HomeMy WebLinkAbout2013-07-30 CONCOM-min
TOWN OF LEXINGTON, MASSACHUSETTS
CONSERVATION COMMISSION
MINUTES
Tuesday, July 30, 2013
7:30 P.M.
Parker Room, Town Office Building
1625 Massachusetts Avenue
Chair Joyce Miller opened the meeting at 7:33 pm in the Parker Room of the Town
Office Building.
Commissioners Present: Joyce Miller, Stew Kennedy, Jane Warren, and Duke Bitsko
Commissioners Absent: Phil Hamilton, David Langseth, and Dick Wolk
Others Present: Michelle Tassi, Community Development Department Assistant
7:33 pm Meeting – RDA, Interstate 95 Northbound & Southbound Interchanges
DET# 13-14
Proposed traffic sign replacement project from Wellesley to Lexington
within the 100-foot Buffer Zone and 200-foot Riverfront Area
Documentation: RDA Application 7/10/13
Present for the Applicant: Andrea Norton, MassDOT District 4
Ms. Norton proposed the guide sign replacement project along the
Waltham/Lexington line. The replacement is due to safety concerns and
the signs typically have a shelf life of 25 years. The existing footings for
the signs will remain in place and the new footings will be placed adjacent
to them.
Comments from the Commission as follows:
Mr. Bitsko asked if the erosion control would be comprised of straw or
compost. Mr. Kennedy commented that in some locations there is no sign
existing. Mr. Bitsko asked if a pre-construction meeting was held and
suggested that no excavated soil be left on site. Mr. Bitsko asked what the
proposed seed mix would be. Ms. Norton replied that it was similar to the
project in the past.
Motion made and seconded to issue a negative determination with
conditions, 4-0 in favor.
7:49 pm Hearing – NOI, 361 North Emerson Road
DEP# 201-905, BL 865
Construction of an addition to an existing single-family dwelling within
the 100-foot Buffer Zone
Documentation: NOI Application 7/10/13
Present for the Applicant: Dave Sperduto, Wetlands Identification and
Gabriel Cheung, Homeowner
Mr. Sperduto proposed the construction of a 26’ x 24’ addition on the east
side of the lot. The asphalt driveway would be extended to the addition
and the runoff from both would be infiltrated. Mr. Sperduto explained that
the addition is proposed to be 47’ away from the wetlands with 75 square
feet within the 50’ setback. The lawn area within the 25’ no-disturb zone
will be allowed to re-vegetate and naturalize.
Comments from the Commission as follows:
Mr. Kennedy stated that bounds markers need to be placed along the 25’
buffer zone. Mr. Bitsko asked for clarification if two additions were being
constructed because only one was shown on the plan. Mr. Sperduto
answered that the other addition is not shown on the plan because it is
outside the 100’ buffer zone. Mr. Bitsko recommended that the second
addition be shown on the plan to make sure there is no associated grading
or patios proposed. Mr. Bitsko stated that an operations and maintenance
plan for the infiltration system is needed, as well as a note on the plan for
the lawn area to naturalize. Ms. Miller read the engineering report. Mr.
Kennedy advised the homeowner that if anything changes on the plan,
future approval will be needed from the Conservation Commission.
Motion made and seconded to continue the hearing to August 13, 2013 at
7:30pm at the request of the applicant, 4-0 in favor.
8:13 pm Hearing – NOI, 92 Adams Street
DEP# 201-904, BL 864
Construction of an addition and renovations to an existing single-family
dwelling within the 100-foot Buffer Zone
Documentation: NOI Application 7/10/13
Present for the Applicant: Scott Smyers, Oxbow Associates and
Buaboocha Semapakdi, Homeowner
Mr. Smyers proposed the construction of an addition which will be 77’
away from the wetlands at its closest point. An infiltration system is
proposed to account for the impervious area added.
Comments from the Commission as follows:
Mr. Kennedy asked if a deck was proposed. Mr. Smyers replied that a
deck was proposed. Mr. Kennedy commented that the downspout detail
needs to be shown on the plan. Ms. Warren asked if the new addition and
driveway were accounted for by the infiltration system. Mr. Smyers
replied that the addition will be infiltrated, but that the driveway was not a
part of this project. Mr. Bitsko commented that an operations and
maintenance plan for the infiltration system needed to be submitted. Mr.
Kennedy asked for clarification on the sediment filtermitt and if compost
would be used on the inside. Mr. Bitsko suggested that if a wood compost
or straw is used, it should be noted and removed off site when work is
completed. Ms. Miller read the engineering report.
Martin Schatzoff of 27 Brent Road voiced his concern about the margin of
error in the drainage calculations and flooding in the area. Mr. Smyers
responded by explaining the infiltration system accounting for runoff. Mr.
Bitsko clarified how the drainage calculations are determined.
Stephen Fish of 25 Brent Road described the area and provided evidence
of flooding.
Motion made and seconded to close the hearing, 4-0 in favor.
9:04 pm Cont. Hearing – NOI, 219 Lincoln Street
BL 861
Demolition and construction of a new single-family dwelling and
replication of a wetland within vegetated wetlands and its 100-foot Buffer
Zone
Documentation: NOI Application, Site Plan – Proposed Redevelopment,
and Stormwater Management Report 5/15/13, Revised Plans Letter and
Site Plan – Proposed Redevelopment 6/14/13, Letter, Revised Site Plan –
Proposed Redevelopment, Figures A & B Post and Pre-Development, and
Drainage Summary Report 6/27/13, Abutter Letter 6/28/13, Revised Letter
and Site Plan – Proposed Redevelopment 7/2/13, Revised Letter and Site
Plan – Proposed Redevelopment 7/12/13, Revised Letter and Site Plan –
Proposed Redevelopment 7/26/13
Present for the Applicant: Alton Stone, Alton Engineering and Abbas
Amiri, Potential Owner
Mr. Stone proposed the elevation of the dwelling to be dropped by 2’ due
to zoning requirements, the replication wetland is to be moved out to the
drip line of the trees, and the second drain line will be connected to the
wetland. All contour lines were labeled, 1’ contours were placed near the
retaining wall, and the pipe would be reconnected. Mr. Stone gave a
description of the topography on the neighboring property and the tree and
planting plan.
Comments from the Commission as follows:
Ms. Warren suggested that the inlets be kept free of debris.
Mr. Zhao of 229 Lincoln Street raised concerns about the elevation of the
replication wetland.
Mr. Bitsko asked for clarification on the elevation of the existing pipe and
drain pipe.
Christian Haddad of 219 Lincoln Street spoke to the improvement that this
project will bring to the area.
Mr. Bitsko explained the process for the order of conditions and the
certificate of compliance.
Motion made and seconded to close the hearing, 4-0 in favor.
PENDING MATTERS
9:42 pm Motion made and seconded to accept the reduced Tri-Partite Agreement of
$16,660.00 for DEP# 201-758, BL 716, Roadway off Blueberry Lane, 4-0
in favor.
9:43 pm Review and Approve Plan Changes: Inn at Hastings Park, DEP# 201-837,
BL 795
Gary Larson, landscape architect and Luis Perez, construction manager
were present for this discussion. Mr. Larson described all of the changes
that were outlined in the list and letter, referring to items “A through O.”
Motion made and seconded to approve the plan changes for the Inn at
Hastings Park, DEP# 201-837, BL 795, 4-0 in favor.
10:14 pm Discuss Johnson Farm open space and interests of the Commission
The Commission decided to postpone this discussion until the meeting on
August 13, 2013.
10:16 pm Motion made and seconded to
approve the Buffer Zone planting plan for 482
Bedford Street, DEP# 201-894, BL 853, 4-0 in favor.
Motion made and seconded to issue an Order of Conditions:
Interstate 95,
, 4-0 in favor.
DEP# 201-902, BL 862
Motion made and seconded to issue a partial Certificate of Compliance for
14 Winthrop Road, DEP# 201-885, BL 844, 4-0 in favor.
10:17 pm Motion made and seconded to approve the minutes from July 16, 2013,
4-0 in favor.
10:18 pm
Reports: Bike Advisory, Community Preservation Committee, Land Steward
Directors, Housing Partnership, Tree Committee, Land Management, Land
Acquisition, etc.
th
Ms. Warren reported that she would be away from August 7-15. Mr. Bitsko
th
reported that he would be away from August 9-20. Ms. Tassi reported that there
th
would be a quorum issue for the meeting on August 13. The Commission
th
decided to hold a special meeting on August 6 for certain agenda items.
10:19 pm The Commission scheduled a site visit for the Lincoln Field pathway
th
reconstruction on Monday, August 5 at 6:00 pm.
10:21 pm Motion made and seconded to adjourn the meeting, 4-0 in favor.
Respectfully submitted,
Michelle Tassi
Community Development Department Assistant