HomeMy WebLinkAboutHanscom Sewer Force Main FST plans Sh 21 Dwg CE-15FIN.. GR.–� WARNING TAPE
SAND BACKFILL,
LEGEND
COMPACTED
°
POINT UP BRICKWORK
FIRMLY TAMPED
ON THE INSIDE —
FILL
N
00
(STREET SURFACE)
2- 6'
FINISH GRADE UNPAVED AREAS
4' 0 DIA
OR AS APPROVED BY THE
1" PVC COATED
CONTRACTING OFFICER
TRANSFORMER, SINGLE PHASE,
PRECAST REINFORCED CONCRETE
5KVA W/ 120V. SECONDARY
MEDICAL SER S
FUSIBLE HEAVY DUTY SAFETY
RIGID STEEL CONDUIT,
SWITCH, 2P, 240V, 30A, FUSED
PITCH CONDUIT TOWARD
FOR 20A, NEMA TYPE 3R ENCLOSURE
2% 3' OR (4' PREFERRED)
INDICATES BUMPER POST
REVERSE "Y" BRANCH
USING AGENCY
MANHOLE. FOR MULTIPLE
PART CONCRETE CRADLE TO V BEYOND
.:> o.
PROJECT NUMBER
21 " -
CONDUITS MAINTAIN
60
oe. ° =' 0 0`7°
6
3" SEPARATION
I — CAREFULLY COMPACTED SELECT
GRANULAR MATERIAL. EXCAVATION,
TRENCHING & BACKFILLING PER
SECTION 02222 OF SPECIFICATIONS
SINGLE PVC COATED CONDUIT
SAND ENCASEMENT DETAIL
NOT TO SCALE
2500# CONCRETE
6 .
L SEWER DROP PIPE __t�
LEGEND
--- - - - - --
SECTIONAL
POINT UP BRICKWORK
PLAN 2
ON THE INSIDE —
OR UNDERGROUND
FINISH GRADE
and
J r
�
(STREET SURFACE)
2- 6'
FINISH GRADE UNPAVED AREAS
4' 0 DIA
OR AS APPROVED BY THE
d
CONTRACTING OFFICER
TRANSFORMER, SINGLE PHASE,
PRECAST REINFORCED CONCRETE
5KVA W/ 120V. SECONDARY
MEDICAL SER S
FUSIBLE HEAVY DUTY SAFETY
MANHOLE TOP
SWITCH, 2P, 240V, 30A, FUSED
SfAIE AS N<il'
--
FOR 20A, NEMA TYPE 3R ENCLOSURE
2% 3' OR (4' PREFERRED)
INDICATES BUMPER POST
REVERSE "Y" BRANCH
USING AGENCY
6
PART CONCRETE CRADLE TO V BEYOND
DRAWN BY J.M.C. /D ,B.R.
PROJECT NUMBER
21 " -
SEDGE OF UNDISTURBED MATERIAL/
NCCC I DRAFTING
CONCRETE 6 . ,
}2500
30 CUT CURVE OR S"
EQUIVALENT PVC (� '
6" MIN. —
EQUIVALENT PVC OR
45' CUT CURVE
ALL CONCRETE TO BE
?LACED AGAINST FIRM.
aT -RIAL OR SHEETING
- 4 6" 0 TOP OF
AB 3' -6' LONG
hPE LENGTH AS
SHORT AS POSSIBLE
PRECAST REINFORCED CONCRETE
MANHOLE BARRELS
�_ SEWER PIPE
PRECAST REINFORCED
MANHOLE BASE
MANHOLE FRAME & COVER
(SEE SPECIFICATIONS).
AOJUST TO GRADE WITH BRICK.
2 COURSES MM., 4 COURSES
MAX. WITH 3 /! MORTAR JTS.
BED FRAME IN 3 /e' MIN, FULL
MORTAR BED.
3" COAT OUTSIDE WITH
1" CEMENT MORTAR TO
4' BELOW TOP OF PRECAST
PRECAST REINFORCED CONCRETE
MANHOLE BARRELS PER ASTM
C -478
��— REINFORCED POLYPROPYLENE
STEP CAST IN MANHOLE
12" O.C., TYP.
NOTE:
ALL LIFTING HOLES SHALL BE
T PLUGGED WITH NON- SHRINK
GROUT
�— PIPE JOINT PER 2
SPECIFICATIONS
FORM BRICK INVERT
TO FULL HEIGHT OF
3" PIPE, SEE DETAIL
6' CONCRETE SLAB, 2500#
6' SELECT GRANULAR MATERIAL
2 - #4 E.W. IN ADDITION
TO `IRE MESH
—USE DROP CONN. WHEN THIS
DIMENSION EXCEEDS 2' -0"
ELEVATION
DROP SEWER MANHOLE
NOT TO SCALE
N
a
M
Q
0
rn
N
m
0
i
w
7
a
.j
<v
N
N
120 VOLTS -1
I- -- REMOTE MOUNTED
30A SAFETY SWITCH
2
FLOW
METER
1 1 I M F LO W i
20A
n 0 120V
CB - OWER
SET FOR HEATER
FUSE 50 800W
15A T - ( "C—
SET FOR
FUSE 100 ° F FAN
15A T F
— THERMOSTAT
FLOWMETER ENCLOSURE CABIN T
WIRING DIAGRAM
s TWO FLOWMETERS SHO .
INSTALL ONE PER LOCATION
UNLESS OTHERWISE INDICATED.
SEE METER LOCATION PLANS.
PROPOSED EQUIPMENT LAYOU
SCALE: 1 /2 " =1' - O"
(SHOWN WITH TWO FLOWMETERS)
30A SAFETY SWITCH,
FUSED FOR 20A IN A
NEMA 3R ENCLOSURE,
FURNISH W/ HEAVY DUTY
BRASS PADLOCK & TWO
SETS OF KEYS, TYP.
LAMINATED PHENOLIC
NAME PLATE, BLACK
W/ WHITE CORE, ENGRAVED
"120V - 1P, 0
FOR SEWER METER ", TYP— I FOR ALL DISCONNECT 1 N a
SWITCH LOCATIONS
�I
I
i7
a
NOTES:
1. FOR ORIENTATION OF ELECTRICAL
-3 / 2 5
EQUIPMENT WITHIN THE CAST
1 "
ALUMINUM CABINETS SEE E.. -- - -�{
EQUIPMENT LAYOUT LAMINATED
2.
r FOR ENCLOSURE LOCATIONS PHENOLIC
SEE THE CONTRACT PLANS NAMEPLATE
1' -10" 1'-10" io ANCHOR BOLT, I J
2 PER CABINET SEE
BOLTS ANCHO INSTALL AS PER I I NOTE 10
1 AYA MANUF. TEMPLA
GROUND TYP.
ROD
FRONT °
' GROUND ROD, ,
FIN. GRADE 3/4 "x12'
u rn
A1 4W K
IY u u
CLASS "A" CEMENT r o
° CONC. MASONRY I I
(714 i
GRAVEL I
1 7C W/ 8 CONDUCTOR
SHIELDED CABLE FOR FLOWMETER AS
3 REQUIRED, TYP
2' -0" J.
ALL CONDUITS AT THE ENCLOSURE SHALL
BE RIGID STEEL, FOR THE SIZE, QUANTITY
AND DIRECTION SEE THE CONTRACT PLANS
SIDE ELEVATION FRONT ELEVATION
TYPICAL FLOWMETER ENCLOSURE CABINET
2— ^I 1 ", TYP. INSTALL THIS SIDE
OUTBOARD OF
ST.PL. /16, GALV. TRANSFORMER PAD -
3 /16 2 #10 & 1 #10 GRD.
3/18 TYP• IN A 1" PVC COATED
RIGID STL. CONDUIT
3 TO FLOWMETER
' ENCLOSURE CABINET
LEGEND
--- - - - - --
CONDUIT RUN EXPOSED
eat
CONDUIT RUN CONCEALED
� .'•
r�
OR UNDERGROUND
ONW
and
J r
�
FIRE CHIEF
2- 6'
d
4' 0 DIA
DATF 12 AIJGU'SE
d
TRANSFORMER, SINGLE PHASE,
m
5KVA W/ 120V. SECONDARY
PRECAST REINFORCED CONCRETE
MANHOLE BARRELS
�_ SEWER PIPE
PRECAST REINFORCED
MANHOLE BASE
MANHOLE FRAME & COVER
(SEE SPECIFICATIONS).
AOJUST TO GRADE WITH BRICK.
2 COURSES MM., 4 COURSES
MAX. WITH 3 /! MORTAR JTS.
BED FRAME IN 3 /e' MIN, FULL
MORTAR BED.
3" COAT OUTSIDE WITH
1" CEMENT MORTAR TO
4' BELOW TOP OF PRECAST
PRECAST REINFORCED CONCRETE
MANHOLE BARRELS PER ASTM
C -478
��— REINFORCED POLYPROPYLENE
STEP CAST IN MANHOLE
12" O.C., TYP.
NOTE:
ALL LIFTING HOLES SHALL BE
T PLUGGED WITH NON- SHRINK
GROUT
�— PIPE JOINT PER 2
SPECIFICATIONS
FORM BRICK INVERT
TO FULL HEIGHT OF
3" PIPE, SEE DETAIL
6' CONCRETE SLAB, 2500#
6' SELECT GRANULAR MATERIAL
2 - #4 E.W. IN ADDITION
TO `IRE MESH
—USE DROP CONN. WHEN THIS
DIMENSION EXCEEDS 2' -0"
ELEVATION
DROP SEWER MANHOLE
NOT TO SCALE
N
a
M
Q
0
rn
N
m
0
i
w
7
a
.j
<v
N
N
120 VOLTS -1
I- -- REMOTE MOUNTED
30A SAFETY SWITCH
2
FLOW
METER
1 1 I M F LO W i
20A
n 0 120V
CB - OWER
SET FOR HEATER
FUSE 50 800W
15A T - ( "C—
SET FOR
FUSE 100 ° F FAN
15A T F
— THERMOSTAT
FLOWMETER ENCLOSURE CABIN T
WIRING DIAGRAM
s TWO FLOWMETERS SHO .
INSTALL ONE PER LOCATION
UNLESS OTHERWISE INDICATED.
SEE METER LOCATION PLANS.
PROPOSED EQUIPMENT LAYOU
SCALE: 1 /2 " =1' - O"
(SHOWN WITH TWO FLOWMETERS)
30A SAFETY SWITCH,
FUSED FOR 20A IN A
NEMA 3R ENCLOSURE,
FURNISH W/ HEAVY DUTY
BRASS PADLOCK & TWO
SETS OF KEYS, TYP.
LAMINATED PHENOLIC
NAME PLATE, BLACK
W/ WHITE CORE, ENGRAVED
"120V - 1P, 0
FOR SEWER METER ", TYP— I FOR ALL DISCONNECT 1 N a
SWITCH LOCATIONS
�I
I
i7
a
NOTES:
1. FOR ORIENTATION OF ELECTRICAL
-3 / 2 5
EQUIPMENT WITHIN THE CAST
1 "
ALUMINUM CABINETS SEE E.. -- - -�{
EQUIPMENT LAYOUT LAMINATED
2.
r FOR ENCLOSURE LOCATIONS PHENOLIC
SEE THE CONTRACT PLANS NAMEPLATE
1' -10" 1'-10" io ANCHOR BOLT, I J
2 PER CABINET SEE
BOLTS ANCHO INSTALL AS PER I I NOTE 10
1 AYA MANUF. TEMPLA
GROUND TYP.
ROD
FRONT °
' GROUND ROD, ,
FIN. GRADE 3/4 "x12'
u rn
A1 4W K
IY u u
CLASS "A" CEMENT r o
° CONC. MASONRY I I
(714 i
GRAVEL I
1 7C W/ 8 CONDUCTOR
SHIELDED CABLE FOR FLOWMETER AS
3 REQUIRED, TYP
2' -0" J.
ALL CONDUITS AT THE ENCLOSURE SHALL
BE RIGID STEEL, FOR THE SIZE, QUANTITY
AND DIRECTION SEE THE CONTRACT PLANS
SIDE ELEVATION FRONT ELEVATION
TYPICAL FLOWMETER ENCLOSURE CABINET
2— ^I 1 ", TYP. INSTALL THIS SIDE
OUTBOARD OF
ST.PL. /16, GALV. TRANSFORMER PAD -
3 /16 2 #10 & 1 #10 GRD.
3/18 TYP• IN A 1" PVC COATED
RIGID STL. CONDUIT
3 TO FLOWMETER
' ENCLOSURE CABINET
NOTE: HOT -DIP GALVANIZE FRAME
ASSEMBLY AFTER FABRICATION
Lol
�l -6"1
ONNECT SWITCH STAND DETAIL
SCALE: 1 /2 " =1' -0"
1" WEATHERHEAD
2 #8 & 1 #8 GRD.
CONNECT TO 120V POWER
AT TRANSFORMERS
C4x7.5, GALV., TYP.
FIN. GR., TYP.
LOCATE STAND AS DIRECTED
INSIDE OF FENCED –IN
TRANSFORMER BANK AT
MANHOLE RL –M2 ON WRIGHT ST.
#5 0 18 E.W
ELt�
1. ALL EXISTING POLES ARE WOODEN POLES.
2. FURNISH AND INSTALL A 1" PVC COATED RIGID STEEL CONDUIT
W/ 2 # & 1 #10 GRD. TO A MINIMUM OF 10' UP THE POLE AND
UNDERGROUND TO ENCLOSURE. FURNISH WEATHERHEAD ON POLE
CONDUIT. THE CONTRACTOR SHALL COORDINATE THE COMPLETE
INSTALLATION, CONDUIT, WIRE, ENCLOSURE, WATTHOUR METERS, ETC.,
WITH AND TO BOSTON EDISON PFQUIREMENTS.
3. FURNISH AND INSTALL SAFETY SWITCH ON EXISTING OUTDOOR PLYWOOD
BACKBOARD. INSTALL CONDUIT NIPPLE W/ 2 #10 & 1 #10 GRD. BF TWEEN
NEW SAFETY SWITCH AND EXISTING DISTRIBUTION PANEL. WIRE TO EXISTING
DISTRIBUTION PANEL BUS FOR 120V. POWER TO SAFETY SWITCH.
4. FURNISH AND INSTALL SAFETY SWITCH 5' UP ON EXISTING POLE AND
RUN A 1 RIGID STEEL CONDUIT W/ 2 #10 & 1 #10 GRD. FROM THE
SAFETY SWITCH UP THE POLE TO A MINIMUM OF 10' ABOVE GRADE.
FURNISH CONDUIT WITH A WEATHERHEAD AND CONNECT WIRES 10 AN
UNSWITCHED 120 VOLT OVERHEAD STREET LIGHTING CIRCUIT.
5. THE CONTRACTOR SHALL CHECK ALL POWER SOURCES TO VARIFY UNSWITCIAFI)
CIRCUITS AND 120 VOLT" POWER BEFORE INSTALLING ANY ENCLOSURE CABINF I `
ALL POWER SOURCES TO ENCLOSURE CABINETS SHALL BE 120 VOLTS.
6. FURNISH AND INSTALL A 1" RIGID STEEL CONDUIT W/ 2 #10 & 1 #10 GRD.
EXPOSED ON INSIDE WALL OF LABORATORY FROM THE SPARE CIRCUIT
BREAKER IN THE EXISTING PANEL TO A NEW SAFETY SWITCH MOUNTED
APPROXIMATELY 6' ABOVE GRADE ON THE OUTSIDE OF THE BUILDING.
7. FURNISH AND INSTALL A 1" PVC COATED CONDUIT W/ 2 #10 & 1 #10 GRD.
FROM THE EXISTING PANELBOARD (PROVIDE 20A OVERCURRENT DEVICE AT
THIS LOCATION). IF THERE ARE NO SPARE CIRCUIT BREAKERS IN THE
PANELBOARD, EXTEND CONDUIT MOUNTED EXPOSED HIGH UP ON THE OUTSIDI
BUILDING WALL TO A SAFETY SWITCH MOUNTED APPROXIMATELY 6' ABOVE
GRADE ON THE FACE OF THE BUILDING.
8. ALL CONDUITS SHALL BE RIGID STEEL AND AS INDICATED.
I
9. FURNISH AND INSTALL A NEW SAFETY SWITCH ON THE EXISTING ANGLE IRO'!
FRAME USING CORROSION RESISTANT STEEL CHANNEL. ANGLE IRON FRAMI
IS APPROXIMATELY 5' ABOVE GRADE WITH AN EXISTING WIREWAY MOUNTED
BELOW. RUN A 1" PVC COATED CONDUIT W/ 2 #10 & 1 #10 GRD. FROM
THE NEW SAFETY SWITCH TO THE EXISTING WIREWAY AND TAP INTO EXISTII
120 VOLT POWER SOURCE IN THE WIREWAY.
10. CONTRACTOR SHALL COORDINATE FOUNDATIONS WITH ENCLOSURE CABINETS I
FURNISHED
LEGEND
--- - - - - --
CONDUIT RUN EXPOSED
- - - --
CONDUIT RUN CONCEALED
OR UNDERGROUND
ONW
WIRES RUN OVERHEAD
FIRE CHIEF
2- 6'
NOTE: HOT -DIP GALVANIZE FRAME
ASSEMBLY AFTER FABRICATION
Lol
�l -6"1
ONNECT SWITCH STAND DETAIL
SCALE: 1 /2 " =1' -0"
1" WEATHERHEAD
2 #8 & 1 #8 GRD.
CONNECT TO 120V POWER
AT TRANSFORMERS
C4x7.5, GALV., TYP.
FIN. GR., TYP.
LOCATE STAND AS DIRECTED
INSIDE OF FENCED –IN
TRANSFORMER BANK AT
MANHOLE RL –M2 ON WRIGHT ST.
#5 0 18 E.W
ELt�
1. ALL EXISTING POLES ARE WOODEN POLES.
2. FURNISH AND INSTALL A 1" PVC COATED RIGID STEEL CONDUIT
W/ 2 # & 1 #10 GRD. TO A MINIMUM OF 10' UP THE POLE AND
UNDERGROUND TO ENCLOSURE. FURNISH WEATHERHEAD ON POLE
CONDUIT. THE CONTRACTOR SHALL COORDINATE THE COMPLETE
INSTALLATION, CONDUIT, WIRE, ENCLOSURE, WATTHOUR METERS, ETC.,
WITH AND TO BOSTON EDISON PFQUIREMENTS.
3. FURNISH AND INSTALL SAFETY SWITCH ON EXISTING OUTDOOR PLYWOOD
BACKBOARD. INSTALL CONDUIT NIPPLE W/ 2 #10 & 1 #10 GRD. BF TWEEN
NEW SAFETY SWITCH AND EXISTING DISTRIBUTION PANEL. WIRE TO EXISTING
DISTRIBUTION PANEL BUS FOR 120V. POWER TO SAFETY SWITCH.
4. FURNISH AND INSTALL SAFETY SWITCH 5' UP ON EXISTING POLE AND
RUN A 1 RIGID STEEL CONDUIT W/ 2 #10 & 1 #10 GRD. FROM THE
SAFETY SWITCH UP THE POLE TO A MINIMUM OF 10' ABOVE GRADE.
FURNISH CONDUIT WITH A WEATHERHEAD AND CONNECT WIRES 10 AN
UNSWITCHED 120 VOLT OVERHEAD STREET LIGHTING CIRCUIT.
5. THE CONTRACTOR SHALL CHECK ALL POWER SOURCES TO VARIFY UNSWITCIAFI)
CIRCUITS AND 120 VOLT" POWER BEFORE INSTALLING ANY ENCLOSURE CABINF I `
ALL POWER SOURCES TO ENCLOSURE CABINETS SHALL BE 120 VOLTS.
6. FURNISH AND INSTALL A 1" RIGID STEEL CONDUIT W/ 2 #10 & 1 #10 GRD.
EXPOSED ON INSIDE WALL OF LABORATORY FROM THE SPARE CIRCUIT
BREAKER IN THE EXISTING PANEL TO A NEW SAFETY SWITCH MOUNTED
APPROXIMATELY 6' ABOVE GRADE ON THE OUTSIDE OF THE BUILDING.
7. FURNISH AND INSTALL A 1" PVC COATED CONDUIT W/ 2 #10 & 1 #10 GRD.
FROM THE EXISTING PANELBOARD (PROVIDE 20A OVERCURRENT DEVICE AT
THIS LOCATION). IF THERE ARE NO SPARE CIRCUIT BREAKERS IN THE
PANELBOARD, EXTEND CONDUIT MOUNTED EXPOSED HIGH UP ON THE OUTSIDI
BUILDING WALL TO A SAFETY SWITCH MOUNTED APPROXIMATELY 6' ABOVE
GRADE ON THE FACE OF THE BUILDING.
8. ALL CONDUITS SHALL BE RIGID STEEL AND AS INDICATED.
I
9. FURNISH AND INSTALL A NEW SAFETY SWITCH ON THE EXISTING ANGLE IRO'!
FRAME USING CORROSION RESISTANT STEEL CHANNEL. ANGLE IRON FRAMI
IS APPROXIMATELY 5' ABOVE GRADE WITH AN EXISTING WIREWAY MOUNTED
BELOW. RUN A 1" PVC COATED CONDUIT W/ 2 #10 & 1 #10 GRD. FROM
THE NEW SAFETY SWITCH TO THE EXISTING WIREWAY AND TAP INTO EXISTII
120 VOLT POWER SOURCE IN THE WIREWAY.
10. CONTRACTOR SHALL COORDINATE FOUNDATIONS WITH ENCLOSURE CABINETS I
FURNISHED
FAY, SPOFFORD It THORNOIKE, INC.
LEXINGTO MA
COORDINA
SAFETY TCHIEF, OMM
DRAWING NO.:
REPAIR SEWER FORCE MAIN
HANSCOM AIR FORCE BASE, MA. ] Q�l (I
MISCELLANEOUS DE TAIL S – PART 1 EIE
2
COMMUNICATIONS
LEGEND
--- - - - - --
CONDUIT RUN EXPOSED
- - - --
CONDUIT RUN CONCEALED
OR UNDERGROUND
ONW
WIRES RUN OVERHEAD
FIRE CHIEF
FLOWMETER ENCLOSURE CABINET
ARCHITECT
W/ WATTHOUR METER
DATF 12 AIJGU'SE
FLOWMETER ENCLOSURE CABINF T
TRANSFORMER, SINGLE PHASE,
m
5KVA W/ 120V. SECONDARY
MEDICAL SER S
FUSIBLE HEAVY DUTY SAFETY
pT
SWITCH, 2P, 240V, 30A, FUSED
SfAIE AS N<il'
--
FOR 20A, NEMA TYPE 3R ENCLOSURE
•
INDICATES BUMPER POST
FAY, SPOFFORD It THORNOIKE, INC.
LEXINGTO MA
COORDINA
SAFETY TCHIEF, OMM
DRAWING NO.:
REPAIR SEWER FORCE MAIN
HANSCOM AIR FORCE BASE, MA. ] Q�l (I
MISCELLANEOUS DE TAIL S – PART 1 EIE
2
COMMUNICATIONS
CONSTRUCTION MGT
CHIEF, NG SECT.
CHIEF, EN & ENV PLNG BR
BASE CIV IL ENGIM t I
FIRE CHIEF
CORROSION CTRL
ARCHITECT
CIVIL ENGINEER
DATF 12 AIJGU'SE
MEDICAL SER S
ENVIRONMENTAL
ELECTRICAL ENO we
MECHANICAL ENG
SfAIE AS N<il'
--
MXIRD32
USING AGENCY
ENERGY CONSERV.
STRUCTURAL ENO
DRAWN BY J.M.C. /D ,B.R.
PROJECT NUMBER
21 " -
NCCC I DRAFTING
VAUL FIL NUMBER
511LEI -
I
DESCRIPTION I DRAWN APPV'D
DFPARTMENT OF THE NR FORCE
847 SPTG / CECE
BASE CIVI ENGINEERING SQUAD
U