Loading...
HomeMy WebLinkAbout2014-07-10_Maguire RoadMaguire Road Roundabout Town of Lexington Hartwell Avenue 25 Percent Design Plan Development July 10, 2014 Agenda Agenda Project Background Existing Conditions Roundabout Attributes Proposed Conditions Questions and Comments Background - 2010 Traffic Plan Current Scope Existing Pedestrian/Bicycle Accommodations On-Street Bike Lanes No Pedestrian Accommodations Existing Maguire Road Operations 90 100 0 25 50 75 100 125 AM Peak PM Peak De l a y i n S e c o n d s p e r V e h i c l e LOS F LOS E Recent Crash Experience Corridor Study Plan Existing Conditions Alternatives Signal Roundabout Why a Roundabout? •Compatible with overall plan •It “fits” •Adequate capacity •Safer •Handles all modes •No signal maintenance Compatibility Roundabout Plan/Footprint Taking Required Minor Taking Required Minor Taking Required Pedestrian/Bicycle Accommodations Proposed Sidewalks On-Street Bike Lanes Proposed Crosswalks Roundabout Safety Source: NCHRP Report 672 Roundabout Safety •Lower speeds •Fewer crashes •Less severe crashes •Fewer conflict points Existing Operations with Roundabout 1 3 7 2 1 4 0 1 2 3 4 5 6 7 8 AM Peak PM Peak De l a y i n S e c o n d s p e r V e h i c l e Maguire Road Northbound Hartwell Southbound Hartwell Future Operations with Roundabout 6 7 28 3 1 10 0 5 10 15 20 25 30 AM Peak PM Peak De l a y i n S e c o n d s p e r V e h i c l e Maguire Road Northbound Hartwell Southbound Hartwell Roundabout Operations Signal Alternative Fits within ROW Signal Pedestrian/Bike Accommodations Proposed Multi-Use Path Proposed Crosswalks Proposed Sidewalk Future Operations with Signal 50 23 80 39 24 14 45 50 0 10 20 30 40 50 60 70 80 90 AM Peak PM Peak De l a y i n S e c o n d s p e r V e h i c l e Overall Maguire Road Northbound Hartwell Southbound Hartwell Future Signal Operations Signal Operations Comparison of Intersection Options Roundabout Signal Cost $1.3 m $1.5 m Footprint Some sliver takings Fits within ROW Operations More capacity Adequate capacity Safety Safer Safe Impact on Bridge May require minor widening Requires widening Compatibility Yes Not so much Questions/Comments Contact Information jlivsey@lexingtonma.gov Other Work – Bridge Study Other Work – Bridge Study Other Work – Bedford Street Other Work – Bedford Street Other Work – Bedford Street