Loading...
HomeMy WebLinkAboutRW-453BN W W S co W W cn z O F- Q z z O U tY O L� GENERAL NO TES.- LEGEND: £XIS77NG PROPOSED SEE RS ON NEW SEWER TO BE INSTALLED IN EXIS77NG SEWER ALIGNMENT. a STONE BOUND 2) NEW WATER TO BE INSTALLED IN NEW ALIGNMENT. GRAPHIC SGALE. ® FILE LEXINGTON DPW 3) FOR SEWER DEP7H INFORMATION SEE SPECIFICATIONS ATTACHMENTS REPORTS ® SEWER MANHOLE 4) 7HE NEW PVC SEWER INSTALLA77ON MUST BEGIN AT UPSTREAM SEWER MANHOLE, SMH- ELEC7RIC MANHOLE MAGNETIC (D TELEPHONE MANHOLE DOWNS7REAM PROJECT LIMIT IS SMH -350. ❑ CATCH BASIN 5) NO SEWER SERVICE SHALL BE DISCONNECTED FROM THE 7OHN OF LEXINGTONS SEWER ( IN FEET I D4 WATER VALVE HSE #26 SYS7FM FOR LONGER 7HAN FOUR HOURS. NO SEWAGE MA .Y BE DISCHARGED FROM THE 1 inch = 40 It NI EL- 254.82 L =20.0' eC�j I y HOUSE SERVICE FOR THIS PERIOD: THE CON7RACTOR MUST DELIVER A WRITTEN N077C£ 6' PVC SERVICE DIRECTLY INTO SMH -420 HSEp32 6' PVC SERNCE C,> D -4.0' EL= 255.74 L =16.5' D =3.90 EL= 251.95 HSE /20 HAD IXISRNG TO �. Cam. EL= 245.82 L -28.0' DIRECTLY INTO SMH -419 EL= 253.68 EL= 249.79 L =16.7 ^N 7) PRIOR 70 ANY EXCAVA770N,. THE CONTRACTOR SHALL INSTALL aTER FABRIC BAGS FOR 6' PVC SENflt MAIN RE INTO PVC -PVC FERNCO WATER SERVICE SHUTOFF D -4.5' L =18.0' D -5.25 o N0. e f NO. 20 � 22yi' B D N0. 26 D -386' N0. 32 N0. 38 K-f ALL EXIS77NG U77LI77ES SHOWN ARE APPROXIMATE. IT IS THE CONTRACTORS I 3+4 20 FERNCA RESPONSIBILITY TO VERIFY THE LOCA77ON OF ALL MAIN LINE AND SERWOE CONNECTION SIGN FERNCO 9) STA I*nP 7RAFRc LIGHT POLE STREET. 2"0 FERNCO 3 +� "o QR FILE LEXINGTON DPW FERNCO FERNCO w u, n W 8's w N 11) ED ,15, 8'• 8" R 8,. 8s ED 0 0 ED 8.. 8..µi E p " GA EG 6" GAS 6" GAS 8, EG 6" G EG 8' SEWER SMH -424 STA 7 +62.5 HSE #2538 HAD EXISTING SMH -423 STA 5 +93.5 8'x6" PVC REDUCFR EXIST 6" TRANSITE FERNCO SMH -419 FERNCO C PVC TO SEWER MAIN TIE INTO USING PVC -PVC FERNCO 36" OF 6" PVC PIPE FORCE MAIN PIPE FROM HASTING SCHOOL STA 1 +78 6' CLAY TO PYC FERNCO TO TIE IN FORCE MAIN PIPE DIRECTLY INTO SMH -420 NO. 27 N0. 33 NO. 7 w Yy' EL- 250.42 L =15.0' EL =249.74 D =6.85' L =14.0' CONNECTS TO MASS. AVE D -6.90' N W W S co W W cn z O F- Q z z O U tY O L� i6'A qY STONE WALL GUARD RAIL RETAINING WALL 7REE 53,13 GENERAL NO TES.- LEGEND: £XIS77NG PROPOSED 1) NEW SEWER TO BE INSTALLED IN EXIS77NG SEWER ALIGNMENT. a STONE BOUND 2) NEW WATER TO BE INSTALLED IN NEW ALIGNMENT. GRAPHIC SGALE. ® DRAIN MANHOLE 3) FOR SEWER DEP7H INFORMATION SEE SPECIFICATIONS ATTACHMENTS REPORTS ® SEWER MANHOLE 4) 7HE NEW PVC SEWER INSTALLA77ON MUST BEGIN AT UPSTREAM SEWER MANHOLE, SMH- ELEC7RIC MANHOLE 424: THE NEW SEWER PIPE IS TO BE INSTALLED IN THE DIREC7701V OF THE ROW. (D TELEPHONE MANHOLE DOWNS7REAM PROJECT LIMIT IS SMH -350. ❑ CATCH BASIN 5) NO SEWER SERVICE SHALL BE DISCONNECTED FROM THE 7OHN OF LEXINGTONS SEWER ( IN FEET I D4 WATER VALVE SYS7FM FOR LONGER 7HAN FOUR HOURS. NO SEWAGE MA .Y BE DISCHARGED FROM THE 1 inch = 40 It NI HOUSE SERVICE FOR THIS PERIOD: THE CON7RACTOR MUST DELIVER A WRITTEN N077C£ 24 HOURS PRIOR TO 7HE SERVICE IN7ERRUP776N. 6) THE CON7RACTOR MUST N077FY DIG SAFE PRIOR TO ANY CONS7RUC770N AC77WTY. 7) PRIOR 70 ANY EXCAVA770N,. THE CONTRACTOR SHALL INSTALL aTER FABRIC BAGS FOR WATER SERVICE SHUTOFF FILTERING SLLT IN 7HE CATCH BASINS. BAGS SHALL BE INSTALLED IN ALL CA7CH FIRE HYDRANT 4& GA 7E BASIN: IN THE PROJECT AREA ON SCHOOL STREET. 'QUP 66-64 UTILITY POLE co,UP s6 -66 8) ALL EXIS77NG U77LI77ES SHOWN ARE APPROXIMATE. IT IS THE CONTRACTORS GAS VALVE RESPONSIBILITY TO VERIFY THE LOCA77ON OF ALL MAIN LINE AND SERWOE CONNECTION SIGN -"- 9) LOCA- ]IONS. ATTACHMENT A TO SPECIRCA77ON CONTRACT BOOK IS BORING LOG FOR SCHOOL I*nP 7RAFRc LIGHT POLE STREET. 2"0 STORM DRAIN +� "o 10) ATTACHMENT 8 TO SPECIFICA770N CON 7RACT BOOK IS SEWER LINE INSPEC7701V 6"G GAS MAIN WHICH SHOWS LOCA7701V OF SERER SERVICE IOCA LIONS. 8's SANITARY SEWER 11) ATTACHMENT C TO SPECIRCA 77ON CONTRACT BOOK IS MANHOLE INSPEC770N ,15, REPORT SHOWING DEPTHS OF MANHOLES TO BE REBUILT. i6'A qY STONE WALL GUARD RAIL RETAINING WALL 7REE 53,13