CONSTRUCTION PHASING - GENERAL
1. INSTALL CONSTRUCTION SIGNING, DRUMS AND OTHER TRAFFIC CONTROL
DEVICES AS REQUIRED, PRIOR TO THE COMMENCEMENT OF ANY WORK. THE
CONTRACTOR SHALL NOT DO ANY WORK THAT WILL INTERFERE WITH
THROUGH TRAFFIC DURING THE PEAK HOURS OF 7:00 A.M.' TO 9:30 A.M.
AND 3:30 P.M. T0,6:00 P.M.
2. NEXT, CONSTRUCT ROADWAY WIDENING AND INSTALL CURBING.
3• NEXT, CONSTRUCT WIDENING AT CORNERS.
4, NEXT, CONSTRUCT TRAFFIC ISLANDS. INSTALL PROPOSED SIGNING.
5. THE CONTRACTOR SHALL LIMIT OPERATIONS TO ONE CORNER OF THE
INTERSECTION AT ANY ONE TIME.
6, REMOVE ALL TEMPORARY SIGNING AND OTHER TRAFFIC CONTROL DEVICES.
IW20-1
W13 -1
0
r��' �[� . Ali
IDENTIFI—
TRAFFIC MANAGEMENT
-
GENERAL NOTES
COLOR/
1.
MAINTAIN ABUTTER ACCESS (VEHICULAR AND
CATION
NO
PEDESTRIAN) AT ALL TIMES, EXCEPT FOR SHORT
7
W20 -8 SIGNS SHALL BE USED ONLY WHEN POLICE
WIDTH
PERIODS, AS APPROVED BY THE ENGINEER.
NUMBER
OFFICERS ARE DIRECTING TRAFFIC. THEY SHALL BE
2•
GRADE DIFFERENCES IN EXCESS OF 2 INCHES DURAG
SIGNS
REMOVED OR COVERED AT THE END OF EACH DAY.
NON— WORKING HOURS REQUIRE THE DELINEATION
8,
'PAVEMENT MARKINGS WHICH MIGHT CREATE
WITH DRUMS.
REQUIRED
CONFUSION SHALL BE OBLITERATED. TEMPORARY
3.
GRADE DIFFERENCES IN EXCESS OF 4 INCHES DURING
PAVEMENT MARKINGS SHALL BE USED AS NECESSARY
AND SHALL BE IN PLACE BEFORE WORK IS
NON— WORKING HOURS REQUIRE PROTECTION WITH
COMPLETED AT. THE END OF EACH DAY.
Wl -4R
DRUMS, AND SHALL BE BACK FILLED WITH A WEDGE
36"
SEE STANDARD
OF GRAVEL OR OTHER MATERIAL, AND COMPACTED
9.
PEDESTRIANS SHALL BE PROVIDED WITH -A SAFE AND
TO A 4:1 SLOPE.
CONVENIENT TRAVEL PATH.
4•
ALL DRUMS USED AT NIGHT SHALL HAVE EITHER A
10.
SAFETY SIGNING SHALL BE PLACED AS SHOWN IN
TYPE "A" FLASHER OR STEADY BURN TYPE "C"
THE INSTALLATION NOTES OF THE SIGN SUMMARY, AS
LIGHT.
REQUIRED BY THE MUTCD, AND /OR AS DIRECTED BY
THE ENGINEER.
5.
ALL SIGNS NOT APPLICABLE TO THE VARIOUS
CONSTRUCTION STAGES SHALL BE REMOVED OR
11.
IF MORE THAN ONE DAY IS REQUIRED FOR THE
W1 -4L
COVERED.
36"
CONSTRUCTION /RELOCATION OF THE HIGHWAY GUARD
6•
ONE 11 —FT. LANE OF TRAVEL IN EACH DIRECTION
BETWEEN STATIONS 43 +58 RT SPRING STREET AND
SHALL BE MAINTAINED WHEN POSSIBLE.
139 +61 LT HAYDEN AVE, THE CONTRACTOR SHALL
BI— DIRECTIONAL ONE —LANE ROADWAYS SHALL BE
INSTALL TEMPORARY PRECAST MEDIAN BARRIER UNTIL
USED ONLY WITH THE WRITTEN PERMISSION OF THE
THE RELOCATED HIGHWAY GUARD IS IN PLACE.
W 5 1
ENGINEER. AT THOSE TIMES A MINIMUM OF TWO
24"
MPH
POLICE OFFICERS SHALL BE USED TO CONTROL
TRAFFIC. BI— DIRECTIONAL ONE —LANE ROADWAYS
_
i
IDENTIFI—
SIZE OF SIGN
FISCAL
SHEET
COLOR/
NUMBER
INSTALLATION
CATION
NO
MASS.
OF
1999
WIDTH
HEIGHT
NUMBER
TEXT
DIMENSIONS
LEGEND
SIGNS
NOTES
REQUIRED
_
250' t BEFORE
Wl -4R
36"
36"
SEE STANDARD
SEE STANDARD
BEGINING OF TAPER
M.9.30.0
M.9.30.0
250' t BEFORE
W1 -4L
36"
36"
O
BEGINING OF TAPER
00
MOUNT W/ W20 -1 AND
W 5 1
24"
24"
MPH
AS REQUIRED
_
i
\
naro
1000' t BEFORE WORK ZONE
W20 -1
48"
48 "o
AND AS SHOWN ABOVE
W20 -4
48"
48"
row
AS REQUIRED,
-
awrr
500' f BEFORE TAPER
W20 -8
36"
36"
250' f BEFORE
OFFICER
t BEYOND
G20 -2
60"
24"
CONSTRUCTION
CON
LEXIIVGTOt
STATE
FED. AID. -PROD: NO
FISCAL
SHEET
TOTAL
AR
NO
MASS.
XXX —XXXX
1999
1 20
20;
PROJECT : FILE NO.
SHALL NOT BE` USED DURING NON — WORKING HOURS. t
THE CONTRACTOR SHALL MAINTAIN ON LANE OF
TRAVEL IN EACH DIRECTION AT THE END OF EACH
WORKING DAY.
W20 -1
w13 -1
TYPICAL INTERSLOON TRAFFIC MANAGEMENT
-FOR WIDENING CORNERS & TRENCH CUTS
N.T.S.
*SEE TAPER FORMULA
y
s
WORK ZONE 1 100' BUFFER I TAPER 1 250't
2. MAXIMUM SPACING OF DRUMS IN TAPER SHOULD
BE APPROXIMATELY S /2, FROM ABOVE.
3. TRAFFIC MANAGEMENT CONFIGURATION APPLIES TO
ALL LOCATIONS INCLUDED IN THE CONTRACT.
4. FINAL LOCATION OF SIGNS, DRUMS, AND OTHER
.- TRAFFIC CONTROL DEVICES SHALL BE DETERMINED
— BY THE ENGINEER IN THE' FIELD.
5. MAINTAIN AT LEAST ONE LANE OF TRAVEL IN EACH
W1— DIRECTION AT ALL TIMES.
W13 -1