Widening (Weymouth)$58,822,115 29,600 high $43,252 4641 1360 6 10 4 high 8 1 8 X medium moderate low 1 127 medium 8 high X X X X XHighland Ave (Newton)$14,297,606 35,000 high $24,233 1703 590 3 1 high 9 1 6 X medium low 2 86 medium 6 X high X X X X XRoute 4/225 (Lexington) $23,221,000 40,200 high $44,400 1314 523 2 medium 8 X medium moderate medium 3 104 high 8 8 X medium X XRutherford Ave (Boston)$109,967,000 48,200 medium $561,056 411 196 1 1 high 9 3 6 X low low 8 897 high 6 X high X X X X X XMcGrath (Somerville) $56,563,000 38,000 medium $425,286 354 133 2 1 1 high 3 2 1.5 low low 7 558 high 1.5 X high X X X X X XExtend I-93 HOV Lane (Somerville to Woburn) $550,000,000 202,000 low $239,234 1150 2299 17 7 high 6 X high severe high 8 492 low medium X X XI-93/I-95 (Woburn)$294,000,000 373,000 high $207,774 383 1415 7 5 medium 1 X high severe medium 3 92 low medium X X XRoute 27/9 (Natick) $25,793,370 80,000 high $55,709 585 463 1 2 high 1 1 1 X medium medium 4 medium 1 X low XNew Boston St (Woburn)$9,706,549 14,000 low $9,706,549 7 1 low high low 0 high 0.5 0.5 X high X X X XRoute 1 Widening (Malden, Revere, Saugus)$236,078,161 115,000 medium $666,887 311 354 5 2 low 1 X high severe high 6 250 low medium X X XBraintree Split$53,288,794 282,000 high $32,612.48 585 1634 4 1 medium 3 X high severe medium 5 283 low low XMontvale Ave (Woburn)$4,225,256 31,000 high $15,534 886 272 1 1 high 1 0.5 X medium low 1 38 medium 0.5 X low XSouthampton Interchange (Boston) $143,750,000 225,000 medium $123,709 522 1162 1 medium 1 X medium severe medium 8 705 medium medium XI-93/I-95 (Canton) $186,700,000 240,000 medium $470,277 167 397 4 2 medium 2 X medium low 0 medium X X X high X X XRoute 128 Add-a-Lane (Needham, Wellesley)$150,000,000 188,000 medium $208,333 387 720 4 1 high 4 high severe low 1 50 low low XConcord Rotary $104,000,000 48,000 medium $594,286 368 175 2 1 high 6 1 X high severe low 0 low low XDedham St Ramp (Canton, Norwood, Westwood) $50,961,567 5,000 low $1,456,045 707 35 low 1 X high low 0 medium 1 1 X high X X XRoute 3 Widening $800,000,000 159,000 high $365,297 1391 2190 15 3 high 9 medium moderate low 5 361 low low XI-90/I-495 (Hopkinton) $220,000,000 209,000 medium $660,661 161 333 3 4 high 4 medium low 0 low medium X XMiddlesex, Phase III (Bedford, Burlington)$26,935,171 14,300 medium $402,017 473 67 high 3 1 low low 3 8 medium 3 3 X medium X X XRoute 126/135 (Framingham)$115,000,000 35,400 medium $542,453 605 212 1 1 1 1 low 0.5 0.5 X low medium 7 medium 0.5 X X high X X X X X XI-95 Add-a-Lane (Woburn) $32,900,000 164,000 medium $109,667 185 300 2 1 medium 2 X medium severe low 2 75 low medium X XMahoney Circle (Revere) $60,000,000 56,000 low $588,235 184 102 2 1 low 1 X medium moderate high 10 451 low medium X X XRoute 9/I-495 (Southborough) $25,000,000 135,000 low $342,466 55 73 1 high 2 medium low 0 low medium X XRoute 128, Phase II (Danvers, Peabody) $23,776,000 102,000 medium $65,319 360 364 3 1 high 7 2 X medium low 3 57 low low XBoardman St (Boston) $13,686,000 59,500 low N/A N/A N/A low 0.5 X high severe medium 5 205 low X medium X XWalnut Street Interchange (Saugus) $19,500,000 136,000 medium $103,723 140 188 1 low 0.5 X medium low 1 51 medium 1 0.5 X low XBridge St (Salem)$16,613,152 17,800 medium $117,824 800 141 1 medium 1 0.5 low low 5 133 low X medium X X XRoute 1/16 (Chelsea, Revere) N/A 40,200 low N/A 193 77 1 2 1 high 5.25 1 X low moderate low 2 75 low medium X X XI-95 Capacity Improvements (Lynnfield, Reading) $198,443,000 157,000 low $187,742 680 1057 6 1 low X high severe low 0 low medium X X XBoston Region MPO Staff - 4/16/2015 Evaluated Major Infrastructure Projects for the LRTPAbbreviated Project Name Project Cost AADTSafetyCost per EPDOEPDO per 100,000,000 vehiclesEPDOTop 200 Crash Location (Total EPDO)HSIP Cluster (Total EPDO)Truck Polygon (Truck-involved EPDO)HSIP Bicycle Cluster (Bike-involved EPDO)HSIP Pedestrian Cluster (Ped-involved EPDO)System PreservationImproves substandard pavementImproves substandard bridge Improves sidewalk infrastructureImproves bicycle facilities Improves emergency response/Improves response to extreme conditionsCapacity Management/Mobility (Autos)MPO-identified express highway bottleneck locationMPO-identified arterial bottleneck locationCapacity Management/Mobility (Buses)Number of Bus Routes ServedTotal Bus Trips Served DailyCapacity Management/Mobility (Peds/Bikes)Expands bicycle networkBay State Greenway Priority 100High Priority Gap (Network Evaluation Study)Expands sidewalk networkImproves transit accessEconomic VitalityProvides vehicle access to target development area Provides transit access to target development area Provides bicycle access to target development area Provides pedestrian access to target development area Mostly serves existing area of concentrated developmentPartly serves existing area of concentrated developmentFacilitates new developmentI-290/495 (Hudson, Marlborough) $100,000,000 162,500 medium $334,448 186 299 2 1 high 2 1 low low 0 low lowRoute 1A/16 (Revere) N/A 36,700 low N/A 39 14 1 3 1 medium 1.5 X low severe low 9 416 low medium X XBrimbal Ave, Phase II (Beverly) $23,000,000 73,500 low $383,333 82 60 1 medium 1 X low low 1 low medium X X XI-90/Interchange 17 (Newton) $4,000,000 141,000 medium $8,677 330 461 4 1 1 low 3 0.5 X medium severe low 12 528 low low X128 Capacity Improvements (Peabody) $24,634,000 110,000 low $98,536 230 250 2 low 1 X high severe low 1 36 low low XRiverside Ramp (Newton) N/A 23,500 low N/A 4 1 2 low low moderate low 1 20 low X medium X X XWashington Street Bridge (Woburn) $12,200,000 38,800 low $98,387 323 124 1 low 0.1 X low low 0 medium 0.1 X low XBoston Region MPO Staff - 4/16/2015 Proposed Draft FFYs 2016-20 TIP Target ProgramProponent(s) TIP ID Project NameInvestment CategoryCurrentFFY 2015ProposedFFY 2015CurrentFFY 2016ProposedFFY 2016CurrentFFY 2017ProposedFFY 2017CurrentFFY 2018ProposedFFY 2018ProposedFFY 2019ProposedFFY 2020Total Target Funds Proposed in FFYs 2016-19 TIPOther Funds (Non-Target Funds) Total TIP FundingAdditional InformationNeedham and Wellesley603711 Rehabilitation/Replacement of 6 Bridges on I-95/Route 128 (Add-a-Lane - Contract V) MI $30,000,000 $30,000,000 $30,000,000 $31,240,000 $14,000,000 $13,360,000 $13,768,183 $13,168,183N/A N/A$57,768,183N/A$57,768,183 adjustment to cash flows in FFYs 2016-18RegionwideN/AIntersection Improvement ProgramINT$400,000 $400,000N/AN/AN/AN/AN/AN/A N/A N/AN/A N/A N/Ano funding carved out for program in FFYs 2016-18Salem 605146Reconstruction on Canal Street, From Washington Street & Mill Street to Loring Avenue & Jefferson AvenueCS$7,867,762 $7,867,762N/AN/AN/AN/AN/AN/A N/A N/A N/AN/AN/A N/ABoston 606284 Improvements to Commonwealth Avenue, From Amory Street to Alcorn Street CS $12,446,852 $12,446,852N/AN/AN/AN/AN/AN/A N/A N/AN/A N/A N/Ahigh risk of not making FFY 2015Winchester, Stoneham, and Woburn604652 Tri-Community BikewayB/P$5,429,110 $5,429,110N/AN/AN/AN/AN/AN/A N/A N/AN/AN/AN/Ahigh risk of not making FFY 2015Medway 605657 Reconstruction on Route 109, From Holliston Street to 100 Feet West of Highland Street CS $12,062,567 $12,062,567N/AN/AN/AN/AN/AN/A N/A N/AN/AN/AN/A N/ABrookline 605110 Intersection & Signal Improvements at Route 9 & Village Square (Gateway East) CSN/AN/A$4,591,009 $0N/A$4,818,649N/AN/A N/A N/A$4,818,649 $1,000,000 $5,818,649 moved from FFY 2016 to FFY 2017Marlborough 604810 Reconstruction of Route 85 (Maple Street) CSN/AN/A$5,397,727 $0N/A$5,613,636N/AN/A N/A N/A$5,613,636N/A$5,613,636 moved from FFY 2016 to FFY 2017Regionwide 456661 Clean Air and Mobility ProgramCAN/AN/A$374,850 $0N/AN/AN/AN/AN/A N/A$0N/A$0 removed from FFY 2016; was $374,850Bedford, Billerica, and Burlington29492 Middlesex Turnpike Improvements, From Crosby Drive North to Manning Road, Phase III MIN/AN/A$21,691,442 $21,691,442 $6,604,906 $6,604,906N/AN/AN/A N/A$28,296,348 $1,000,000 $29,296,348high risk of not making FFY 2016; AC over FFYs 2016-17Weymouth and Abington601630 Reconstruction & Widening on Route 18 (Main Street) From Highland Place to Route 139* MIN/AN/A$4,800,000 $4,800,000 $12,850,000 $12,850,000 $21,031,758 $21,031,758 $6,600,000N/A$45,281,758 $14,771,760 $60,053,518high risk of not making FFY 2016; AC over FFYs 2016-19; addition of $6.6 million in FFY 2019Somerville and MedfordN/AGreen Line Extension Project (Phase 2), College Avenue to Mystic Valley Parkway/Route 16 MIN/AN/A$8,100,000 $8,100,000 $29,900,000 $29,900,000 $40,000,000 $40,000,000 $40,000,000 $40,000,000$118,000,000N/A$118,000,000 addition of $40 million in FFY 2019 and FFY 2020Southborough 604989 Reconstruction of Main Street (Route 30), from Sears Road to Park Street CSN/AN/AN/AN/A$6,862,752 $6,862,752N/AN/A N/A N/A$6,862,752N/A$6,862,752 earliest ad date of FFY 2017Woburn 604935 Reconstruction of Montvale Avenue, from I-93 Interchange to Central Street MIN/AN/AN/AN/A$4,752,838 $4,752,838N/AN/A N/A N/A$4,752,838N/A$4,752,838 earliest ad date of FFY 2017Lexington 607409 Reconstruction on Massachusetts Avenue, from Marrett Road to Pleasant Street CSN/AN/AN/A$5,200,000N/AN/AN/AN/A N/A N/A$5,200,000N/A$5,200,000 new addition to FFY 2016Weymouth 605721 Intersection Improvements at Middle Street, Libbey Industrial Parkway and Tara Drive INTN/AN/AN/A$937,326N/AN/AN/AN/A N/A N/A$937,326N/A$937,326 new addition to FFY 2016Boston 606117 Traffic Signal Improvements at 10 Locations INT$3,036,200N/A$3,036,200 $3,036,200 new addition to FFY 2016Hingham 607309 Reconstruction and related work on Derby Street from Pond Park Road to Cushing Street CSN/AN/AN/AN/AN/A$3,994,287N/AN/A N/A N/A$3,994,287N/A$3,994,287 new addition to FFY 2017Hingham (MassDOT) 600518 Intersection Improvements at Derby Street, Whiting Street (Route 53) and Gardner Street INTN/AN/AN/AN/AN/A N/A$3,057,735N/A N/A$3,057,735N/A$3,057,735 new addition to FFY 2018Newton and Needham 606635Reconstruction of Highland Avenue, Needham Street and Charles River Bridge, from Webster Street to Route 9MI$15,464,292N/A$15,464,292 $15,464,292 new addition to FFY 2018Hopkinton 606043 Signal and intersection improvements on Route 135 CSN/AN/AN/AN/AN/AN/AN/AN/A$8,138,816N/A$8,138,816N/A$8,138,816 new addition to FFY 2019Everett 607652 Reconstruction of Ferry Street, South Ferry Street and a portion of Elm Street CSN/AN/AN/AN/AN/AN/AN/AN/A$7,244,124N/A$7,244,124N/A$7,244,124 new addition to FFY 2019Natick 605034 Reconstruction of Route 27 (North Main Street), from North Avenue to the Wayland Town Line CSN/AN/AN/AN/AN/AN/AN/AN/A$14,725,286N/A$14,725,286N/A$14,725,286 new addition to FFY 2019Boston 606453Improvements on Boylston Street, from the intersection of Brookline Avenue and Park Drive to Ipswich StreetCSN/AN/AN/AN/AN/AN/AN/AN/A$7,373,484N/A$7,373,484N/A$7,373,484 new addition to FFY 2019Milford 607428Resurfacing and intersection improvements on Route 16 (Main Street), from Water Street to the Hopedale town lineCSN/AN/AN/AN/AN/AN/AN/AN/A$3,149,619N/A$3,149,619N/A$3,149,619 new addition to FFY 2019Lynn 602077 Reconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma Square CSN/AN/AN/AN/AN/AN/AN/AN/A$3,889,305N/A$3,889,305N/A$3,889,305 new addition to FFY 2019Woburn 604996 Bridge Replacement, New Boston Street over MBTA MIN/AN/AN/AN/AN/AN/AN/AN/A N/A$11,355,289$0N/A$0 new addition to FFY 2020Boston 606226 Reconstruction of Rutherford Avenue, from City Square to Sullivan Square MIN/AN/AN/AN/AN/AN/AN/AN/A$7,000,000$0N/A$0 new addition to FFY 2020Ashland 604123 Reconstruction on Route 126 (Pond Street), from the Framingham town line to the Holliston town line CS$0$15,532,405$0 $0 new addition to FFY 2020Walpole (MassDOT) 602261 Reconstruction on Route 1A (Main Street), from the Norwood Town Line to Route 27 CSN/AN/AN/AN/AN/AN/AN/A$0 N/A$18,584,373$0N/A$0 new addition to FFY 2020DRAFT Total Available Regional Highway Target Funds:N/A$68,221,673 $68,221,673 $75,009,821 $75,009,821 $75,009,821 $88,759,294 $75,009,821 $92,626,333 $92,626,333 $92,626,333 $349,021,781Total Staff Recommendation Programmed Regional Highway Target Funds:N/A$68,206,290 $68,206,290 $74,955,029 $75,004,968 $74,970,496 $88,757,069 $74,799,941 $92,721,968 $91,120,634 $92,472,067 $347,604,639Regional Highway Target Funds Available:N/A$15,383 $15,383 $54,792 $4,853 $39,325 $2,225 $209,880 ($95,635)$1,505,699 $154,266 $1,417,142CMAQ Target:N/A$16,112,664 $16,112,664 $13,427,220 $13,427,220 $13,427,220 $13,427,220 $13,427,220 $13,427,220 $13,427,220 N/A $53,708,880Estimated CMAQ Proposed:N/A$17,829,110 $17,829,110$10,719,021 $10,037,326$17,465,590 $23,465,590 $13,427,220 $20,427,220 $18,427,220 $18,427,220$72,357,356HSIP Target:N/A$4,774,123 $4,774,123 $4,296,710 $4,296,710 $4,296,710 $4,296,710 $4,296,710 $4,296,710 $4,296,710 N/A $17,186,840Estimated HSIP Proposed:N/A$5,000,000 $5,000,000 $4,397,727$3,600,000$4,752,838 $10,144,852$0$6,057,735 $4,296,710 $4,296,710$24,099,297TAP Target:N/A$2,548,719 $2,548,719 $4,346,838 $5,097,438 $2,824,382 $3,312,089 $2,824,382 $3,312,089 $2,548,719 N/A $14,270,335Estimated TAP Proposed:N/A$2,548,719 $2,548,719 $4,346,838$2,600,000$2,824,382 $5,171,220$0$3,312,089 $2,548,719 $2,548,719$13,632,028*Assumes project cash flows, including earmark amounts are $13,400,000 in FFY 2016, $19,021,760 in FFY 2017, $21,031,758 in FFY 2018, and $6,600,000 in FFY 2019.Note: Projects in bold type are listed in the current Long-Range Transportation Plan, Paths to a Sustainable RegionIndicates a change in project costIndicates a project moved in to an earlier TIP elementIndicates a project moved out to a later TIP elementIndicates a new addition to the TIPIndicates removed from the TIPIndicates a new funding categoryMajor Infrastructure$328 million74%Complete Streets$105 million24%Intersection Improvements$7 million 2%Boston Region MPO Staff - 5/7/2015 FFYs 2016-19 TIP - Summary of Evaluated Highway ProjectsTIP ID Proponent(s) Project NameTIP/LRTP Status CTPS StudyEstimated CostDesign StatusTotal Rating (154 Points Possible):System Preservation, Modernization, and EfficiencyRating (36 Points Possible):Livability and Economic Benefit Rating (29 Points Possible):Mobility Rating (25 Points Possible):Environment and Climate Change Rating (25 Points Possible):Environmental Justice Rating (10 Points Possible):Safety and Security Rating (29 Points Possible):Greenhouse Gas Impact (Annual Tons of CO2 Reduced)Eligible Funding Sources606635Newton and Needham (MassDOT)Reconstruction of Highland Avenue, Needham Street & Charles River Bridge, from Webster Street to Route 9LRTP 2021-25N/A$14,297,60725% Approved104 30 17 13 18 6 20 312HSIP, CMAQ606284 BostonImprovements to Commonwealth Avenue, from Amory Street to Alcorn Street2015N/A$14,414,14525% Submitted96 28 16 15 9 8 20 57CMAQ, TAP607981Somerville (MassDOT)McGrath Boulevard ProjectN/A N/A$56,562,992PRC Approved96 30 18 13 12 9 14 636 CMAQ607652 Everett Reconstruction of Ferry StreetN/A2013 $6,440,000 PRC Approved90 30 12 14 11 5 18 159HSIP, CMAQ605034 NatickReconstruction of Route 27 (North Main Street), from North Avenue to the Wayland town lineN/A N/A$13,090,726 25% Submitted88 32 16 14 9 0 17 74CMAQ, HSIP607409 LexingtonReconstruction on Massachusetts Avenue, from Marrett Road to Pleasant StreetN/A2008 $5,200,000 25% Submitted87 30 10 15 8 6 18 80HSIP, CMAQ29492Bedford, Billerica, and BurlingtonMiddlesex Turnpike Improvements, from Crosby Drive North to Manning Road (Phase III)2016N/A$26,935,171 75% Submitted86 28 11 18 13 3 13Awaiting new informationN/A605146 SalemReconstruction on Canal Street, from Washington Street and Mill Street to Loring Avenue and Jefferson Avenue2015 2005 $7,852,431 75% Submitted85 22 16 12 10 6 19 18CMAQ, HSIP605110 BrooklineIntersection and signal improvements at Route 9 and Village Square (Gateway East)2016N/A$5,070,387 25% Submitted85 30 19 14 10 0 12 22CMAQ, TAP606043 Hopkinton Signal and intersection improvements on Route 135N/A N/A$7,235,377 25% Submitted85 24 14 14 16 0 17 566CMAQ, HSIP604810 Marlborough Reconstruction of Route 85 (Maple Street)2016N/A$5,144,104 25% Submitted84 16 15 10 18 6 19 325CMAQ, HSIP605313Natick (MassDOT)Bridge replacement, Route 27 (North Main St.) over Route 9 (Worcester St.) and interchange improvementsN/A N/A$25,793,370 25% Submitted84 34 12 15 8 0 15 -41 HSIP606453 BostonImprovements on Boylston Street, from intersection of Brookline Avenue and Park Drive to Ipswich StreetN/A N/A$6,555,000 25% Submitted83 16 18 14 16 5 14 806CMAQ, TAP605657 MedwayReconstruction on Route 109, from Holliston Street to 100 feet west of Highland Street2015 2003 $12,062,567 75% Submitted82 28 13 10 16 0 15 352CMAQ, HSIP, TAP604123 AshlandReconstruction on Route 126 (Pond Street), from the Framingham town line to the Holliston town lineN/A2011 $13,277,165 25% Submitted77 20 16 9 11 6 15 61HSIP, CMAQ, TAP602261Walpole (MassDOT)Reconstruction on Route 1A (Main Street), from the Norwood town line to Route 27N/A N/A$15,886,000 25% Approved76 28 14 10 6 6 12 94 CMAQ604652Winchester, Stoneham, and WoburnTri-Community Bikeway2015 1999 $5,568,342 75% Submitted75 20 15 9 17 0 14 435CMAQ, TAP604935 WoburnReconstruction of Montvale Avenue, from I-93 Interchange to Central Street2017N/A$4,225,256 25% Submitted75 30 10 9 8 0 18 46 HSIP605189 Concord Bruce Freeman Rail Trail, Phase 2C2016N/A$6,260,080 25% Approved73 24 14 10 10 2 13 79CMAQ, TAP604989 SouthboroughReconstruction of Main Street (Route 30), from Sears Road to Park Street2017 2007 $6,345,000 25% Approved73 22 13 12 11 0 15 101CMAQ, TAPProjects in bold font are already programmed in FFYs 2015-18 of the TIP. FFYs 2016-19 TIP - Summary of Evaluated Highway ProjectsPage 1 of 3Boston Region MPO Staff - 4/15/2015 FFYs 2016-19 TIP - Summary of Evaluated Highway ProjectsTIP ID Proponent(s) Project NameTIP/LRTP Status CTPS StudyEstimated CostDesign StatusTotal Rating (154 Points Possible):System Preservation, Modernization, and EfficiencyRating (36 Points Possible):Livability and Economic Benefit Rating (29 Points Possible):Mobility Rating (25 Points Possible):Environment and Climate Change Rating (25 Points Possible):Environmental Justice Rating (10 Points Possible):Safety and Security Rating (29 Points Possible):Greenhouse Gas Impact (Annual Tons of CO2 Reduced)Eligible Funding Sources602077 LynnReconstruction on Route 129 (Lynnfield Street), from Great Woods Road to Wyoma SquareN/A N/A$3,457,578 25% Approved73 20 8 14 9 5 17 3 CMAQ607428 MilfordResurfacing and intersection improvements on Route 16 (Main Street), from Water Street to the Hopedale town lineN/A N/A$2,800,000 25% Submitted73 22 12 13 4 6 16 84HSIP, CMAQ607309 Hingham Reconstruction and related work on Derby Street from Pond Park Road to Cushing StreetN/A N/A$3,840,661 25% Approved71 22 9 15 8 0 17 166HSIP, CMAQ606117 Boston Traffic signal improvements at 11 locationsN/A N/A$3,036,200 75% Submitted71 20 13 12 7 5 14 13 CMAQ601579 WaylandSignal and intersection improvements at Route 27 (Main Street) and Route 30 (Commonwealth Road)2016 2008 $2,479,451 100% Submitted70 24 10 10 12 0 14 115CMAQ, HSIP601704 NewtonReconstruction and signal improvements on Walnut Street, from Homer Street to Route 9N/A N/A$4,648,360 25% Submitted70 24 16 8 7 0 15 -18N/A601513Saugus (MassDOT)Interchange reconstruction at Walnut Street and Route 1 (Phase II)N/A N/A$18,612,130 25% Approved69 22 12 15 7 0 13Awaiting preferred alternativeHSIP1671 Everett Rehabilitation of Beacham StreetN/A N/AN/A Pre-PRC 69 20 10 8 9 4 18Assumed nominal decreaseN/A604531Acton and MaynardAssabet River Rail Trail2015 1997 $6,510,045 75% Submitted68 16 14 10 13 2 13 183CMAQ, TAP602310 DanversReconstruction on Collins Street, from Sylvan Street to Centre and Holten StreetsN/A N/A$7,300,000 75% Approved68 20 13 14 6 2 13 63 CMAQ605721 WeymouthIntersection improvements at Middle Street, Libbey Industrial Parkway and Tara DriveN/A2003 $937,326 75% Submitted68 20 12 16 5 0 15 6 HSIP604231 MarlboroughIntersection and signal improvements on Route 20 (East Main Street/Boston Post Road) at Concord RoadN/A N/A$1,706,600 25% Submitted67 24 7 16 7 3 10 67 CMAQ607255 HolbrookIntersection improvements and related work at Weymouth Street/Pine Street/Sycamore StreetN/A2011 $1,016,544 25% Submitted66 24 6 13 7 0 16 106HSIP, CMAQ604377 Gloucester Washington Street and Railroad AvenueN/A N/A$4,600,000 25% Approved65 12 15 9 8 4 17Assumed nominal decreaseN/A607888 Boston Multi-use path construction on New FenwayN/A N/A$1,702,618 25% Submitted65 6 17 11 13 5 13 106TAP, CMAQ604996 Woburn Bridge replacement, New Boston Street over MBTALRTP 2016-20N/A$8,297,198 25% Submitted62 12 19 11 13 0 7 1501N/A606002 DuxburySignal installation at Route 3 (NB and SB) ramps and Route 3A (Tremont Street)N/A N/A$2,400,000 PRC Approved61 24 4 17 3 0 13 70 CMAQ607732 Natick Cochituate Rail Trail, Phase TwoN/A N/A$5,417,832 25% Submitted60 6 14 10 12 3 15 126CMAQ, TAP600518Hingham (MassDOT)Intersection improvements at Derby Street, Whiting Street (Route 53) and Gardner StreetN/A2003 $2,827,048 25% Approved59 22 10 13 2 0 12 -64 HSIP606316 BrooklinePedestrian bridge rehabilitation over MBTA off Carlton Street2016N/A$2,846,700 25% Submitted59 10 13 8 11 5 12Assumed nominal decreaseTAP, CMAQProjects in bold font are already programmed in FFYs 2015-18 of the TIP. FFYs 2016-19 TIP - Summary of Evaluated Highway ProjectsPage 2 of 3Boston Region MPO Staff - 4/15/2015 FFYs 2016-19 TIP - Summary of Evaluated Highway ProjectsTIP ID Proponent(s) Project NameTIP/LRTP Status CTPS StudyEstimated CostDesign StatusTotal Rating (154 Points Possible):System Preservation, Modernization, and EfficiencyRating (36 Points Possible):Livability and Economic Benefit Rating (29 Points Possible):Mobility Rating (25 Points Possible):Environment and Climate Change Rating (25 Points Possible):Environmental Justice Rating (10 Points Possible):Safety and Security Rating (29 Points Possible):Greenhouse Gas Impact (Annual Tons of CO2 Reduced)Eligible Funding Sources605857 NorwoodIntersection improvements at Route 1 and University Avenue/Everett StreetN/A1999 $3,780,000 PRC Approved58 24 8 14 3 0 9No capacity analysisHSIP603739 Wrentham Construction of I-495/Route 1A rampsN/A N/A$4,002,192 PRC Approved55 18 1 15 10 0 11 540HSIP, CMAQ606130 NorwoodIntersection improvements at Route 1A and Upland Road/Washington Street and Prospect Street/Fulton StreetN/A N/A$3,275,390 25% Submitted55 20 7 10 5 0 13 37HSIP, CMAQ605743 IpswichResurfacing and related work on Central and South Main StreetsN/A N/A$2,624,154 25% Submitted51 10 13 8 6 0 14Assumed nominal decreaseN/A604811 MarlboroughReconstruction of Route 20 (East Main Street), from Main Street easterly to Lincoln StreetN/A N/A$2,252,930 75% Submitted51 10 9 11 7 3 11 6HSIP, CMAQ604638Danvers and Peabody (MassDOT)Mainline improvements on Route 128 (Phase II)N/A N/A$23,776,000 100% Approved49 12 3 18 3 0 13 No impact HSIP606501 HolbrookReconstruction of Union Street (Route 139), from Linfield Street to Centre Street/Water StreetN/A N/A$2,471,136 25% Submitted48 10 13 7 5 0 13Assumed nominal decreaseTAP601359 FranklinReconstruction of Pleasant Street, from Main Street to Chestnut StreetN/A N/A$5,378,680 75% Submitted45 12 11 6 4 0 12Assumed nominal decreaseN/A601607 HullReconstruction of Atlantic Avenue and related work, from Nantasket Avenue to Cohasset town lineN/A N/A$5,175,277 25% Approved43 6 11 2 8 0 16Assumed nominal decreaseN/A604745 Wrentham Reconstruction of Taunton Street (Route 152)N/A N/A$3,945,871 25% Approved36 6 10 2 4 0 14Assumed nominal decreaseN/AProjects in bold font are already programmed in FFYs 2015-18 of the TIP. FFYs 2016-19 TIP - Summary of Evaluated Highway ProjectsPage 3 of 3Boston Region MPO Staff - 4/15/2015 AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Suzie Barry ITEM NUMBER: I.8 AGENDA ITEM TITLE: Town Meeting Preparation Process (10 min.) SUMMARY: A few issues came up during the Spring ATM that the Board should look at in terms of procedural preparation for future Town Meeting. a. Delivery of Warrant: Do we want to consider a By-law change so we no longer have to mail the complete warrant. b. Publishing BOS positions on articles prior to Town Meeting: During the Spring 2015 ATM, a Town Meeting Member approached the Board and indicated it was difficult to determine what the Boards position was on articles and suggested the Board publish a report with positions and a brief statement similar to what AC and CEC do. Does the Board what to proceed with this request? If so, will we need to put in some deadlines for the Board in terms of making decisions/taking positions. c. The Town Manager and staff do a wonderful job making sure the budget and ready for the Board to vote ahead of Town Meeting so that Town Meeting Members can have adequate time to review the Brown Book. The season during which this happens is very busy for the Board with Agenda items. Do we want to consider setting a time certain on the night we vote the budget so it is done earlier rather than later in a meeting affording all who might want to make a public comment or attend the meeting for that issue are able to do so. d. Other procedural issues to consider: Consider taking a formal position on using the Consent Agenda for future Town Meetings and move to identify articles for the consent agenda early on in the process. • Consider making a Standard for PowerPoint presentations (i.e. font, color, size)• Consider requiring PowerPoint presentations be ready X # of days before they will be presented in order to give not only the BOS but TMtg members time to review and staff time to upload for presentation and for electronic document access • Consider having members not just present articles but work as a champion for the article (if necessary) and work with Town staff on the presentation and availability of speakers for the article. • Review making more things available electronically and how to communicate that • Consider having two different members serve as liaison to AC and CEC (not necessarily the Chair) and act as the conduit to make sure requests for information or clarity are being heard and addressed. • RECOMMENDATION / SUGGESTED MOTION: FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 8:40 PM AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.9 AGENDA ITEM TITLE: Send Letter to State with Resolution on Fossil Fuel Divestment (5 min.) SUMMARY: The Board will discuss its response to the resolution adopted by Town Meeting regarding fossil fuel divestment: Article 44 RESOLUTION ON FOSSIL FUEL DIVESTMENT (Citizen Article) MOTION: That the following resolution be adopted: Resolved: That the Town respond to the challenge of climate change by urging divestment from holdings in coal, oil and natural gas companies. To accomplish this Town Meeting asks those who manage Lexington’s Retirement and Trust Funds: To assess the Town’s fossil fuel exposure;• If deemed financially responsible, to divest over a 5-year period by selling any direct holdings in the 200 publicly traded companies with the largest carbon reserves; • To notify the managers of mutual funds that Lexington seeks divestment;• and further asks the Board of Selectmen to support financially responsible divestment of the Massachusetts Pension Reserve Investment Trust Fund, and send copies of this resolution to our federal and state representatives. RECOMMENDATION / SUGGESTED MOTION: Authorize the chair to send a copy of Town Meeting's resolution to Lexington's state and federal representatives with a cover letter from the Board. FOLLOW-UP: Selectmen's Office APPROXIMATE TIME ON AGENDA: 8:50 PM ATTACHMENTS: Description Type Certified Copy of Resolution Backup Material AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.10 AGENDA ITEM TITLE: Appointment/Reappointment (5 min.) SUMMARY: Human Services Committee The Committee has requested that Pamela Joshi be appointed to the Committee. MPO Designee The Board needs to reappoint Richard Canale as the MPO Designee without Joe Pato voting since he is an abutter of the 3 Intersection Project in East Lexington. Planning Board Subcommittee on Housing An ad-hoc committee of the Lexington Planning Board, the Ad-Hoc Committee for Residential Zoning and By-Law Review will assist the Planning Board in its review and analysis of residential development and zoning. See attached charge that asks Selectmen to designate a Liaison and recommend a resident to be appointed by the Planning Board. RECOMMENDATION / SUGGESTED MOTION: Motion to appoint Pamela Joshi to the Human Services Committee for a term to expire September 30, 2017. Motion to designate Richard Canale as Lexington's Representative to the Metropolitan Planning Organization. Motion to appoint Joe Pato and Michelle Ciccolo as the Selectmen Liaison to the Planning Board Subcommittee on Housing. FOLLOW-UP: Selectmen's Office APPROXIMATE TIME ON AGENDA: 8:55 PM ATTACHMENTS: Description Type Pamela Joshi Application/Resume Backup Material Current List of Human Services Members Backup Material Draft - Planning Board Subcommittee on Housing Charge Backup Material Lexington Planning BoardLexington Planning BoardLexington Planning BoardLexington Planning Board Residential Residential Residential Residential PolicyPolicyPolicyPolicy and and and and The Lexington We WantThe Lexington We WantThe Lexington We WantThe Lexington We Want DRAFT: Planning Board Ad-Hoc Committee for Residential Zoning and By-Law Review Appointed by: Planning Board Length of Term: Ad hoc Committee; Work Completed by 2016 Town Meeting Staff: Planning Department (as staffing transitions allow) Liaisons: Board of Selectmen Committee Charge: An ad-hoc committee of the Lexington Planning Board, the Ad-Hoc Committee for Residential Zoning and By-Law Review will assist the Planning Board in its review and analysis of residential development and zoning by: -synthesizing public comments and facilitating the public process; -analyzing residential development trends in Lexington; -conducting research and analysis on residential policy precedents and proposals; -soliciting insight from the various Town Boards and Committees with an interest in residential policy; and -drafting proposed regulations and Town Meeting articles (if and when proposed regulations are identified). The committee will conduct meetings and communications according to Open Meeting Law, MGL30A. Members: The committee shall be composed of (5) members total, (2) members from the Planning Board, the Planning Board associate member, a liaison from the Board of Selectman, and a Lexington resident recommended by the Board of Selectmen. Prior to serving as a member of this Committee, members are required to: 1. Acknowledge receipt of the Summary of the Conflict of Interest Statute. Further, to continue to serve on the Committee the member must acknowledge annually receipt of the summary of the Conflict of Interest Statute. Said summary will be provided by and acknowledged by the Town Clerk. 2. Provide evidence to the Town Clerk that the appointee has completed the on-line training requirement required by the Conflict of Interest Statute. Further, to continue to serve on the Committee, the member must acknowledge every two years completion of the on-line training requirement. AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Carl F. Valente, Town Manager ITEM NUMBER: I.11 AGENDA ITEM TITLE: Town Manager Appointment - Recreation Committee (5 min.) SUMMARY: Sandra Shaw has been with the Recreation Committee since 1991. Ms. Shaw is current with her Ethics Commission training. RECOMMENDATION / SUGGESTED MOTION: Move to approve Town Manager's reappointment of Sandra Shaw as a member of the Recreation Committee. FOLLOW-UP: Town Manager's Office will send a reappointment letter. APPROXIMATE TIME ON AGENDA: 9:00 PM ATTACHMENTS: Description Type Sandra Shaw Reappointment Application Backup Material AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.12 AGENDA ITEM TITLE: Future Meetings (5 min.) SUMMARY: You have booked regular meetings through June 29. Time to schedule meetings through the summer. Atached are calendars for June through September. Please bring your calendars and vacation schedules. RECOMMENDATION / SUGGESTED MOTION: FOLLOW-UP: Selectmen's Office APPROXIMATE TIME ON AGENDA: 9:05 PM ATTACHMENTS: Description Type Calendars for June through September Backup Material 15/14/2015 1:30 PMselectmen'sSu Mo Tu We Th Fr Sa1234567 8 9 10 11 12 1314 15 16 17 18 19 2021 22 23 24 25 26 2728 29 30June 2015Su Mo Tu We Th Fr Sa123456789101112 13 14 15 16 17 1819 20 21 22 23 24 2526 27 28 29 30 31July 2015June 2015May 31Jun 1234564:30pm Invitation to Retirement Reception for Dr. Ash (Estabrook School) - selectmen's7:00pm BOS7:00pm BOS-SC Roundtable Lex YOuth789101112137:00pm BOS (SMR)7:30pm BOS-Center Streetscape (Clarke Auditorium)Lynne Vacation14151617181920Lynne Vacation21222324252627Lynne Vacation282930Jul 12347:00pm BOS (SMR)SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 25/14/2015 1:30 PMselectmen'sSu Mo Tu We Th Fr Sa123456789101112 13 14 15 16 17 1819 20 21 22 23 24 2526 27 28 29 30 31July 2015Su Mo Tu We Th Fr Sa12345678910111213141516 17 18 19 20 21 2223 24 25 26 27 28 2930 31August 2015July 2015Jun 282930Jul 1234Holiday567891011121314151617187:00pm Summit7:00pm Summit19202122232425262728293031Aug 1SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 35/14/2015 1:30 PMselectmen'sSu Mo Tu We Th Fr Sa12345678910111213141516 17 18 19 20 21 2223 24 25 26 27 28 2930 31August 2015Su Mo Tu We Th Fr Sa12345678910111213 14 15 16 17 18 1920 21 22 23 24 25 2627 28 29 30September 2015August 2015Jul 262728293031Aug 12345678Lynne Vacation9101112131415Lynne Vacation16171819202122Lynne Vacation232425262728293031Sep 12345SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 45/14/2015 1:30 PMselectmen'sSu Mo Tu We Th Fr Sa12345678910111213 14 15 16 17 18 1920 21 22 23 24 25 2627 28 29 30September 2015Su Mo Tu We Th Fr Sa1234567891011 12 13 14 15 16 1718 19 20 21 22 23 2425 26 27 28 29 30 31October 2015September 2015Aug 3031Sep 123456789101112Holiday131415161718192021222324252627282930Oct 123SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Joe Pato ITEM NUMBER: I.13 AGENDA ITEM TITLE: Consent Agenda (5 min.) SUMMARY: Use of Battle Green - Travel Channel. Half Yard Productions requests use of the Battle Green on June 2 for filming a history travelogue series for the show "Time Traveling with Brian Unger”. Accept Terms of the Robin Elizabeth Glabe Scholarship Fund To accept the terms of the Robin Elizabeth Glabe Scholarship Fund that will be managed by the Trustees of Public Trusts. Accept Terms of the William Stetler Nichols Scholarship Fund To accept the terms of the William Stetler Nichols Scholarship Fund that will be managed by the Trustees of Public Trusts. Designate Members of the Grain Mill Alley Steering Committee as Special Municipal Employees To designate members of the Grain Mill Alley Steering Committee as Special Municipal Employees. RECOMMENDATION / SUGGESTED MOTION: Motion to approve the consent agenda. FOLLOW-UP: Selectmen's Office APPROXIMATE TIME ON AGENDA: 9:10 PM ATTACHMENTS: Description Type Travel Changel Request Backup Material Robin Elizabeth Glabe Scholarship Fund Backup Material William Stetler Nichols Scholarship Fund Backup Material Ad Hoc Grain Mill Alley Steering Committee Charge Backup Material 1 Lynne Pease From:Phil Cloutier <philc@halfyardproductions.com> Sent:Monday, May 11, 2015 1:36 PM To:selectmen's Cc:Anna Krebs Subject:Travel Channel Request to film at in Lexington and Lexington Green June 2 Follow Up Flag:Follow up Flag Status:Flagged Lynne, I’m a producer for Half Yard Productions and am following-up on a conversation we had on April 29 regarding filming in Lexington for “Time Traveling with Brian Unger”. Per our conversation, “Time Traveling with Brian Unger” is a new history travelogue series where host Brian Unger takes a small group of guests on a unique and visual tour of historic landmarks or sites. I’m writing to request permission to film along Lexington city streets and Lexington Green June 2 for a segment we’re developing on Paul Revere’s April 18-19 1775 ride. In this segment, Brian will retrace Revere’s ride with four Bostonians starting in Boston and visiting several sites along the route and ending at the Hancock- Clarke House. I was in Lexington this past week to look at potential places to film including Lexington Green and the Hancock-Clarke House, which I toured with Lexington Historical Society Director Susan Bennett. As we film there, we’d like to film B-roll of the house from sidewalks along Hancock Street. In addition to the area around Hancock-Clarke House, we also want to film general scenic B-roll of Bedford Streets and Massachusetts Avenue to introduce Lexington. At the Green, we would like to film B-roll of the green including the Captain Parker statue and Revolutionary Monument. We also plan to film a static shot -or plate- on the Green for one of the segment’s “Then and Now” graphics. Here our graphics department will match an artist’s rendering of the Battle of Lexington to the plate shot we film on the Green. We are looking to film in Lexington the morning of June 2. Filming at Hancock-Clarke House will take about two hours with no more than 30 minutes of exteriors taken from along Hancock Street sidewalks. Filming at Lexington Green will take about an hour. Our seven-person production crew works with a very light amount of gear that includes two hand-held cameras, tripod and a portable green-screen (12’x12’ green screen within a frame). The “Time Traveling” crew is very experienced filming in public areas and will not require exclusive access to the Green or sidewalks. We will also not require blocking or closing of any streets. Travel Channel has commissioned 18 episodes of “Time Traveling with Brian Unger”, which premiered April 20, 2015 and now airs Mondays at 9 PM Eastern on Travel Channel. More on the show here: http://www.travelchannel.com/shows/whats-new-on-travel-channel/articles/time-traveling-with-brian-unger Please advise if there is a city permit to complete or if the city will consider signing our location release. As we get closer to June 2, our associate producer and on-site contact Anna Krebs (cc'd) will be in touch with you to discuss logistics and schedule. In the meantime, please email or call me at 240-223-3424. Thank you for your time and consideration! 2 Best regards, Philip R. Cloutier _________________ Philip R. Cloutier Story Producer, Half Yard Productions 4922 Fairmont Avenue, Suite 300 Bethesda, MD 20814 o) 240.223.3424 m) 323.810.6369 f) 240.223.3456 Skype: philip.cloutier philc@halfyardproductions.com halfyardproductions.com AD HOC GRAIN MILL ALLEY STEERING COMMITTEE Members: Seven Appointed by: Members and Chair Appointed by Board of Selectmen Length of Term: Work Completed within One Year Staff: Economic Development Director Liaisons: Selectmen, Historic Districts Commission, Bank of America and Office Condo Association Description. The Ad hoc Grain Mill Alley Steering Committee (GMASC) shall work to develop a conceptual design, supported by the abutting property owners, which enhances the alley’s aesthetic, offers new utility, and improves the safe passage of pedestrians between the bikeway and the Center’s retail corridor. To that end, the Committee shall work with the property owners at 1761 and 1775 Mass Avenue and the Historic Districts Commission (liaisons to the Committee) to develop an agreed upon concept design and make a final recommendation to the Board of Selectmen, preferably by November 2015 such that final design and construction funding can be included in the FY17 capital budget request. The Grain Mill Alley Steering Committee will: • Present to and incorporate recommendations from the Historic Districts Commission. • Decide on a final landscape design recommendation for that area that addresses the three sections of the alley: 1) the intersection at the bikeway, 2) the area between the two buildings, and 3) public right of way at Mass Avenue (in consultation with the DPW/Center Streetscape project). • Support installment of temporary street furniture, objects, and/or lighting to gauge the use before and after the installation and inform the final recommendation. Criteria for Membership. Members shall include: 1. Center Committee 2. Planning Board Member 3. Design Advisory Committee 4. Arts Community 5. Youth of the Community 6. Tourism/Visitor Community Prior to serving as a member of this Committee, appointees are required to: 1. Acknowledge receipt of the Summary of the Conflict of Interest Statute. Further, to continue to serve on the Committee the member must acknowledge annually receipt of the summary of the Conflict of Interest Statute. Said summary will be provided by and acknowledged by the Town Clerk. 2. Provide evidence to the Town Clerk that the appointee has completed the on-line training requirement required by the Conflict of Interest Statute. Further, to continue to serve on the Committee, the member must acknowledge every two years completion of the on-line training requirement. Ref: Charge adopted by the Board of Selectmen on May 11, 2015. Board of Selectmen voted to designate as Special Municipal Employees on May 18, 2015. AGENDA ITEM SUMMARY LEXINGTON BOARD OF SELECTMEN MEETING DATE: 5/18/2015 PRESENTER: Carl F. Valente, Town Manager ITEM NUMBER: E.1 AGENDA ITEM TITLE: Executive Session: Exemption 6 - Consider Purchase, Exchange, Lease or Value of Real Property SUMMARY: Updates on: Potential site(s) for main Fire Station• Proposed change to Munroe Center for the Arts License Agreement• RECOMMENDATION / SUGGESTED MOTION: NA FOLLOW-UP: APPROXIMATE TIME ON AGENDA: 9:15 PM