Minutes of the
Lexington Capital Expenditures Committee (CEC) Meeting
January 30, 2015
Town Office Building, Reed Room; 8:00 ..
Location and Time:
AM
Jill Hai, Chair; David Kanter, Vice-Chair & Clerk; Elizabeth Barnett;
Members Present:
Rod Cole; Wendy Manz
None
Members Absent:
Judy Crocker, Member, School Committee, and Co-Chair, Ad hoc School
Others Present:
Master Planning Committee (AhSMPC); Jon Himmel, Co-Chair, Permanent Building
Committee, and Member, AhSMPC; Sara Arnold, Recording Secretary
Documents Presented:
Notice of Public Meeting/Agenda for January 30, 2015
A Recommended Funding Approach with Flexibility that helps Achieve the Currently
Slated School Projects; prepared by Mr. Himmel, January 28, 2015
Draft #3 Minutes of the CEC Meeting, January 13, 2015 (Distributed by Mr. KanterÈs
e-mail to the other CEC Members and Ms. Arnold, January 24, 2015 3:01 ..)
PM
Draft Minutes of the CEC Meetings, January 15 & 22, 2015 (Distributed by
Mr. KanterÈs e-mail to the other CEC Members and Ms. Arnold, January 24, 2015
3:47 ..)
PM
Ms. Hai called the meeting to order at 8:02 ..
Call to Order:
AM
The following votes on Minutes were taken:
Approval of Minutes:
A Motion was made and seconded to approve the Draft #3 Minutes of the CEC
Meeting, January 13, 2015, as presented.
Vote: 5Ã0
A Motion was made and seconded to approve the Draft Minutes of the CEC Meeting
January 15, 2015, as presented.
Vote: 3Ã0Ã2 \[Ms. Hai and Mr. Cole abstained as
they were not at the meeting.\]
A Motion was made and seconded to approve the Draft Minutes of the CEC Meeting,
January 22, 2015, with the changes as discussed.
Vote: 4Ã0Ã1 \[Mr. Cole abstained
as he was not at the meeting.\]
Capital Projects in the TownÈs FY2016ÃFY20 Capital Program:
Wright Farm Parcel 2 Purchase using Community Preservation Act (CPA) Funds:
Mr. Kanter reported that the Community Preservation Committee (CPC) voted unanimously
to support the purchase of a portion of Wright Farm \[1.00¯-acre ÅParcel 2Æ\] for $520,000,
consistent with the TownÈs 180-day first-right-of-refusal agreement to pay $500,000 plus
inflation when Parcel 2 became available. This agreement was negotiated at the time
\[2012\] the Town purchased ÅParcel 1Æ \[12.60¯-acres\]. LexHAB is interested in creating
affordable housing using the house and garage that are on Parcel 2; the plan includes
moving the garage to the other side of the house. The balance of Parcel 2, which includes a
barn, will be used for open space. The division between housing and open space has not
yet been identified. The total cost, including funding for LexHAB work and ancillary costs, is
$755,000. Ms. Barnett expressed concern about using this location for a single family unit.
Page 1 of 5
Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting
January 30, 2015
Lexington Community Center (LCC) Preservation Restriction Endowment Funding using
Mr. Kanter reported that the CPC voted unanimously to support a $25,000
CPA Funds:
payment to the Lexington Historical Society to fund an endowment for the SocietyÈs
expenses for holding the historic-preservation restriction for the LCC. The funding is
expected to be sufficient to cover those expenses over the next five to ten years. It was
noted that this is commonly done with historic restrictions, and the Town has the right to
audit their expenditures. When the endowmentÈs balance has been substantially
diminished, the Society (or any subsequently assigned holder) would be expected to ask
the Town to replenish the endowment.
Member Concerns and Liaison Updates:
Mr. Cole
School Department Expansion Projects to Address School Capacity Issues:
reported on theAhSMPCÈsmeetingheld earlier in the day. Heincluded the following points:
Symmes Maini & McKee Associates (SMMA), which was hired by the School
Department to evaluate the impact of enrollment (current and projected) on
LexingtonÈs school buildings and assess the feasibility of various building options
including potential cost, is finalizing its Phase III report.
Mr. Himmel provided the AhSMPC with a table that identified a potential process for
pursuing the next steps needed to determine which options identified by SMMA
should be pursued.
The AhSMPC voted to request that the School Committee dissolve the committee.
Mr. Himmel provided the Committee with details on the analysis he has done regarding
a possible funding approach which retains flexibility as more information is known about
the costs and timing of the various capital-improvement components being considered
to address the School DistrictÈs lack of adequate capacityÄboth currently and, more
significantly, as projected by the SuperintendentÈs Enrollment Working Group (EWG) in
its report. \[ÅFive-year Enrollment Forecasts for the Lexington Public Schools:
FY2015-FY2020Æ, dated December 2014.\] His comments included:
The Town should embark on a system-wide approach for evaluating the space
needs required to accommodate the current and projected school enrollment. This is
in contrast to previous efforts that focused on one school project at a time.
SMMA was hired by the Town to collect and present data on Town-wide existing
conditions in the schools, evaluate the broad needs based on current and projected
enrollment, and assess the feasibility and cost of various building options This
provided details on the space currently available for educational programs in the
schools and an overarching consultantÈs perspective on the anticipated space needs
with conceptual options for addressing the projected future enrollment.
SMMA used a consultant cost estimator to create preliminary cost estimates for
potential prefabricated and Åbricks and mortarÆ construction projects; that process is
based only on space parameters. SMMA took their consultantÈs estimates and
added soft costs, etc., and thus provided Lexington with Project costs. These project
costs were estimated for a current bid and then escalated to a Summer 2016 bid
time frame.
Page 2 of 5
Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting
January 30, 2015
The Town doesnÈt know if the Massachusetts School Building Authority (MSBA) will
help fund a project to replace/rebuild the Maria Hastings Elementary School during
itÈs next cycle at the end of this calendar year. If Hastings becomes an
MSBA-approved project, the Town will likely be required to conduct a formal
feasibility study following MSBA guidelines.
Both middle schools and all of the elementary schools except the Joseph Estabrook
Elementary School need further evaluation to determine their suitability for
expansion, renovation, and/or rebuilding projects. In other words, it is time for more
in-depth study and the development of schematic designs to understand which
projects should move forward. Even if a site, such as the location of the Fiske
Elementary School, is currently considered too challenging, it should still be
evaluated, because at some point in time, it may be necessary to go back and re-
look at the different options. Hastings should also be evaluated even though MSBA
may eventually invite the project to be included in its Eligibility Period, and may or
may not require readdressing some elements already looked at by the Town. That
cost differential should not slow the process necessary to deliver new classrooms to
address the current overcrowding and projected overcrowding.
Mr. Himmel noted that there appears to be general consensus among those involved in
these issues, and most notably the Superintendent, that additional classroom space is
needed no later than the fall of 2016. Working backwards, and using the handout that
he had used at the AhSMPC meeting, he demonstrated a need for a spring 2015
Special Town Meeting and his conclusion it should support $4,080,000 to fund further
studies, schematic-level design, design development, construction documents, and
biddingÄwith the level of work tailored to each of the schools involved and the projected
timelines to bring on the additional capacity at each school. He referred to the chart in
his handout that shows an estimation of the cost of how much design work is anticipated
under this funding request. That dollar amount does not include the estimated $980,000
for standard modules at Fiske by this fallÄ$842,000 to bring them on line and $138,000
for subsequent, annual, rental charges. He supports appropriate overview of when itÈs
reasonable to authorize the use of the already-appropriated, later-stage, funds because
the needs may shift as more information becomes available; but if the funds arenÈt
available, projects will be delayed and the schools will not have the needed capacity,
assuming enrollment increases as projected.
Ms. Crocker identified three aspects of the equation that need to be included as part of
the process:
How to accommodate the projected increasing enrollment at the two middle schools.
Where to locate a pre-kindergarten facility. Options currently include the Harrington
Elementary School site, the Hasting site or another location such as the Laconia
Street parcel. If on a site with an elementary school, it needs to be determined
whether the pre-kindergarten program is in a free-standing facility or part of the
elementary school.
The appropriate size for a new Hastings.
Page 3 of 5
Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting
January 30, 2015
There was discussion about what additional information and answers the School
Committee needs to provide to support the request. Comments included the following:
There needs to be a dynamic display of when added capacity would come on line
that demonstrates how it sequentially meets the anticipated needs considering both
the by-school current enrollment and whatever projected enrollment growth number
is being used.
It is not enough to just show the additional space needed for the EWGÈs projections
because there is already overcrowding in some schools.
Although the EWGÈs projections are Town-wide numbers, it would be helpful to see
what has happened for the last five years at each school, which may help us gauge
what will happen going forward. Because no one knows which schools will be
attended by the projected students, error bands wouldbe necessary.
The administrative options (e.g., redistricting, revised educational processes, change
in class sizes, temporary Åon cartÆ services, etc.) to address overcrowding need to
be addressed with specificity as to why discounted or, if recommended to be
implemented, what is planned. That should make clear why even any or some
delayed implementation of new, additional, capacity isnÈt deemed acceptable.
There needs be a clear understanding of the work done by SMMA and how this
differs from the work that still needs to be done.
Credibility with Town Meeting and the public is critical. Effort must be taken to
ensure that what is presented, to the extent possible, is heavy on graphical displays
so voluminous textual material is not being relied upon to make the case to the Town
Meeting members.
Mr. Himmel continued with comments and suggestions that included the following:
All of the SMMA projects are conceptual; schematics are the next step. Everything
gets Åfleshed outÆ to a greater extent in the next phase.
The Town needs to hire an OwnerÈs Project Manager to augment the Department of
Public Facilities staff on this endeavor. This may cost $280,000 for nine months, but
this is critical to having an efficient and effective process.
The Town needs to issue a Request for Proposals and start the project on this
st
April 1 with a program study of the elementary and middle schools (including
Hastings).
In this July there should be a summit of decision makers to review all the material
and determine next steps, including the release of already-appropriated funds.
The above schedule would be tight but, if adhered to, it would be possible to have all
the necessary information completed in time for a Special Town Meeting this
November to address the next funding request needed to keep progress on
schedule.
Page 4 of 5
Minutes of the Lexington Capital Expenditures Committee (CEC) Meeting
January 30, 2015
It may be a painful process going to Town Meeting for over $4.0 million, but this is
important for efficiency and meeting the space needs of the anticipated student
population.
It is necessary to include all of the projects identified in the Town-Wide Facilities
Master Plan when discussing the building needs in the Town; these include a new
Fire Headquarters and Police Headquarters.
No vote or position was taken by the Committee.
Ms. Hai reported that Joe Pato, Chair, BoS, is planning a
Board of Selectmen (BoS):
meeting with two members of each committee that attended the Budget Summits to review
plans for Town Meeting presentations. She and Mr. Cole will be our participants in that
meeting.
Ms. Hai reported that Carl Valente, Town Manager, is interested in meeting
Next Meeting:
with this Committee to present additional information that is available relating to some of
the proposed FY2016 capital projects.
A Motion was made and seconded at 10:00 .. to adjourn.
Adjourn:Vote: 5Ã0
AM
These Minutes were approved by the CEC at its meeting on February 24, 2015.