Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RW-409A-1
'6. } er ✓ ^ ` �i "Ilk ; o , I � smooth under hinge, hrpd 32/ o Heavy hinges riveted to p/. and frame 12x2 "bar , welded frame - Corners we /ded i Hole for pipe shown thus. ^ or riveted fo L DETAIL OF' ! N Ci E 0 -4, ifn /e /ron Frame 3/'" checfrerea steel p /ate, 3 hinged at sldes and split \e: ;'' ' /•'`� � ; ti �\ rn the middle,. Gr.33 3L Location of tan/f as 0.92 �'�, :6'_0` Lori �� shown on Topoyrapfirc sj a x �aPlan dated Aag.25, 1933. Ole 3 3ti • roe .SECTION :B �PProximafe location o{ / "anchors \ � � , Notes: ,8 Std e� 0 The site has been partially cleaned to /edge by the fox rl. ^ 21 of ook \ � � % g,3 � Contractor should visit site to determine excavation /pdti5 L ;to� ` y,o 3� % to be done. ¢ ae p to be thorouyhly cleaned and ap loose led e r l �D Q�pk g removed. Location 'o{ stand r ppe has been morel t» the :.north 1 _, _:.pPProhvrr�z;te✓ J'0' crud-- to _. k 33 3 the vast 6`© me ®A, ,A,�/ locaitron as shown on Topographical P /an of Pro posed Stand r e site of the T wn E p P? Engineering Dept \' h\ of rades so Al !ed e 9 g (.ShaWn. 328,0) and location of existing water pipe and tank have been ` tafrQn .from the above plan. i 3 Concrete base ' to have' 12 sides as shown. ���\ �i� 3'30 Rr?chor ,bolts to be provided by Steel Tank Contractor: �' 330` Core shal/ be used in driving bolts 11771, /edge , not to — rn�ure threads on bolts. anchor rods to be grouted rni'o ledge after s !rt ends have been tightened by dr'rvmy. P Present Concrete Tank Ig "� Anchor Bolts .-� - �a furnished by Tank Con {r ` To of concrete Gr. ,330.92 , - ., -_ 3-¢ "� Pods continuous around' 3" sleeves IW I° r.(ot each top, bent fo : y,, 20'-6 radius orrd /apped 2 =6 "af breiks ii'" anchor bo!>`� farmshed by _4'' furnished b € y >oundatron Gantracfor foundatmn Contractor. � . r, d r, o; _ _ . . If u u - _Where anchor bo! s are oo r 77r¢ra sleeves are tc be _M. n. ,t- h; e t /on / v Ito Approx. resent Gr, of excamtion APProx. led e ! far de th of cony e 9 {, led with grout by the . �, n � P . ; ., 9 �, p te, foundgtron Iii i! x contractor FoNndafio fr c shall of ofi° heads � a n Con a for ��°-� 5,. fter- boftam ` rrn of } _ t :_�.1 ,Rods; 2 fo each I 0 anchor boll #hat of i; -split he ends, a rovrde Wed'es Tank n g �i :- 8 3 n extend le into solid I to make them t p 9 is r place, �t N , ledge, furnished and sel by { on Contractor,' &Ilom . zr6 be 2,0. ht !n hales drilled Into Jed9 8 6' Washers, tarnished .16 !!}d below surface :of and to to be not less than 3'0" by Tank Contracfor. d -!t o, ledge a o Jess Phan 3 0 °above: washer /ate of abo>e d - I or bolts. These rods to be located about �ff each l�rde .. _ ! � - o>` "anchor - bolts. { ECT ON A A _ LEXINGTON 5TAIVDPiPi= FOUNDATION PLAN IT T� AND NOTED. Ur ,•r 1' t. 7, 1934 i SHEC "- 775