Loading...
HomeMy WebLinkAboutSD-426-62401 234 2221 RATUA ELEV 210.00 PROP05W SPLIT RAIL FENCE BASIN -G (2) 40' LONG SECTIONS, -10' BENCH PROPOSED HYDRANT ) APART ALONG TRAIL HEAD. tom_ WITH 6" GATE VALVE > Z3� 240.0 - ' -`-- - $UiLDiN � SI'r 3 42 O / \ � x226.0 tv t=1 E 2 BASIN -$ \ 26 d1s A \ ` COMMON OPEN SPACE / �. a 4� p 8 2 +4 t0 N h �� 1� % , , STONEDUST FOOTPATH a a HIP N 0 a n Y f W C a �� 0 BENGI f ETdC 5MH-3 7H =326:0 6 5 SMH -2 I STORY a°5a 4 iN -D BW =z2a.0 ` o ,` 226.0 C4 \ qa G v G LIP 2:26 5 h! zp, BH =222.0 �`ti)fi46' �� cp`Y % 1,tJ fl.�3 sr$ ' RELOCATE EXIST. HYDRANT ���3 °' / / / Y �p b• S 4SIN- 5) POLE C tp RELOCATED HYDRANT WITH GATE VALVE, z2� p SMH c9.s / CONNECT TO EXIST. TW2t6 e?� � j i 8" WATERLINE! PROPOSED TREELtNE (TYP) TW224:0 � _ 2�9 (PRIVATE-40' NODE) O 4' HIGH FIELD STONE BN^t220. k3gSIN 2 f RET. HALL (TYP) SAHCUT AND MATCH LEVEL SPREADER 2�$.7 2 EXiSiTNG PAVEMENT AT BASIN OUTLET'- MATCH EXIST. CURB (SEE DETAIL) a $, 7 GONNEGT TO EXISTING BENCH SEWER MANHOLE 1 =224.30 ADJUST RIM STONE DUST FOOTPATH TVV2240 TO FINISHED GRADE BW220.0 LOH POINT ELEV = 228.94 _ _ _ .ClanN• LOH POINT STA = 3+58.99 SCALE.° 1" = 30' CO -1 PVI STA = 3+52.9"1 R= 229.50 PVI ELEV = 228.80 PROPOSED DRIVEWAY 1= 224.50 12 A.D. = 2.38 1= 224.50 12 K = 21.03, 50.00' VG CO -2 O R= 228.40 s 1= 224.50 12 44 EXISTING ROADWAY; y+. 6 ? 1= 224.50 12 s rs t-s un� "m + iq I < x n U to (�V .0 � t++ c�Y � N a � } " ��fN C 1 QC BASIN -1 rya cii Vii m cIi to i0 w 1= 224.00 6" N++w UV tV4n UV �. - n > > 1= 224.00 fi" to NO JN ct) >X 6" PVG FROM APPROVED BY BASIN -2 LEXINGTON PLANNING BOARD w UNIT 2 1 =224.00 6" I =226.90± 1= 224.00 6" / N PVG FROM U UNIT 4 1 =221.0± z fK v" PVC FROM UNIT 3 VIVO 7. 8 sco. ty% 12" HOPE TO G0-1 / � 8" GLD4 ViP`TER ' 6" PVC FROM UNIT I 6" PVG FROM 1=226.'10 ±'' DATE UNIT'T 1 =225.0± 6" PVC, FROM UNITS NOTE: 12" HDPE TOGO -2 f ELEVATIONS SHOWN IN PROFILE �- Doom A?, Ctvv�EJ� CLERK OF THE TOWN OF CONNECT TO EXIST. LEXINGTON, MASSACHUSETTS HEREBY CER77FY THAT THE N077CE OF ARE EXAGGERATED IO TIMES HATER SERVICE APPROVAL OF THIS PLAN BY THE LEXINGTON PLANNING BOARD HAS FOR CLARITY BEEN RECEIVED AND RECORDED AT THIS OFFICE AND NO N077CE OF APPEAL WAS RECEIVED DURING THE TWENTY DAYS NEXT AFTER SUCH RECEIPT AND RECORDING OF SAID NO77CE. TOWN CLERK DATE FROM STA. TO STA. TANGENT LENGTH, BEARING CURVE 0 +00 3 +06.92 306,92' N 27'31'13" W - S PROPOSED SEINER SERVICE 3 +06.92 4 +08.46 1 L =101.54', R= 120.00' A = 48'29'00" 4 +08.46 5 +31.92 123.45', N20'57'48 "E 0 SMH PROPOSED SEWER MANHOLE e4ARK E Street Layout and Profile Plan CIVIL HAZEL ROAD .� NO 38189 LEXINGTON, MASSACHUSETTS MQUIRD O ERS.• PREPARED FOR ELLEN & JOHN A. SHARKEY P a 13 HAZEL ROAD NORTH SHORE CONSTRUCTION AND DEVELOPMENT, INC. LEXINGTON, MASSACHUSETTS SCALE: AS SHOWN DATE• MAY26, 2004 ELIZABETH M. WEISS ' � `dImx 3 l8 EST ROAD ; J( B / q T LEXINGTON, MASSACHUSETTS 't: E 1\ j I A ( �{ I W' - PROPOSED B" WA7FR MAIN i - ET&C- PROPOSED TELEPHONE, ELECTRIC AND CABLE - S PROPOSED SEINER SERVICE -D PROPOSED DRAIN LINE Sc STORMCEPTOR UNIT • CO CLEANOUT r 0 SMH PROPOSED SEWER MANHOLE PROPOSED HYDRANT HDPE HIGH DENSITY POLYETEHLYNE I INVERT - D - PROPOSED DRAIN 1 PVC POLYVWnCHLORIDE PROPOSED RETAINING WALL CLD1 CEMENT LINED DUCALE IRON ✓'� GV PROPOSED GA 7F VALVE BCB B17UMINOUS CONCRETE CURB SGC SLOPE GRANDE CURB -238= PROPOSED CONTOUR t X 224.0 SPOT ELEVA770M HP HIGH POINT LP LOW POINT 1 RIM AND I INVERT SCHEDULE SC -1 R= 228.50 i " HOPE FROM SC -1 1 1= 225.10 12" HOPE TO CO -1 " HOPE TO BASIN -1 SC -2 R= 228.75 1= 224.80 12" HOPE CO -2 " HOPE FROM SC -2 " HOPE TO BASIN' 2 S SMH -1 R= 229.10 1= 225.42 8" SDR35 PVC FROM FROM SMH -2 1= 225.42 8" SDR35 PVC FROM TO ESMH HOPE INLET 1= 225.42 6" SDR35 PVC FROM UNIT 6 HOPE OUTLET 1 SMH -2 R= 231.20 HOPE INLET 1 1= 227.05 6" SDR35 PVC FROM UNIT 3 HOPE OUTLET 1 1= 227.05 8" SDR35 PVC TO SMH -1 EXISTING SEWER MANHOLE R= 229.5± 1= 224.30 8" SDR3a PVC FROM SMH -1 3 a f 1 i { s DEFINITIVE SITE DEVELOPMENT PLAN FOR A SPECIAL RESDENTIAL DEVELOPMENT HAZEL ROAD OF MQUIRD O ERS.• PREPARED FOR ELLEN & JOHN A. SHARKEY P a 13 HAZEL ROAD NORTH SHORE CONSTRUCTION AND DEVELOPMENT, INC. LEXINGTON, MASSACHUSETTS SCALE: AS SHOWN DATE• MAY26, 2004 ELIZABETH M. WEISS ' � `dImx 3 l8 EST ROAD ; J( B / q T LEXINGTON, MASSACHUSETTS 't: E 1\ j I A ( �{