Loading...
HomeMy WebLinkAboutRS-708Bt c FLUSHING CONNECTION HYDRANT W/ 6" G.V. & BOX, 6" D.I.C.L. PIPE AND 8 D.I.C.L. HYDRANT TEE 145' 4 ! j 1 3 k 1 c, D l � � i n I I � 8" D.I.C. L. CAP '— — AND NIPPLE �� X525 m i V BUFFER Z4e4E e? _ — ua2 _ g0 5 i �`�� 108�� GUST BLOCK (TYP 8" GATE VALVE & BOX TEMPORARY BLOW —OFF /SAMPLE LINE. (1" TAPPING SADDLE AND CORP.; COPPER TUBING; 1" CURB STOP) (TYP.) (TO BE REMOVED AS DIRECTED BY THE ENGINEER) 147 1Y2 PC200 PVC P.S. SERVICE STUB, PLUGGED (TYP.) 1Y2" CHECK VALVE (TYP.) 1X2" BALL VALVE AN(3 POOL BOX (TYP.) \ cvNC a\ T n� \L GARDEN ! —_ _ 19 +00 f 1" TYPE K COPPER WATER SERVICE W/ CORPORATION STOP, COPPER TUBING, CURB STOP AND SERVICE BOX. (TYP. ALL SERVICES) (EXACT LOCATION TO BE SET IN FIELD BY ENGINEER.) T = 1Y2" PC200 PVC — PRESSURE SEWEf k � SSE #443 ` u= 18i.7 HYDRANT W/ 6" G.V. & BOX, 6" D.I.C.L. PIPE AND 8 "x6" D.I.C.L. HYDRANT TEE 2 "x 1Y2" /\ KtUUCtK�r 5 --7 - V I /9 Ef ` )0 9L- - 15 +0 = CRUSHED CATCH BASIN INLETS STONE 12" S LOPE 6" GEOTEXTI'LE FILTER FABRIC DEWATERING HOSE SUPPORT 2 " -3" CRUSHED STONE STONE WALL t 7 �— 8" D.I.C.L. °� WATER MAIN 1 8 GATE $" D.I.C.L: WATER MAIN I VALVE `D 100' BUFFER ZONE AN BOX BENCHMARK —TBM 7 SPK 1' UP IN U.P. #81 ELEVATION 178.78 PLAN SCALE: 1"=40' ` / \\ � ,—. �� DGE OF RESERVOIR i EDGE OF BORDERING VEG. WETLAND (B.V.W.) EDGE OF RESERVOIR #3 REBAR ANCHOR 48" MIN. FENCE POST (2 /BALE) (2 "x 2" 6' 0. C.) DOUBLE BALED AT 36" MIN. FENCE POST (2 "x 2", 2 PER BALE) J-1 NAY BALES (TYP.) PAVEMENT HOLES TO BE FILLED WITH BITUMINOUS CRACK FILLER AND SAND SUBSEQUENT TO HAY BALE REMOVAL PAVEMENT SILTATION BARRIER N. T. S. FILTER FABRIC - WIRE MESH — %" —Y2" CRUSHED STONE 4 i X ' \ r \ ! I I DEL_ u 0 i _._��� P -8/ - 3 +00 14 -+-00 3 +00 HSI 4459 S,!LL —S1B G4 12 "MII EMBED FILTER CLO TH INTO GROUND (MIN. 6") SILTATION BARRIER N.T.S. i m 1 1Y" PC200 PVC P.S. SERVICE STUB, �? PLUGGED (TYP.) i \. 1Y2" CHECK \' VAL /E (TYP.) \ 1t 1X2 BALL VALVE ` ANC BOX (TYP.) \ I 2" FIC200 PVC PRESSURE SEWER \ _ T 14 +00! O0 - -LE( 5: 1 +C)0 — P. X 10 1 00 i ��6a' Ikn4a>� HYDRANT W/ 6" G.V. & BOX, 6" D.I.C.L. PIPE AND 8 "x6" D.I.C.L. HYDRANT TEE 2" PC200 PVC PRESSURE 22 +00 SEWER l 9 00 S TONE WAt;_ - _ Ljj +00 SI N_ L 6 +00 1 /—HAYBALES DEWATERING BASIN N.T.S. TOWN OF LEXINGTON, MASSACHUSETTS 5 � G1 r ENGINEERING DIVISION SEWER & WATER MAIN CONSTRUCTION .,: 3NCEN TuT ;, 4 LINCOLN STREET t9//�� S B tt fL 1 STA. 9 +13 TO STA. 20+19 T TUTELA ENGINEERING - ASSOCIATES, INC. ENGINEERS* PLANNERS -ARCHITECTS WILMINGTON, MA PROVIDENCE, RI 1 9/14/01 JR AS BUILT WJM DESIGNED BY JMI SCALE A J'� DATE BRUARY, 2001 . N0. DRAWN BY WRM /JMI DATE BY DESCRIPTION APPD APPROVED REVISIONS CHECKED WJM JOB No 37 SHEET 4 OF 7 SHEETS L ou 000 NOW HYDRANT W/ 6" G.V. & BOX, 6" D.I.C.L. PIPE AND 8 "x6" D.I.C.L. HYDRANT TEE 2" PC200 PVC PRESSURE 22 +00 SEWER l 9 00 S TONE WAt;_ - _ Ljj +00 SI N_ L 6 +00 1 /—HAYBALES DEWATERING BASIN N.T.S. TOWN OF LEXINGTON, MASSACHUSETTS 5 � G1 r ENGINEERING DIVISION SEWER & WATER MAIN CONSTRUCTION .,: 3NCEN TuT ;, 4 LINCOLN STREET t9//�� S B tt fL 1 STA. 9 +13 TO STA. 20+19 T TUTELA ENGINEERING - ASSOCIATES, INC. ENGINEERS* PLANNERS -ARCHITECTS WILMINGTON, MA PROVIDENCE, RI 1 9/14/01 JR AS BUILT WJM DESIGNED BY JMI SCALE A J'� DATE BRUARY, 2001 . N0. DRAWN BY WRM /JMI DATE BY DESCRIPTION APPD APPROVED REVISIONS CHECKED WJM JOB No 37 SHEET 4 OF 7 SHEETS