HomeMy WebLinkAbout2014-04-28-REC-min (Lincoln Park Subcommittee) LINCOLN PARK SUB-COMMITTEE &4inutes—Aori| 382D24 Committee present—David Williams, Chair, Brian Kelley, Lynne Wilson, Bob Pressman, Cindy Kuechle, Joanne Shorter Others present—Bob Barnard, Landscaper, Wendy Rudner, Recreation, Miles Connors, h, Landscape Architect, Kick/\bpa xington Across Lexington—David Williams opened the meeting at 7.30 and introduced Rick Abrams who gave a presentation about Across Lexington—Walking, Running and Trail Biking in Lexington A section of the Fitness/Nature and Bike Path at Lincoln Park is included in their map He presented their brochure and other information and asked that we work together to promote Lincoln Park as the "go to" outdoor recreational facility in Lexington He felt that there should be training for the exercise stations on our website, mileage markers along the path and maps should be available The committee expressed their appreciation for his presentation and will discuss this further at their next meeting. Bathrooms—Brian Kelley told the group that the irrigation needs to be turned on before the landscaping is done Wes Wirth presented his cost estimate mfthe landscaping needed - $14,000-515,ODO There was considerable discussion about costs and available money There were three options discussed—1. Primarily grass (Brian Kelley's choice)—2. Eliminate rain garden from plan reducing the cost to approximately$11,000—3 As designed with rain garden, approximately 5l5,000. This doesn't include irrigation The committee VOTED on each option Option I—one in favor (Brian Kelley) and five against. Option 2—Lynne Wilson and ]oanneShorterintaVor—fmuragainst. Option 3—David Williams, Bob Pressman and Cindy Kuechle in favor and three against. Therefore,the landscape as designed with the rain garden will be installed Wesley will provide a complete cost including site preparation to the committee He will also talk to Chris Filadoro to let him know about the planned plantings and ask about the irrigation Permanent signs for Men and Women will be installed The donor sign will be installed as soon as the Town signs off on the construction The formal Opening will be JUNE 14 at 10 am Bathrooms will be landscaped in May prior to the opening. Signs— Brian told the committee that the three information signs are complete and will be installed as soon as he is able to do so Bob Barnard was asked to give the committee an estimate for widening the path along Worthen Road The March 25, 2014 minutes were accepted as written The next meeting will be May 27 at 7 pm The meeting was adjourned at9'4O. Respectfully submitted,