Loading...
HomeMy WebLinkAboutHanscom Sewer Force Main FST plans Sh 14 Dwg C-8TBM FRONT CAP BOLT ON FIRE HYRANT EL. 130.84 _ M� �i- 135 130 125 {n Z O F- W J W 120 115 110 N a u1 0 M N O K n a N N I i 0 I r12 col, i H #121 V #35 HARTWELL AVE. CB #123 — 5 n _ A "pG 126 5--- , CB #120 30" gCO_ -• - LIMIT PAVEMENT HARTWELL OVERLAY, SEE "KEYWA tA� #29 HARTWELL AVE. DETAIL" DRAWING NO. % 126 C -16 IYP. � R D— 127 —___ _ �128 _ NE G- --- Cr -- - - G CB #31 0 10' Q 13 12 % DYL DYL— ?' D DYL DYC BIT. C NC. PVMT. DMH 29^ 12" RCP .. _ 18" RAP _ CB #30 E E ' Sgt EJ 1_ .1_ F ATS( - - - 8 -20 — 9— SI -- T11SION -- — — SMH�f10 S `_ S - 8 _ �-- Q—S — S AC — — S _ __72 18 RC P / ?g CB #124 12 1R - - - - -- 13r �,> CB #124A N REMOVE EXISTING AND N � LIMIT OF RIGHT OF W Y, TYP. INSTALL NEW ASPHALT = a� CURB AS REQUIRED a REMOVE �4 UNSUITABLE MATERIAL APPROX. VIN DEPTH `� #29 HARTWELL AVE. A Y G. NN o-^ -24 RCP - -o-- -o- 3 123A 12 $AZH #121A SIG1�Y� �� '1PE7 NET G 'L. MAR! PG x,.-13 ________- - - -.�� D YL — " DMH #34 SMH #125 131 132 Zf AVE. 2 s LIMIT OF PAVEMENT OVERLAY Qom MAXIMUM 5' BEYOND TRENCH PATCH (NOT TO EXCEED LIMIT OF RIGHT OF WAY). PLAN SCALE: 1"=30' EMERSON CUM IN T13M #27 HARTWELL AVELL A� FRONT CAP BOLT BOLT OF FIRE HYRANT ff El. 131.24 „ l 132 133 — Y $ I( CONSTRUCTION MGT (CHIEF. ENWk R NQ SECT. C HI E F, E N ! ENY PLNG RR BASE qNI ENGINE[R_ to 45 BEND FIW CHV QdO. 1 CORROSION CTRL A"TECT 133 12" D.I. FORCE MAIN l DATE 12 AUGUST 1 `I'I S CABLE #24 HARTWELL AVE. z :3 OR TEL REMOVE EXISTING AND MANHO INSTALL NEW ASPHALT r CURB AS REQUIRED im LIM OF PAVEMENT OVERLAY REMOVE EXISTING AND INSTALL NEW ASPHALT CURB AS REQUIRED B -21 i EXISTING GROUND SURFACE MIN. COVER AS SHOWN - 2" RCP DRAIN GAS --o S " WATER 1 CT TI IWE 5.0' MIN. /w COVER 4.0' 0 4" GAS m®-- WATER ((o ) 6! 8" AC SEWER • 9i' l Z O) CN > Z i4 +00 y'1'aQ0 � 8" AC SEWER l5 +00 5StQ0` 58 +00 58+00 PROFILE SCALE: HORIZ. 1 =30' VERT. 1"=3' 59 +00 sytlx>' —0-0- 4 RCP INV.= 126.64 8" AG 61 +00 FAY, SPOFFORD 3 1HORNOIKE, INC. LEXINGTON, MA COORDINATION 5' 0' 5' 10' 1"=3' 25' 0' 25' 50' 75' 100' 125' 1"=30' 2 12.0 13 56 +00 15.0' 5 Sb+oO' 8" AC SEWER 21 —g= 11' -3" 12.0' 135 62 +00� 62tG(! – { 130 0 12.5 Q > 1,1 ) I. - -1120 115 AFPV'0 DEPARTMENT OF THE AIR FORCE 647 SPTG / CEDE HANSCOM AFB, MA, 01731 BASE CIVIL ENGINEERING SQUADR DRAWING NO REPAIR SEWER FORCE MAIN HANSCOM AIR FORCE BASE, MA. <� STA. 54 +00 TO S TA. 62 +00 l a E COMMUNICAP" I( CONSTRUCTION MGT (CHIEF. ENWk R NQ SECT. C HI E F, E N ! ENY PLNG RR BASE qNI ENGINE[R_ FIW CHV QdO. 1 CORROSION CTRL A"TECT CIVIL ENGINEER C" l DATE 12 AUGUST 1 `I'I S MEDICAL svftffs I ENVIRONMENTAL ELECTRICAL ENO MECHANICAL ENG SCALE AS NOILU MXRD92 -0035 U46V0 AOETICT' ENERGY CONSERY. STRUCTURAL EN DRAWN BY CAP CAO PROJ NUMBER NCOIC , DRAFT VAULT F" RUMRER SHEET 14 OF_ nro _- REV I G- ?_210