GRADING NOTES
1. Prior to commencing any excavation work the Contractor shall notify all utility
companies in accordance with the 'Dig SafEr notification procedures promoted by
respective utility componle& The 'Dig Safe' telephone nurnbw for Massachusetts
is 1-888-344-7233.
2. Contractor shall blend new earthwork smoothly Into existing providing vertical
curves or roundings at all top and bottom • slopes,
3. Contractor sholl verity all existing grades in the field and report any discrepancies
in the site survey prior to starting work
4. Any area outside the limit • work that is disturbed shall be restored to its original
condition at no cost to the Owner.
5. Pitch evenly between spot grodes. AJI paved crew must pitch to drain • •
minimum slope of one-eighth inch (1/87) per foot. Any discrepancies not
allowing this to occur shall be reported to the Engineer in consultaffon with
Landscape Architect prior to continuing work.
6. All proposed top at vertical curb elevations are from 4' to 8! above bottom of
curb unless shown otherwise.
7. Wiere new paving meets existing povka meet line aid grode • existing in •
smooth trmitioft
8, Excavation required within proximity • existing utility lines shall be done by
hancl, Contractor 4nall repair any damage to existing utility lines or structures
incurred during construction operations • no cost to Owner.
9 Contractor shall provide dust control for construction operations as approved by
Engineer.
10. All points at construction egress sholl be maintained to prevent tracking
or flowing of sediment onto public roods.
11, At all locations wbere existing pavement abuts new construotiort the edge of to
existing pavement shall be saw ♦ to • neat aid uniform line with smooth
and even transitions.
11 Controctor shall verify all existing top • ourb elevatloris before proceeding with
any construction.
13. Grading • base courses shall require approval • the Engineer in consultation
with Landscape Architect prior to placing any pavement.
14. Sidewalks shall have • maximum longitudinal slope of 5%, • maximum cross-
slope of 2%, and a rnininnum crowsiope of 11.
RIM ELEVATIONS ARE FOR REFERENCE ONLY.
REFER TO DRAJNAGE PLAN, SHEET 20 TO COORDINATE
LOCATION AND ELEVATION OF DRAINAGE STRLICTURES
100
FEET
GRADING PLAN
I
S
J)
71'
W
All
Grading Legend-
TC:286.35
Top of Curb
BC:285-85
Bottom of Curb
RIM=285-00
Rim Elevation
+28352
Proposed Spot Elevation
_282—
Proposed Contour
------
- -- - 287.9----
Proposed Contour (01 Inorerrieft)
+HP
High Point
LOW Point
100
FEET
GRADING PLAN