Loading...
HomeMy WebLinkAboutRS-713A2"C 4-#3/0 (120/208V) & 1 " C, 4 #12 (120VAC CKTS), 1 #12 GND & 8 #14 (ALARMS) NEW PUMP "T ^" ENTRANCE TUBE (NOTE EXISTING UG CONDUIT, NEW 4 -300 KCMIL EXISTING BECO u TRANSFORMER EXISTING BECO HANDHOLE NEW GROUND ROD- H YD GUARD RAIL TE STAIRS AILING HAYDEN AVENUE SITE PLAN SCALE: 1"=8' 120/208V, 30, 6OH-Z SERVICE FROM EXISTING BECO TRANSFORMER EXISTING UG CONDUIT, NEW 4 - #3/0 3/4 "C, 1 #4 GN METER SOCKET ( i GROUND ROD i i i i i i RECEPTACLE i TELEMETRY (NOTE 1) L j 1"C' 2 #12 (120 VAC) 1#12 GND & 8 #14 (ALARMS) 1 "C, TELEPHONE SERVICE-, EXISTING UG CONDUIT NEW TELEPHONE SERVICE FROM HANDHOLE 2 "C, 4 - #3/0 TO PUMP STATION CONTROL PANEL 1 4 #12 (120 VAC CKTS), 1 #12 GND & 8 #14 (ALARMS) TO PUMP STATION CONTROL PANEL SINGLE LINE DIAGRAM N.T.S. I EXISTING PUMP STATION TO BE ABANDONED EXISTING UG CONDUITS, (5), - REMOVE WIRES SERVICE CABINET ON EXISTING CONCRETE PAD (NOTE 2) I EXISTING UG CONDUIT NEW TELEPHONE SERVICE WIRES EXISTING TELEPHONE HANDHOLE OUTFALL STRUCTURE 3/4 "C, 1#4 GND MAIN CIRCUIT BREAKER SERVICE CABINET 2 "C, 4 - #3/0 SURGE 225 200 2 "C, 4 - #3/0 i ( i ( i i i i "C, 4 #3/0 & 1 # GND MMINUAL TRANSFER SWITCH i ( i GENERATOR RECEPTACLE IV 3/4 "C 2 #12 & 1#12 GND NOTES: 1. NOTED TELEMETRY EQUIPMENT TO BE REMOVED FROM THE EXISTING STATION AND INSTALLED UNDER DIVISION 16. MAKE ALL NECESSARY CONNECTIONS. 2. DISCONNECT AND REMOVE THE EXISTING SERVICE CABINET. FURNISH AND INSTALL THE NEW SERVICE CABINET ON THE EXISTING CONCRETE PAD AS SHOWN. EXTEND EXISTING UNDERGROUND ELECTRIC AND TELEPHONE SERVICE CONDUITS TO EQUIPMENT SHOWN. MAKE NEW UNDERGROUND CONDUIT PENETRATIONS INTO THE SERVICE CABINET END SHEET USING WATERTIGHT CONDUIT FITTINGS. INSTALL THE METER SOCKET (NORTH END) AND THE GENERATOR RECEPTACLE (SOUTH END) ON THE EXTERIOR OF THE CABINET END SHEETS USING NEOPRENE GASKETS TO SEAL MOUNTING BOLT AND CONDUIT PENETRATIONS WATERTIGHT. 3. MAKE CONNECTIONS TO CONDUIT FITTINGS PROVIDED ON THE PUMP STATION ENTRANCE TUBE AND EXTEND WIRES IN THE RISER CONDUITS PROVIDED IN THE ENTRANCE TUBE BY THE STATION MANUFACTURER. MAKE ALL NECESSARY CONNECTIONS AT THE PUMP STATION CONTROL PANEL. 4. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENT TO MAINTAIN SEWAGE PUMPING OPERATION AT ALL TIMES. SCHEDULE THE WORK TO MINIMIZE THE FREQUENCY AND DURATION OF ELECTRICAL SYSTEM OUTAGES. JUSTIN L MAGEE No. 25695