HomeMy WebLinkAbout2014-10-08-LHA-min LEXINGTON HOUSING AUTHORITY
REGULAR MEETING—OCTOBER 8, 2014
MINUTES
1 ROLL CALL
The meeting was called to order by Vice Chairman Nicholas Santosuosso at 6 05
P.M
MEMBERS PRESENT MEMBERS ABSENT OTHERS PRESENT
Nicholas Santosuosso Leo P McSweeney Steve Keane
Weidong Wang Melinda Walker
Robert D Peters
2 PUBLIC COMMENT
There was no public comment offered at this meeting.
3 MINUTES
Approval of Minutes of Regular Meeting of September 10, 2014
Upon a motion by Robert D Peters and seconded by Weidong Wang, the Board voted
to approve the Minutes of the Regular Meeting of September 10, 2014, all members
having received copies The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
4 BILLS & CHECKS
Approval of Bills and Checks paid in September 2014
September 2014
667-C/705-2 Check Number 7173
REVOLVING FUND Check Numbers 12771 through 12831
067-1 & 3 Check Number 4214
689-C MANAGEMENT Check Number 2200
PARKER MANOR Check Number 1989
BEDFORD STREET Check Number 1185
MRVP VOUCHER PROGRAM Check Numbers 2926 through 2928
SECTION 8 Check Numbers 16918 through 16942
Upon a motion by Weidong Wang and seconded by Robert D Peters, the Board
voted to accept the Bills and Checks as presented for September 2014 The roll call
vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
5 EXECUTIVE DIRECTOR'S REPORT
A Photo for Annual Town Report
Dave Tabelmg was in attendance to take the photo
B LHA and Parker Financials
The Board reviewed the September LHA financials and the August Parker
financials
Upon a motion by Robert D Peters and seconded by Weidong Wang, the Board
voted to accept September LHA financials The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
C State Audit final report
The final audit report has been released. The PILOT was over accrued and has
been corrected by Jenna. Steve was also interviewed for the Lexington
Minuteman newspaper article
D NAHRO Fall Conference and Ad
The NAHRO Fall Conference is being held in Plymouth on November 16th_18th
Steve is attending one day If anyone is interested in attending, please contact
Kathy so she can register you. Annually the housing authority places a full page
ad in the booklet.
Upon a motion by Robert D Peters and seconded by Weidong Wang, the Board
voted to place a full page ad in the NAHRO Fall Conference booklet in the amount
of$100 00 The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
E Maintenance position/snow removal/OSHA Training
A maintenance staff member has left to pursue another job Steve spoke to Jenna
today regarding the open position. Steve would like to contract out snow removal
for Vynebrooke Village The maintenance staff can do snow removal at the other
villages If this does not work out, the position will be advertised. Two
maintenance staff members attended an OSHA class
F Rotary barbecue thank you
LHA sent a thank you to the Rotary Club of Lexington for sponsonng the
barbeques at the villages Many residents did attend. Steve attended both
Countryside Village and Vynebrooke Village He was unable to attend Greeley
Village so Kathy and Bill attended.
G Formal Board Resolution to change meeting place
Steve reviewed the by-laws In order to change the Board meeting place, a formal
Board vote must be done It was suggested to wait until next month when the full
Board is in attendance to vote
H. Proiect updates GV Parker CV Mass Ave VV
The Greeley Village Door Replacement construction schedule has been posted at
the village Steve will be asking for resident input regarding door colors As
discussed at the last Board meeting, the project has already been bid and the
contract is signed. However the architect was able to draft a cost estimate in the
amount of$2,093 44 in the form of a change order to prepare the steel door
frames for a possible electric stnke in the future
Upon a motion by Robert D Peters and seconded by Weidong Wang, the Board
voted to accept change order#1 in the amount of$2,093 44 to prepare the steel doors
for a possible electnc strike in the future The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
The Parker Manor roof replacement project will be completed in the next few
weeks
The Countryside Village generator warranty expires in 2016 Scheduled
3
maintenance is required to be done by an authorized dealer or the warranty is
void. The only local authorized dealer is ASNE Generac The annual fee for the
agreement is $850 00
Upon a motion by Robert D Peters and seconded by Weidong Wang, the Board
voted to accept the annual maintenance agreement from ASNE Generac in the
amount of$850 00 The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
The Vynebrooke Village HILAPP Project has been approved to go to bid in early
January The engineer is completing the final conservation documents to finalize
the Vynebrooke Village Water Remediation Project.
The Mass Ave Home Funds Project has to be rebid as the contractual language
needs to be modified by the architect.
Steve and Leo attended a CPC meeting. There was a prior conversation that the
housing authority should complete the 4 outstanding projects this year before
applying for CPA funds 11/1/14 It was suggested to discuss further at the
next Board meeting.
I. PHAS
Our PHAS Score was 100 We are a High Performer
J Lodestar Energy Contract
Steve was advised by DHCD to solicit another bid for the solar net metering.
Power Options submitted a bid. Lodestar Energy is much lower at 10 9 per
kilowatt for the housing authonty to buy solar power from a virtual site The
projected savings over the 20 years for the housing authonty is between 1 4 and
1 8 million dollars
Upon a motion by Weidong Wang and seconded by Robert D Peters, the Board
voted to enter into a 20 year solar net metering contract with Lodestar Energy for 10 9
cents per kilowatt. The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
Steve also would like to lock in gas prices by entering into a contract. Right now the
cost is 67 cents per thermal unit. Once the winter pricing is in effect, more than
4
likely the cost will rise Steve would like to lock in a fixed price of 70 cents
per themal unit for the next 18 months with Direct Energy It may cost the housing
authonty an additional $69 00 for that time period but is advantageous to lock in a
fixed price
Upon a motion by Weidong Wang and seconded by Robert D Peters, the Board
voted to enter into an 18 month gas contract with Direct Energy for 70 cents per
thermal unit. The roll call vote was as follows
YEAS NAYS ABSTAIN ABSENT
Nicholas Santosuosso NONE NONE Leo P McSweeney
Weidong Wang Melinda Walker
Robert D Peters
K. REAC Inspection results
The REAC Inspection score was 89 Some deficiencies noted where moss on
roofs, a malfunctioning GFCI and placement of buddy strings OSHA safety
equipment will be ordered so that staff can go on the roofs to remove the moss
L Public Housing Reform update
DHCD is working with Mass NAHRO to implement the reform. There are many
committees working with the legislature
M. NSHEDA Legislative Breakfast 10/15/14
Steve and Nick are planning to attend. LHA invited legislators to attend also An
aide from the office of Congresswoman Katherine Clark will be attending.
5 UNFINISHED BUSINESS
There are 2 Board members who need to complete the online Ethics Certifications
6 NEW BUSINESS
MRVP has mobile vouchers available The housing authonty sent the information
to 13 individuals on our wait list
7 ADJOURNMENT 6 55 P.M.
A true copy attest
STEPHEN KEANE, SECRETARY
5