HomeMy WebLinkAboutRS-713A2"C 4-#3/0 (120/208V)
& 1 " C, 4 #12 (120VAC CKTS),
1 #12 GND & 8 #14 (ALARMS)
NEW PUMP "T ^"
ENTRANCE TUBE (NOTE
EXISTING UG CONDUIT,
NEW 4 -300 KCMIL
EXISTING BECO u
TRANSFORMER
EXISTING BECO
HANDHOLE
NEW GROUND ROD-
H YD
GUARD RAIL
TE STAIRS
AILING
HAYDEN AVENUE
SITE PLAN
SCALE: 1"=8'
120/208V, 30, 6OH-Z SERVICE
FROM EXISTING BECO TRANSFORMER
EXISTING UG CONDUIT,
NEW 4 - #3/0
3/4 "C, 1 #4 GN
METER
SOCKET
(
i
GROUND ROD i
i
i
i
i
i
RECEPTACLE
i
TELEMETRY
(NOTE 1) L j
1"C' 2 #12 (120 VAC)
1#12 GND & 8 #14 (ALARMS)
1 "C, TELEPHONE SERVICE-,
EXISTING UG CONDUIT
NEW TELEPHONE
SERVICE FROM
HANDHOLE
2 "C, 4 - #3/0
TO PUMP STATION
CONTROL PANEL
1 4 #12 (120 VAC CKTS),
1 #12 GND & 8 #14 (ALARMS)
TO PUMP STATION CONTROL PANEL
SINGLE LINE DIAGRAM
N.T.S.
I
EXISTING PUMP STATION
TO BE ABANDONED
EXISTING UG CONDUITS, (5),
- REMOVE WIRES
SERVICE CABINET ON
EXISTING CONCRETE PAD
(NOTE 2)
I EXISTING UG CONDUIT
NEW TELEPHONE
SERVICE WIRES
EXISTING TELEPHONE
HANDHOLE
OUTFALL
STRUCTURE
3/4 "C, 1#4 GND
MAIN CIRCUIT
BREAKER
SERVICE CABINET
2 "C, 4 - #3/0
SURGE
225
200
2 "C, 4 - #3/0
i
(
i
(
i
i
i
i "C, 4 #3/0 & 1 # GND
MMINUAL
TRANSFER
SWITCH i
(
i
GENERATOR
RECEPTACLE
IV 3/4 "C 2 #12
& 1#12 GND
NOTES:
1. NOTED TELEMETRY EQUIPMENT TO BE REMOVED FROM THE EXISTING STATION
AND INSTALLED UNDER DIVISION 16. MAKE ALL NECESSARY CONNECTIONS.
2. DISCONNECT AND REMOVE THE EXISTING SERVICE CABINET. FURNISH AND
INSTALL THE NEW SERVICE CABINET ON THE EXISTING CONCRETE PAD AS
SHOWN. EXTEND EXISTING UNDERGROUND ELECTRIC AND TELEPHONE SERVICE
CONDUITS TO EQUIPMENT SHOWN. MAKE NEW UNDERGROUND CONDUIT PENETRATIONS
INTO THE SERVICE CABINET END SHEET USING WATERTIGHT CONDUIT FITTINGS.
INSTALL THE METER SOCKET (NORTH END) AND THE GENERATOR RECEPTACLE (SOUTH
END) ON THE EXTERIOR OF THE CABINET END SHEETS USING NEOPRENE GASKETS
TO SEAL MOUNTING BOLT AND CONDUIT PENETRATIONS WATERTIGHT.
3. MAKE CONNECTIONS TO CONDUIT FITTINGS PROVIDED ON THE PUMP STATION
ENTRANCE TUBE AND EXTEND WIRES IN THE RISER CONDUITS PROVIDED IN THE
ENTRANCE TUBE BY THE STATION MANUFACTURER. MAKE ALL NECESSARY
CONNECTIONS AT THE PUMP STATION CONTROL PANEL.
4. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE REQUIREMENT TO MAINTAIN
SEWAGE PUMPING OPERATION AT ALL TIMES. SCHEDULE THE WORK TO MINIMIZE
THE FREQUENCY AND DURATION OF ELECTRICAL SYSTEM OUTAGES.
JUSTIN
L
MAGEE
No. 25695