HomeMy WebLinkAbout2015-03-23-AC-STM-rpt APPROPRIATION COMMITTEE
TOWN OF LEXINGTON
REPORT TO THE MARCH 2015
SPECIAL TOWN MEETING # 1
& -
SPECIAL TOWN MEETING #2
Released March 16, 2015
APPROPRIATION COMMITTEE MEMBERS
Glenn P. Parker, Chair • John Bartenstein, Vice Chair/Secretary
Robert N. Addelson (ex-officio; non-voting) • Mollie Garberg • Alan Levine • Beth Masterman
Susan McLeish • Eric Michelson • Richard Neumeier • Andrei Radulescu-Banu
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Contents
Summary of Warrant Article Recommendations ii
Introduction 2
Warrant Article Analysis and Recommendations 3
Special Town Meeting#1 3
Article 2: Appropriate for School Facilities Capital Projects 3
Special Town Meeting#2 7
Article 2: Pump Station Repairs 7
Article 3: Appropriate for Purchase of Fire Engine 7
Article 4: Appropriate for Cary Memorial Building Sidewalk Enhancement 8
Article 5: Amend FY2015 Operating, Enterprise and CPA Budgets 9
Article 6: Appropriate for Authorized Capital Improvements 9
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Summary of Warrant Article Recommendations
Abbreviations
EF Enterprise Fund CPA Community Preservation Act
GF General Fund DSSF Debt Service Stabilization Fund
RE Retained Earnings IP A motion to Indefinitely Postpone is expected
RF Revolving Fund TDM Traffic Demand Management
Special Town Meeting #1
Ar- Title Funds Funding Committee
tide Requested Source Recommendation
2 Appropriate for School Facilities $4,080,000 GF Debt Approve (9-0)
Capital Projects
Special Town Meeting #2
Ar- Title Funds Funding Committee
tide Requested Source Recommendation
2 Pump Station Repairs $750,000 Wastewater EF Approve (9-0)
Retained Earnings
3 Appropriate for Purchase of Fire $500,000 GF Approve (9-0)
Engine
4 Appropriate for Cary Memorial $194,200 CPA Pending
Building Sidewalk Enhancement
Amend FY2015 Operating, $31,900 GF
5 Enterprise and CPA Budgets $3,850 Parking Meter Fund Approve (9-0)
6 Appropriate for Authorized $350,000 GF Approve (9-0)
Capital Improvements
ii
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Introduction
Starting on March 23, 2015, Town Meeting will begin deliberation on three Warrants. In addition to the
Warrant for the 2015 Annual Town Meeting, there are Warrants for two Special Town Meetings,which
are referred to herein as the March 2015 Special Town Meeting#1 and March 2015 Special Town Meet-
ing#2. This report includes the Committee's advice and recommendations regarding the Warrant Articles
for the Special Town Meetings.
The Committee will publish a separate report regarding the Warrant Articles for the 2015 Annual Town
Meeting on March 23, 2015, one week prior to the earliest session at which they could be taken up in
Town Meeting.
This report is distributed to the members of Town Meeting as a printed document and as an electronic
document via the Town website. It is published a week prior to the session when the Articles are antici-
pated to be taken up in Town Meeting.
Acknowledgements
The content of this report, except where otherwise noted, was researched, written and edited by members
of the Committee with support from Town staff. Our Committee has the pleasure and the privilege of
working with Town Manager, Carl Valente; Assistant Town Manager for Finance, Rob Addelson; our
Budget Officer, Patricia Moore; the Capital Expenditures Committee; the Community Preservation
Committee; the School Committee; the Permanent Building Committee; Superintendent of Schools,
Dr. Paul Ash; Assistant Superintendent for Finance and Operations, Mary Ellen Dunn; and the Board of
Selectmen. We thank the municipal and school staff, Town officials, boards and volunteers who have
contributed time and expertise to help us prepare this report. Last but not least, we thank Sara Arnold,
who records and prepares the minutes for our meetings.
2
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Warrant Article Analysis and Recommendations
Special Town Meeting #1
The Warrant for the March 2015 Special Town Meeting #1 contains a single financial article. This was
done so that the Special Town Meeting can be dissolved following a vote on the motion, allowing the
Town to proceed quickly if the motion is approved.
In the event that Town Meeting requires additional time to debate this Article, the Moderator may choose
to suspend Special Town Meeting#1 in order to take up Articles in Special Town Meeting#2,which also
has matters requiring timely action(see below).
Article 2: Appropriate for School Funds Funding Committee
Requested Source Recommendation
Facilities Capital Projects
$4,080,000 GF Debt Approve (9-0)
Background
Recent enrollment growth in the Lexington Public Schools (LPS) has created overcrowding throughout
the system. In response, the School Committee and administration appointed the Enrollment Working
Group (EWG), and asked it to study the LPS enrollment history and to project enrollment numbers for the
next five or more years. It is now clear that the current high enrollments and the likely continuing growth
over the next few years require the Town to increase the capacity of its school facilities to restore flexibil-
ity and avoid unacceptable levels of overcrowding.
In June 2014, a Special Town Meeting appropriated $250,000 for school facility master planning. The
School Committee and School Administration then appointed the Ad hoc School Master Planning
Committee (AhSMPC). The AhSMPC and Public Facilities Department retained an architectural firm,
Symmes, Maini & McKee Associates (SMMA), to evaluate school facilities and formulate a school
facility master plan that addresses the enrollment growth and other facility issues.
SMMA and the AhSMPC evaluated the capacities of all the school buildings currently in use, and deliv-
ered a list of several options for addressing the perceived needs. The School Committee voted to pursue
"Option 9",which had an estimated cost of$119 million(see reference 2).
After a series of summit meetings with the Board of Selectmen, Appropriation Committee, Capital Ex-
penditures Committee, and Permanent Building Committee, a consensus plan evolving out of Option 9
was developed, with a preliminary estimated cost of$111 million. The consensus plan differs from Op-
tion 9 in a few significant areas, in particular the preference for pre-fabricated classrooms at Fiske, and
the assumption that a brick and mortar extension at Harrington will only be considered if construction of a
new Hastings is not feasible, or if we learn of other reasons that additional classrooms are required. This
consensus plan represents an agreement between all these committees about the pressing need to initiate a
large interconnected group of projects in response to growing enrollment needs, and to continue studying
and refining the school capital plan.
As part of that consensus, and apart from the work proposed in this request, the School Committee has
agreed to study redistricting options that could lead to policy changes before new classrooms are availa-
ble, even though redistricting alone is unlikely to solve the overall capacity issues projected by the EWG.
3
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
References
The reports below and many others relevant to the present article may be found on the Lexington Public
Schools web site at: http://lps.lexingtonma.org/Page/5740
1. Five-year Enrollment Forecasts for Lexington Public Schools: FY2015-FY2020 Report of the En-
rollment Working Group, December 2014:
http://lps.lexingtonma.org/cros/lib2/MA01001631/Centricity/Domain/565/-
EWGReport3Odec14.pdf
2. "Option 9: Presentation to the School Committee",by SMMA Jan 13, 2015:
http://lps.lexingtonma.org/cros/lib2/MA01001631/Centricity/Domain/1191/-
l3Janl5SCOption9Discussions.pdf
3. "Final Phase 1 Capacity Report", SMMA,November 19, 2014:
http://lps.lexingtonma.org/cros/lib2/MA01001631/Centricity/Domain/1191/-
Fi nal Capacityrpr20Novl4.pdf
4. "Final Phase II Master Plan-Elementary Schools Short and Long Term Options Study", SMMA,
November 10, 2014:
http://lps.lexingtonma.org/cros/lib2/MA01001631/Centricity/Domain/1191/-
lONOVl4Ph2ESShortLongTermOptsFi nal .pdf
5. "Master Plan Options Comparison- Option 8",by the SMMA (Dec 18, 2014):
http://lps.lexingtonma.org/cros/lib2/MA01001631/Centricity/Domain/1191/-
l8decl4DraftOpti ons.pdf
Proposed Work
The School Committee has requested $4,080,000 for a combination of feasibility studies, design devel-
opment work, and preparation of construction documents to execute, or in some cases to refine, the school
capital projects in the consensus plan. The initial work proposed in this request will establish the basis for
a more detailed discussion of the school capital plan in the summer and fall of 2015. The study results are
critical for policy makers to have a fully-informed debate on the construction components of the capital
plan.
The details of these projects are subject to change based on the results of the work funded by this request.
The initial proposed work and preliminary estimated costs of each project break down as follows. These
estimates from SMMA were derived using a simple cost formula plus a 20% contingency. They convey
the order of magnitude for the proposals,not a detailed design and engineering analysis.
Total
School Project Description Estimated Costs
(preliminary)
Bowman 2 new classrooms, 1 new music room (pre-fabricated) $3.1 million
Bridge 2 new classrooms, 1 new music room (pre-fabricated) $3.7 million
Fiske 2 new classrooms (pre-fabricated) $3.7 million
Pre-K Standalone building (new or renovated), or extension to Hastings or $10.2 million
Harrington
Harrington Conversion of Pre-K space to K-5 classrooms $0.3 million
Hastings New building(without MSBA funding) $61.9 million
Clarke 5 new pre-fabricated classrooms,new toilets $4.6 million
Diamond 8 new pre-fabricated classrooms, 16 additional brick&mortar $24.0 million
classrooms,remove existing modular classrooms, cafeteria additions
Grand Total $111.5 million
The current request for $4.08 million would fund various components of the plan to different stages of
completion. Approximately one third of the request would fund an initial set of investigative tasks, each
4
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
with potential follow-up tasks to be performed contingent on recommendations from the School Commit-
tee and formal approval by the Selectmen. This Committee, the Capital Expenditures Committee, the
Permanent Building Committee, the Department of Public Facilities, and the public will be consulted dur-
ing this approval process. This Committee will make recommendations on these proposals focusing on
two criteria: whether the information is sufficient for making reasonable decisions on the school capital
program, and whether the individual project components are reasonably likely to move forward.
School Project Initial Follow-up Project
Phase Phase Total
Bowman $86,000 $221,000 $307,000
Bridge $93,000 $250,000 $343,000
Fiske $93,000 $250,000 $343,000
Pre—K $115,000 $297,000 $412,000
Harrington $35,000 $43,000 $78,000
Hastings $390,000 $530,000 $920,000
Clarke $111,000 $307,000 $418,000
Diamond,bricks and mortar $316,000 $380,000 $696,000
Diamond,pre-fabricated $130,000 $388,000 $518,000
Other- Fiske bricks and mortar, School Admin. Bldg. $45,000 $0 $45,000
Grand Total $1,414,000 $2,666,000 $4,080,000
Longer Term Financial Environment
The school facilities projects in the present plan are not the only large capital projects that the Town is
likely to need in the next five to ten years. Additional likely municipal capital projects are listed in the
following table, together with rough estimates of cost. When added on to the total anticipated costs for the
projects in the current request, this represents a significant future burden on the Town.
Total
Project Description Estimated Costs
(preliminary)
Clarke circulation/parking $2.6 million
Middle school science &performing arts $3.3 million
Diamond energy improvements $3.8 million
LHS heating system repairs $10.8 million
Police Station $16.0 million
Fire Station (includes est. $5 million land purchase) $23.0 million
Total $59.5 million
Many of these projects will require approval from voters via debt exclusion referendum. If all of these
projects are carried out in the coming decade, the high level of the debt service could have major financial
implications such as:
• Significantly higher property tax bills over the next 10 years.
• A significant deviation from the financial goal of keeping excluded debt service at 5% of the non-
exempt tax bill. Prior to any mitigation using the Capital Debt Stabilization Fund, the ratio could
peak at 13% in 2021 and then fall back to 5% in 2030.
• Partial or complete depletion of the Capital Projects Stabilization Fund and/or the main Stabiliza-
tion("Rainy Day") Fund.
5
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
• A call for short- or long-term reduction of the CPA surcharge to offset the impact on tax payers of
the costs of these projects. Any change to the CPA surcharge would require the approval of Town
Meeting and the voters in a referendum, and would be required to satisfy existing debt obligations
on CPA funds.
• Issuance of bonds with terms longer than 20 years, exceeding the maximum term for which bonds
have traditionally been issued by the Town.
• Competition for limited resources when planning major capital projects during the coming decade
and beyond, including renovation or replacement of Lexington High School.
Financial Aspects of the Present Request
In our view, funding this request is a necessary first step,but there is no guarantee that these projects will
proceed to completion as proposed. Significant future funding will require appropriation by Town Meet-
ing. As noted above, several projects will also require voter approval in a debt exclusion referendum.
Per advice from Bond Counsel, the term of bond financing is limited to 5 years for expenses on projects
that do not proceed to construction, and those expenses will not qualify under a debt exemption. Expenses
on projects that ultimately proceed to construction can be financed by bonds with terms of 20+ years.
This means the expenses for feasibility studies and design development must be carefully tracked to make
prudent and qualified use of bond financing.
One or more Bond Anticipation Notes (BANs) will be issued to cover the appropriation, giving the Town
a short-term interest-only loan that will be serviced within the tax levy. For projects that are eventually
approved in debt exclusion referenda, the BANs will be converted into bonds with a terms of 20 or more
years. Borrowing for projects that do not result in construction is limited to 5 years and will continue to
be managed as within-levy debt.
The lurking risk is that, if the Town spends a significant portion of this $4.08 million on projects that do
not proceed to construction, the Town will then have to finance that portion within a 5-year period. There-
fore, it behooves us to start from a well-considered list of projects in the first place, and to limit spending
on those that are not expected to proceed to construction.
Committee Position
At a joint meeting held on February 25, 2015, this Committee, along with the School Committee, Board
of Selectmen, and Capital Expenditures Committee, endorsed a consensus statement of support for the
request presented by the Board of Selectmen.
This request will allow the Town to research key issues prior to making decisions about which projects to
pursue, when they should be initiated, and how they should be financed. These issues include basic feasi-
bility, cost estimates, timing, and scheduling factors for each phase of the proposed projects. This infor-
mation is necessary for the Town to proceed promptly and confidently with the school capital projects.
The Committee recommends approval of this request(9-0).
6
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Special Town Meeting #2
The March Special Town Meeting #2 contains five financial articles to fund capital projects that require
prompt action.
Article 2: Pump Station Repairs Funds Funding Committee
Requested Source Recommendation
$750,000 Wastewater EF Approve (9-0)
Retained Earnings
This article seeks to apply retained earnings of the Wastewater Enterprise Fund(from a current balance of
approximately $2,000,000) for the purpose of making extraordinary repairs to the main wastewater pump
station on Bedford Street and related sewerage systems. In the early 1990s a one-mile-long 24-inch diam-
eter pipeline, also known as a force main, was installed to carry wastewater uphill from the pump station
located in the Rt. 128-Bedford St. interchange to a point located near Hamilton Road. The wastewater
then flows downhill to Deer Island.
Beginning in September 2014, the Town received complaints from neighbors on Gleason Road about
noise and rumblings coming from the street. Neighbors stated that it sounded like a distant cannon. In ad-
dition neighbors felt vibration from the ground every 23 to 24 minutes, 24 hours a day.
The purpose of this article is to upgrade the pumps at the main sewer pump station on Bedford Street and
thereby mitigate the force main vibrations.
The Committee recommends approval of this request(9-0).
Article 3: Appropriate for Purchase of Funds Funding Committee
Requested Source Recommendation
Fire Engine
$500,000 GF Approve (9-0)
The Fire Department seeks $500,000 for a pumper to replace Engine 2. This appropriation has been
placed on the Special Town Meeting Warrant because the Town wishes to purchase this fire engine under
the advantageous terms of the Massachusetts group purchasing contract for fire equipment, which expires
at the end of FY2015.
The Fire Department's Engine 2 was purchased in 2010 for approximately $500,000, but it became the
subject of litigation and was ultimately returned to the manufacturer. The department normally runs four
pumpers, allowing the Town to meet its mutual aid responsibilities to surrounding towns, and preserving
the flexibility to send equipment out for service and certification. As a workaround to make up for the
loss of Engine 2, the department has been borrowing a ready-to-be-retired pumper from another commu-
nity when available. The department has been unable to send out its most recently purchased engine for
important warranty work.
The town recently settled legal action concerning Engine 2 and will apply $500,000 of the $575,000 re-
ceived to settle the litigation towards the cost of a new engine. Once this article is approved, a new fire
engine can be ordered with an anticipated delivery time of 5-8 months.
The settlement money has been received and deposited into the General Fund. Due to municipal finance
regulations it will not be available for appropriation until after the close of FY2015 when the Town's Free
Cash has been certified by the State Department of Revenue. The engine will be purchased using a Bond
7
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Anticipation Note (short-term borrowing) and the settlement money will pay off the BAN in February
2016 when the note is due.
The Committee recommends approval of this request(9-0).
Article 4: Appropriate for Cary Funds Funding Committee
Requested Source Recommendation
Memorial Building Sidewalk
Enhancement $194,200 CPA Pending
The Cary Memorial Building was dedicated in 1928 and it has served Lexington for 86 years.
In 2010 Town Meeting appropriated under Article 8(i) $60,000 in Community Preservation funds to per-
form a comprehensive review of building systems,building and life safety codes, and theatrical and func-
tional capabilities. The evaluation concluded that improvements were needed in several areas:
• accessibility
• support spaces
• structural
• electrical
• mechanical
• plumbing
• stage
• acoustical
• audio visual improvements
The Board of Selectmen formed the Ad hoc Cary Memorial Building Program Committee (AhCMBPC),
which reviewed the recommended scope of work and reported to the Selectmen on January 13, 2013. At
the 2013 Annual Town Meeting, $550,000 from the Community Preservation Fund was appropriated un-
der Article 8(c) to continue the design process and begin the development of construction documents.
In June 2013, the Selectmen appointed the Ad hoc Cary Memorial Building Renovation Design Commit-
tee (AhCMBRDC) to oversee the design and construction documents and to oversee the implementation
of the recommended design. The AhCMBRDC met monthly and on December 16, 2013 the Board of Se-
lectmen supported the committee's recommendation of bringing the project to the Community Preserva-
tion Committee at a revised cost of$8,677,400. The project was approved at the Special Town Meeting in
March 2014.
The design of the sidewalk had not been determined at the time of the Special Town Meeting in 2014. In
November, 2014, the Board of Selectmen were presented with 2 proposals for material for the sidewalk—
a cement concrete sidewalk/walkway with a brick band at a proposed construction cost of$131,000 or an
all-brick sidewalk and walkway at a proposed construction cost of$215,000. In December, the Board of
Selectmen voted to accept a design proposal for a cement sidewalk with a brick border. Of note, the
Commission on Disability also supports the use of these materials. It is intended that this design become
the design standard for sidewalks in Lexington Center.
The Historic Districts Commission reviewed the proposal and further refined the design to include granite
pavers in the handicapped vehicle unloading zone. The change in materials increased the anticipated pro-
ject cost by approximately $32,000, and is included in the requested amount.
A total of$194,200 (inclusive of estimated design, construction and contingency costs) is requested from
the Community Preservation Fund to fund this sidewalk along with two additional lamp posts, as ap-
proved by the Board of Selectmen. If approved, the sidewalk will be constructed in the spring of 2015.
The Committee has not taken a position on this Article.
8
APPROPRIATION COMMITTEE-MARCH 2015 STM#1&STM#2
Article 5: Amend FY2015 Operating, Funds Funding Committee
Requested Source Recommendation
Enterprise and CPA Budgets
$31,900 GF Approve (9-0)
$3,850 Parking Meter Fund
The first part of this request would reduce the FY2015 Salary Adjustment Account by $31,900, and in-
crease the FY2015 Recreation Enterprise Fund by the same amount. The funds will cover salary expenses
during FY2015 for a new Community Center Director starting work in April, and a new Community Cen-
ter Office Manager starting work in May. Both of these positions must be filled prior to the opening of the
Community Center in the spring of 2015. These salary expenses for FY2015 are coming from the Operat-
ing Budget to expedite the upcoming opening of the Community Center. Starting in FY2016, salaries for
both positions will be fully incorporated into the Recreation Enterprise Fund budget.
The second part of this request would increase the Police Department budget by $3,850. The funds would
be used to lease 20 parking spaces at the St. Brigid's Parish parking lot, thus increasing the capacity of the
downtown permit parking program. The costs are covered by the Parking Meter Fund,which is funded by
fees paid for downtown parking permits.
The Committee recommends approval of this request(9-0).
Article 6: Appropriate for Authorized Funds Funding Committee
Requested Source Recommendation
Capital Improvements
$350,000 GF Debt Approve (9-0)
Under Article 4 of the November 2013 Special Town Meeting, $7,700,000 was appropriated for the de-
sign and construction of modular (pre-fabricated) classrooms at Lexington High School. Under Article
22(b) of the 2014 Annual Town Meeting the original appropriation was raised to $8,195,000. This request
would increase the appropriation by $350,000, to $8,545,000. In combination with the recent $150,000
Reserve Fund transfer for this project, the funding total will be $8,695,000.
The project was organized as two phases, and Phase 1 was completed last year. The Town received two
bids in response to the RFP for Phase 2, the lower of which was $500,000 above the budgeted amount.
In order to allow the project to proceed on schedule for a September 2015 completion date, $350,000 in
funds previously allocated under the original appropriation for furniture, fittings and equipment in Phase
2 was redirected to make up part of the Phase 2 shortfall. Another $150,000 from the Reserve Fund was
authorized by this Committee to fully fund the shortfall, thus allowing work to proceed.
This request for $350,000 will restore the funds needed for furniture, fittings and equipment in Phase 2. It
will be offset by a matching reduction in the Superintendent's FY2016 capital project request for "Middle
School Space Mining" from $1,024,000 to $674,000,resulting in no net increase in the capital budget.
The Committee recommends approval of this request(9-0).
9