HomeMy WebLinkAboutCON-103-3SAWCUT EXISTING PAVEMENT
3" BIT. CONC.
SURFACE COURSE
6" H.E.S CEM. CONC.
BASE COURSE
8" GRAVEL BORROW
(M1.03.0 TYPE b)
GRANITE EDGING (NEW OR WIDTH
RESET) W /4" REVEAL VARIES
EXISTING ROADWAY 1' (TYP)
SAWCUT
PAVEMENT MAKEUP
SAME AS ABOVE
1' (TYP.)
9"
MEETS VERTICAL CURB SEE
CONSTRUTION STANDARDS
0
CONSTRUCTION
CTION
EXISTING ISLAND
1' (TYP.)
SAWCUT
----- - - - - --
2.5" BIT. CONC.
WALK SURFACE
EXCAVATE TO LIMIT OF EXISTING
BIT. CONC. & BACKFILL W /GRAVEL
MEETS SLOPE
ER C.S.
WIDTH VARIES
®2.5" BIT. CONC.
WALK SURFACE —�
1/4 IN /FT MAX.-7
APPLY BITUMINOUS TACK
COAT ON ALL EXPOSED SURF
GRANITE CURB (NEW OR RESET)
W /6" REVEAL (TYP.)
3" BIT. CONC.
SURFACE COURSE
EXISTING PAVEMENT
r \-6" H.E.S CEM. CONC.
BASE COURSE
8" GRAVEL BORROW
(M1.03.0 TYPE b)
i
GREATER THAN 6'
RESET EXIST. CURB
W /6" REVEAL (TYP.)
BITUMINOUS
TACK COAT
CONTROLLED DENSITY
FILL — TYPE 2E
3" ELECTRIC CONDUIT
SCALE IN FEET
i j i •
®-1' (TYP.)
SAWCUT EXISTING PAVEMENT
3" BIT. CONC. PAVEMENT
TYPE 1 -1 SURFACE COURSE
3" BIT. CONC. PAVEMENT
TYPE 1 -1 BASE COURSE
3" DENSE GRADED CRUSHED STONE
FOR SUBBASE (M2.01.7)
8" GRAVEL BORROW
(M1.03.0 TYPE b)
18"
} f { y+ 1
rt
1. *Tr F
A � Y
}
6"
3" BIT. CONC
SURFACE COURSE
I
STATE
FED. AID: PROD. NO.
BAR
Ij
TOTAL
MASS
NA --
1999
3120
r
PROJECT FILE NO. NA
TYPICAL SECTIONS/
DETAILS
•
J
WIDENING WJCEMENT CONCRETE BASE
SURFACE:
3" CLASS I BITUMINOUS CONCRETE PAVEMENT TYPE 1 -1
PLACED IN TWO (2) LAYERS: 1 1/2" TOP COURSE MATERIAL
OVER 1 1/2" BINDER COURSE MATERIAL
BASE:
6" HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE
PLACED IN ONE (1) LAYER.
FOUNDATION:
8" GRAVEL BORROW (Ml.03.0 TYPE b)
WIDENING WITH BITUMINOUS CONCRETE BASE
SURFACE:
3" CLASS I BITUMINOUS CONCRETE PAVEMENT TYPE I -1
PLACED IN TWO (2) LAYERS: 1 1/2" TOP COURSE MATERIAL
OVER 1 1/2" BINDER COURSE MATERIAL.
BASE :
3" CLASS I BITUMINOUS CONCRETE PAVEMENT TYPE 1 -1 BASE
COURSE MATERIAL PLACED IN ONE (1) LAYER.
FOUNDATION:
3" DENSE GRADED CRUSHED STONE FOR SUBBASE (M2.01.7)
OVER 8" GRAVEL BORROW (M1.03.0 TYPE b)
TRENCH CUT UNDER PAVEMENT
SURFACE:
3" CLASS I BITUMINOUS CONCRETE PAVEMENT TYPE 1 -1
PLACED IN TWO (2) LAYERS: 1 1/2" TOP COURSE MATERIAL
OVER 1 1/2" BINDER COURSE MATERIAL.
BACKFILL:
CONTROLLED DENSITY FILL — EXCAVATABLE TYPE 2E
(M4.08.0)
SUPPORT NET
FILTER FABRIC
,— BACKFILL
NDISTURBED SOIL
POLE---,,. SUPPORT NET
FILTER FABRIC
BACKFILL
SECTION A
TOP VIEW