Recreation Committee
Minutes of Meeting of August 28, 2013
A meeting of the Recreation Committee was held on Wednesday, August 28, 2013 at 7:00 p.m, in the
Recreation Office at the Town Office Building.
Members Present: Rick DeAngelis, Lisah Rhodes, Wendy Rudner, Sandra Shaw, and Howie Vogel
Members Absent: None
Staff Present: Karen Simmons, Director of Recreation, Chris Filadoro, DPW Superintendent of
Public Grounds, and Peter Coleman, Recreation Supervisor
Others Present: Hank Manz, Board of Selectmen Liaison and Wendy Manz, Capital Expenditures
Committee Liaison, and Eileen Entin, ACROSS Lexington
1. Citizens and Other Boards: none
2. Meeting minutes from June 19 2013, July 17 2013, & July 29 ", 2013
Wendy Rudner moved and Lisah Rhodes seconded acceptance of the Recreation Committee
Minutes from June 19, 2013, July 17, 2013, and July 29, 2013. The Recreation Committee voted
5 -0 to approve the motion and accept the meeting minutes as presented.
3. Liaison Reports
Lincoln Park Subcommittee
• Wendy Rudner distributed notes from the Lincoln Park Subcommittee meetings
that were held on June 26, 2013 and July 24, 2013. Karen Simmons reminded
the Recreation Committee that she is working with Wes Wirth and the Town
Webmaster to create a webpage for the Lincoln Park Subcommittee. The LPSC
will provide information for the webpage and the Recreation Department staff
will post the information on the webpage.
• Hanle Manz reported that funding is still needed before the restroom project at
Lincoln Park can be completed.
4. ACROSS Lexington
Eileen Entin gave a presentation on the proposed second Accessing Conservation land,
Recreation areas, Open space, Schools, and Streets in Lexington (ACROSS Lexington) route,
which is part of the Greenways Corridor Committee. The pilot route was completed in October
2012. This 5 '/z mile route is located in the northern part of Lexington and includes such areas as
the Minuteman Bikeway, Lower Vine Brook, Willard's Woods, the Diamond Middle School, and
Town of Lexington
Recreation Committee
1625 MASSACHUSETTS AVENUE • LEXINGTON, MASSACHUSETTS 02420
Parker Meadow. The proposed second route would be 4 '/2 miles in length and include such
areas as Depot Square, the Center Recreation Complex, Lincoln Park, Bridge School, the Old
Reservoir, the Clarke Middle School, and Upper Vine Brook. During the presentation, Ms. Entin
requested authorization and permission to install new ACROSS Lexington signs on the proposed
route. Howie Vogel made the motion the motion that "the Recreation Committee approves the
ACROSS Lexington proposal for signs to be installed on the second route upon approval by the
Director of Recreation and DPW Superintendent of Public Grounds /Tree Warden. Lisah Rhodes
seconded this motion and the Recreation Committee voted 5 -0 to approve the motion.
5. Recreation 5 -Year Capital Plan --- FY2015- FY2019
Karen Simmons, Director of Recreation, began the discussion by providing the Recreation
Committee with an update on the status of the FY2014 capital projects. The contract for the
resurfacing project at the Lincoln Park playground had been awarded and the project should be
completed in mid - September. The resurfacing project on the Lincoln #1 synthetic turf field is
scheduled to begin the last week of October. The project at the Skate Park is a work in progress
and the new equipment should be installed by ,Spring 2014. The annual park improvement is
scheduled for Sutherland Park this year and should be completed this fall. Lastly, the dredging of
the lower irrigation pond at Pine Meadows is scheduled to be completed in early winter.
Ms. Simmons distributed a draft summary dated August 21, 2013 of the proposed Recreation 5-
Year Capital Plan for FY2015 — FY2019. Ms. Simmons reviewed the recommended Recreation
5 -year capital plan. The proposed FY2015 capital projects include the resurfacing of the Lincoln
42 synthetic turf field, the annual park improvement designated this year for the multi- purpose
field at the Clarke Middle School, removal of and installation of a new playground at Garfield
Park, resurfacing the Gallagher and Clarke tennis courts, and purchasing a new aerator and utility
vehicle for Pine Meadows. After a brief discussion, Rick DeAngelis moved to approve the
Recreation 5 -Year Capital Plan. Sandra Shaw seconded this motion and the Recreation
Committee voted 5 -0 to accept the Recreation 5 -Year Capital Plan.
Football Field Project Update
Chris Filadoro reported that DPW and Recreation Department staff, Stantec representatives, and
the contractor recently did a walkthrou.gh at the football field. The grass is coming in well
without much compaction. The Town is scheduled to accept the field on Monday, September 9`
and there will be a one -year warranty on the field. The first Lexington High School home varsity
football game is scheduled for Thursday, September 12
The Recreation Committee briefly discussed the condition of the Center 41 baseball field. The
field is better than before the project was completed, as evidenced by the Lexington 300 Old
Time Baseball Game that was played at Center #1 during Memorial Day weekend despite a
significant amount of rain that week. With that being said, the field does have compaction issues,
which can be attributed to the weather during construction. Mr. Filadoro is in the process of
creating a maintenance program for Center #1 /Center #2.
7. Recreation Report
Karen Simmons reported on the following:
• There have been some excessive wear spots on the Center Track that have required a new
coat and binding. The track was resurfaced last fall and is under warranty for one more
year.
Todd Cataldo will be on the agenda for the September meeting. A private group is
looking to install lighting at one of the Little League fields in town.
2
Edits and changes are being made to the strategic plan based on the feedback received
from the Town Manager. The goal is to have the strategic plan completed by the end of
October.
® The Recreation Department, Human Services Department, and Cary Library recently
made presentations to the Community Center Advisory Committee. The architect is
scheduled to present its interim plan to the Board of Selectmen on September 23 The
current plan is for the Human Services Department and Recreation Department to move
into the community center in early 2014.
S. Barks Report
Chris Filadoro, Superintendent of Public Grounds, reported the following:
• Some work on the multi - purpose field at Clarke, including topdressing some low areas,
was completed last week to make the field more playable for the upcoming fail season.
• Fibar was added to the playground at Kinneens Park. The next playground to receive
fibar is Rindge Park.
The park improvement project at Sutherland Park will go out to bid in September and be
completed in late October /early November.
The field layouts for the fall season have been completed.
The outfield fence between Center #1 /Center #2 has been taken. down.
New Business
Howie Vogel informed the Recreation Committee that he will be moving out of Lexington at the end of
the year and will be resigning from the Recreation Committee in December.
The next meeting of the Recreation Committee will take place on Wednesday, September 18 at 7:00
p.m. in the Town Office Building Parker Room. The August 28, 2013 meeting adjourned at 8:45 p.m.
The following documents /exhibits distributed or discussed at the meeting are attached:
• Lincoln Park Subcommittee Meeting Notes
• ACROSS Lexington Presentation
• FY2015- FY2019 Recreation 5 -Year Capital Plan
Respectfully Submitted,
Peter Coleman
Recreation Supervisor
Signage Plan Recreation Area
ax
August 2r 2013
Proposed 2nd ACROSS Lexington Route
Presentation for:
Recreation Committee
by: Greenway Corridors Committee
Rick Abrams &Eileen Entin
Tuesday, August 26, 13
J
r Summarize ACROSS Lexington to -date
Ot Show some example signage at Diamond
4, Present new (2nd) route
Review signage plan and locations
Request permission for October installation
G
Tuesday, August 20, 13 2
Prot Route- Complete Oct 2012
ACROSS
LEXINGTON
YVIti W.ALRa55L£ %I MGT9NARG
Accessing Conservation land,
Recreation areas, Open space,
Schools and Streets
PILOT ROUTE - 5.5 MILES
Route divided into 0.5 mile (70 minute) increments
ACROSS Lexington will be a network of well- marketl
routes that will link many parks of the Lex nglon
only. Eventually nearly 40.miles of routes
Will he created. T provide feedback or for more
information, visit: www.acrosslexinciton.oro
Legend
ACROSS Lexington Pilot Route
Minuteman Commuter Bikeway
Trail on conservation land
-- Trail on other land
Street
School Building
Open Space
Lexington - Conservation
Lexington - RecreationlSchool
Lexington - Other Municipal
Pot, pw.ded by Ire orrisn or ceog'UN, and Envaenm -rl-I
Infom nrn 154 ❑rzT nlIi V., nr rd� -nse lls
c�IMd 6111ce ofo n c ' i Afeirsan] the Iconul LeMngton.
The Inrormalmn is —w
p -I -,(- es a rkasonnbly o l thld fiorrl
Thell renoe, but is non inlena ed E rep: esanl auNolitatll'e local'�on.
The Town A Lercingtrzn shall not ho he -Id res�rznsihle ter the accuracy or
rrv5hsk of these tlafa.
,yF
F�
e I
ti
KINRFN C „�W ILL4R
PARK u r
�i'. nnrvcar �cw
s
�aa• ��
�J
� c
s � Sro
r ^ •ry
- HILLO - r !'
!!r'''��� '!
I I
Mlles
ts.000
An Oil iative of the Lexington Greenways Corridor CcmmilIee
Tuesday, August 20, 13 3
t
a
PAKX �2 .�1
t
r
y ti
PIF.APOW'
a� Y
A
.. `
,
f
0RrIRYIM
o,l
VIN
6
G FPN
Ems`
� eILFR'f
�9
� c
s � Sro
r ^ •ry
- HILLO - r !'
!!r'''��� '!
I I
Mlles
ts.000
An Oil iative of the Lexington Greenways Corridor CcmmilIee
Tuesday, August 20, 13 3
Slight Change in Signage
New version- w /routes Current version- no routes
L E X I N G T O N
A B..
I N G T 0 N
route(s) www.ACROSSLEXINGTON.ORG
www.acrosslexington.org
Revision- same width, 1 inch taller to
fit route letters. URL larger too.
weatherproof vinyl letters
Tuesday, August 20, 13
4
Proposed 2nd ACROSS Lexington Route
����
Ave Tv
Munroe
C enter Id Cemetery
ti
V
LEXINGTON
Lincoln rk
r
A
The 01c A
r,ax�e� Rd
Tuesday, August 20, 13
Upper
Vine bra
tz�' moe
IP I
Franklin
Fiplrf
- M
5
Signage examples
using existing
infrastructure
Tuesday, August 20, 13 6
-gal
.'. -
Signage examples
using new posts
Tuesday, August 20, 13 7
irk Drive Center
creation Complex:
Logo
Logo on wooden
rail
Tuesday, August 20, 13 8
v
Vorthen Road from Center
baseball field
°E
Install post
with logo
Install post
with logo (see below)
Tuesday, August 20, 13
Install post
with logo
0
Park Entrance
irthen Load
=l i s t
Tuesday, August 20, 13 10
e '+���� �°"�►.— icy."' _.
.. ..
Path at Lincoln Park
Install post
with loge
Use existing post
or install new one nearby
Tuesday, August 20, 13 11
Path at Lincoln Park
Use existing post
Logo on tree
Tuesday, August 20, 13 12
Lincoln path approaching
Middleby road
on way to Bridge School
logo
I P
L
4
I
I
I
Install post
with logo
Tuesday, August 20, 13 13
ching the old Res
Install post
with logo
logo on fence -
Tuesday, August 20, 13 14
1
ping along the beach
.de of the old Ides
j
logo on fence
Tuesday, August 23, 13 15
Tuesday, August 20, 13
16
approaching Clarke
nis Courts at Clarke
Install post
with logo or
use existing
stainless steel
box
.4
Tuesday, August 20, 13 17
I
Install post
with logo
Tuesday, August 20, 13 18
i
bridge at Clarke
;o on tree
[nstall post
with logo
Logo on post
Tuesday, August 20, 13 19
1, /atIr3
Lincoln Park Sub - committee — Minutes June 6, 2013
Committee present — David Williams, Chairman, Bob Pressman, Lynne Wilson
Also present -- Vanessa Tropeano and Miles Connors, Parterre, Wesley Wirth, Landscape Architect,
Wendy Rudner, Recreation
David Williams opened the meeting at 4:35 pm. The minutes of the May 16, 2013, were approved as
written.
Vanessa reported that weed whacking was needed along the path. Along the boardwalk cardinal flower
and joe pye weed have been planted. Bob Barnard was weeding last week, and she will ask him to do
the weed whacking on the first sunny day. She has talked to him about the cost for widening of the
Worthen Road section of the path but has not heard back. She said that roti has pruned the diseased
cherry trees which should extend their life. The dead swamp oak at the bike path entrance will be
removed. She also reported that additional anemones and May apples will be planted in two weeks.
Bathrooms — David Williams, in the absence of Brian Kelley, reported that there was no new
information, but work was continuing.
Conservation — Miles Connors and Brian Kelley went to Conservation two weeks ago regarding invasive
plant management. Conservation asked for a site visit which occurred Saturday, June 1 and lasted three
hours. Miles, Brian and Wesley were present. On Tuesday, June 4, Conservation gave their approval for
the management plan for a period of one year. They are very interested in the control of cardamine
impatiens which we have been hand pulling and of phragmites.
Poison Ivy — Vanessa reported that it is emerging around the azalea glade. David Williams will contact
the gentleman who has handled control in the past.
Granite Forest— Wes will continue to try to get prices.
Wes Wirth told the group that he had spoken to Karen Simmons about a website. She will talk to the
web designer. He also said that he had spoken to Chris Flladora about the continuing drainage problems
at the bike path turn. He will have Bob Barnard bring in some stone, but a permanent solution is
needed.
Vanessa was happy to tell the group that several walkers had told her that they were impressed with the
improvements when she was planting on June 5.
There was a question raised about the Town dumping grass clippings. We do not have a compost pile so
this is unacceptable.
The meeting was adjourned at 5:35 pm.
Respectfully submitted,
Lynne Wilson
Lincoln Park Sub - Committee
June 26, 2013
Present: David Williams Lynne Wilson, Nell Walker, Brian Kelley, Robert Pressman, Vanessa Tropeano and
Miles Connors /Parterre Garden Services, Wes Wirth, Wirth Associates, Wendy Rudner, liaison
Brian /Bathroom update:
Write -up in Minuteman newspaper and spoke on LexMedia Talk Show
Electrician Scott Carron is excellent
More donations - Lexington Fund = $4,000. + $2,000. pending. Still in contact with Little League
Costs still needed to be determined for: plumbing, floors /epoxy, partitians
Miles:
Will contact Mr. Cooper to take care of the poison ivy, as he has done in the past
Went to Conservation Committee meeting - reviewed eradication of phragmites , 3 plot plan
Recommendations from friend: 25% herbicide needed. Also, repeat cutting is not effective.
Cost, mostly of man -hours - 48hrs@ $65. _ $3,100. Do end of July.
Wes suggested having the 3 plots smaller for the experiment
Discussion: David noted limited costs and later in meeting, suggested putting off all costs until duly. He al;
asked Miles if we can wait a year for this project. Miles said yes, but $1300. if do selective stumps.
Wes:
Will call Karen Simmons re: poor quality of newly installed sign on Worthen Road entrance.
Walked with M.Foti re: granite. Matt will give quote. Wes will call McCullough (bathroom guy) for quote, too.
Miles asked his Maine contact person, who will also send a quote.
Final entranceway signage /more suggestions for the three signs:
Spelling change - Hayden Rec. Center to CENTRE
Spell out Massachusetts
Add Dawn = Kirk Dawn Redwood Grove
David will show sign to Don Mahoney
Wes added QR code to website. All agreed- list Wirth Associates and Parterre Garden Services on site
Wes will clear out messy area/draw plan for spruces at Lincoln St. parking lot and give to Chris Filadoro.
Wants to involve boy scouts whenever possible
Response to high costs - will improve everything ecologically
Vanessa:
6 gater bags put on new dogwoods
Waiting for proposal from Bob Barnard regarding Worthen Road and for him to remove collected debris
Lynne:
Overall costs too high. Do small amounts only.
Next meeting on site and then evaluate willow tree leaning on boardwalk, as Nell noted
Questioned knotweed removal now? Was told ok not to do it just now
Nell:
Lynne has brass signs that had been taken down /need to be cleaned up before putting back up
Check out Newburyport to see how they just excavated their site
Garlic Mustard Day good PR, but volunteers tend to see other invasives to pull and just do so
Misc:
Bob - Was working on meadow area and direct watering some needed areas
June 6 minutes handed out - voted to accept unanimously motion to adjourn unanimous
NEXT MEETING - JULY 24, 2013 - Worthen Road @bike path entrance
\0-� elAA& J ��
Lincoln Park Sub - Committee Meeting
July 24, 2013 - at Lincoln Park
Present: David Williams, Lynne Wilson, Brian Kelley, Bob Pressman, Vanessa Tropeano and Miles
Connors, Parterre Garden Services, Wes Wirth, Wirth Associates, Hank Manz, Selectman, Wendy
Rudner, liaison
Water run -off problems:
At bike path /mounds intersection/Worthen Road: Wes explained how a trench should be built - make
trench, collection base, 8" pipe under path
At Lincoln Street path:
1 st turn - washout still a problem
2nd turn - Plantings added helped greatly with that water run -off section
Vanessa/Miles:
Showed improvements:
Weed - wacked areas in mounds /opened up some areas, weed - wacked on sides of boardwalk
All areas where plantings added
Much hand - picked at mounds
Meadow cut down nicely
At wetland vegetation sign - a couple witch hazels are stressed
Bindweed on boardwalk by small field /near pond is taking over
Will weed -wack, keep it low
Brian suggested doing so early in season,when growth is low, possibly getting a tractor to do this
Theresa Lee Memorial:
Lynne - Immediate need to open up path to the memorial stone Need direct path to see stone
Vanessa /Miles concurred - will do
Brian:
Went on bathroom tour /progress
Upgrade of $3,000. to make lights LED
Built for future food stand,if desired
Grading around entire area needed - will ask JM McLaughlin
Wes noted, need proper pitch for any water to run out
Donations:
Volunteer -put article on website asking for more funds
Received $10,000. funding from little league, several smaller donations coming in
Some thank you notes have been written
Misc:
Loose board on boardwalk - Brian will fix
Raised edging on sides of boardwalk are specifically designed for handicapped persons
David asked Wendy to find oi)t if the sub - committee would be able to use CPA funds
informal notes by Wendy Q_ Rudner
4��,
Town of Lexington
, / r x� �, Cos
0". *, 0
Q N
r �
\ S
3
r
Z U
� w
O
z
Recreation 5- Year Capital Plan
FY2 0l S -FY2 0l 9
DRAFT
MOg
17 75
Submitted by:
Karen Simmons
Director of Recreation
August 21, 24 l 3
APRIL 19TH
/NG1%
fk�F!" ,
'own of Lexington
Department: Recreation
FY 2015 -2019 Department Summary of Capital Improvement Projects
# Priori Project Name FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 Total
278
8
Athletic Facility Lighting
$0
$287,552
$0
$0
$483,150 $770,702
280
10
Pine Meadows Improvements
$0
$0
$275,000
$0
$75,000
$350,000
1 282
4
Park and Playground Improvements
$65,000
$65,000
$65,000
$65,000
$65,000
$325,000
283
7
Town Poo[ Renovation
$0
$0
$1,188,308
$0
$0
f $1,188,308
518
2
Park Improvements - Athletic Fields
$100,000
$110,000
$75,000
$150,000
$210 ,000
$645,000
519
5
Pine Meadows Equipment
$51,000
$55,000
$0
$0
$0
$106,000
530
6
ADA Accessibility Study
$0
$60,000
$0
$0
$0
$60,000
532
3
Park Improvements- Hard Court Resurfacing
$85,000
$55,000
$55,000
$60,000
$0
$255,000
732
9
Center Track and Field Reconstruction
$0
$0
$0
$3,000,000
$0
$3,000,000
848
1
Lincoln Park Field Improvements
$570,000
$570,000 $0 $0
$0 $Q $0
$0
$1,140
880
11
Parker Meadow Accessible Trail Construction
$0
$0
$0
Department Totals
Approval by:
$871,000 $1,202,552 $1,658,308 $3,275,000
g
?-'0 �(--
$833,150 $7,840,010
(Department Head Signature
8/20/2013 8:27:48 AM
required)
Page 1 of 1
: ° 3 Town of Lexington -- FY 2015 -FY 2019 Capital Improvement Projects
Lincoln Park Field Im ro vements
Project Name: p .,,�,.,.,.�..,.,...._. _..___. Date: 14- Aug -12
Project ID Number: 848
Submitted By: Chris Filadoro
Department:
Recreation
Revision Date: 09- Aug -13
Priority
First Yea Submission? ❑ Phone #: 781- 274 -8355 E -mail cfil adoro @lexingtonma.
Description of Project:
This is a three phase capital improvement program to address safety and playability at Lincoln Park. The Recreation Committee requests
$570,000 in FY2015 to replace the synthetic turf field at Lincoln Park #2. The Public Works Department oversees the maintenance of the
school and town athletic facilities. The Town of Lexington fields see excessive use and a timely replacement as critical to provide safe and
playable fields for user groups and students. Funding to replace the synthetic turf on Field #1 was approved in 2013. It is expected that the
work will be completed in November of 2013.
Lincoln Park Field #2 synthetic field will be removed, partially recycled, and replaced with a similar carpet and in -fill to provide for a safer and
more uniform surface. The drainage will be inspected and repaired if necessary and the subsurface will be laser graded prior to the carpet
installation, It also includes rehabilitation of the walkways around the field and replacement edging. In 2003, Linooln Park was renovated to
include the installation of 3 synthetic turf fields with a life expectancy 10 years. These fields are coming to the end of their life expectancy and the
10 year warranty has expired. In the high use areas, the fibers that are used to simulate natural grass are beginning to show wear and tear,
starting to fall out of the carpet, or be split & broken giving the appearance of a scouring pad. Synthetic field replacement is needed because
carpet fibers begin to fail due to the high use. The underlayment and drainage system can be used for two or three turf replacements. In order to
minimize downtime and spread out the cost, we are proposing the work be completed in 3 phases.
FY2016- $570,000 - Field #fi3 at Lincoln Park renovation wlll include the replacement of the synthetic turf and in -fill materials.
Justification /Benefit:
The park was reconstructed in 2003 and the new playing fields have been a valuable asset to the community. Safety for all participants is a
major concern and improving upon the safety of the fields is the major benefit to all users. The Town of Lexington athletic fields are heavily used
by the community and the synthetic turf allows for increased use during most weather conditions without damage to the turf.
Impact if not completed:
The impact of not approving this request is a continuing deterioration of the synthetic fields which may lead to an unsafe playing surface and
game cancellations. The fibers have begun to break down due to extensive use as well as the product is reaching the end of its life expectancy.
This will impact the Lexington Public School athletic teams and physical education programs, youth leagues, adult leagues, residents.
Timeframe: Replace. FreqL.
Develop spedflratlons after Town Meeting approval and perform renovations in the Fall of 2014 to Years
Stakeholders:
Lexington Residents, Lexington Public Schools, Youth League programs, Adult programs, DPW, Recreation Department
Operating Budget Impact:
DPW staff hours, equipment and materials costs should be decreased with improved playing conditions.
Cost Analysis:
Funding Source 0* Levy ❑. CPA a Revolving () State Aid 0 Water 0 Sewer (* Recreation 0 Private (-) Other
8120/2013 8:28:12 AM
T own of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
Project Name Lincoln Park Field Impro -� � Date' 14- Aug -12
Project ID Number: 848 — Revision Date: 09- Aug -13
Submitted By: Chris Filadoro Department: Recreation Priority 1
First Y ear Su bmission? ❑ Phone #: 781 -274 -8355 E -mail cfiladoro @lexingtonma.gov
Capital Funding Request
648 2015 2016 2017 2018 2019 Totals
Site Acquisition
DeslgnfEngineer
Construction
Equipment
$a $6 l $6 - $Q- -- -$o
$45,OOD $45,000 $0 F $0 $0 �� 1
� -ice
$0
$90,000
$500 __
$500,040
$0
$p
$0
$1,000,000
$F $0
Contingency $25,000 $25,060 $0 $0 i $0 $50,000
Totals $570,000 $578,000 $0 $0 -- – $o I $1,140,000
jCPAAmt. $150,000 1 $150,000 $0 $ $0
Recurring Cost
$0.00
Mafntenance Cycle
0 Years
CPA Purpose
Q Open Space
O Recreation
O Historic
Q Housing
Basis of Cost Projection:
Cost projection is based on an updated proposal from architect. The CPA funding request is for design, engineering, drainage/subsurface work
and the path around the field. The synthetic turf and it ill is rot part of the CPA request.
3120/2013 8:23:12 AM
Town of Lexington -FY 2015 -FY 2019 Capital Improvement Projects
Project Name Park Improvements -Athletic Fields .. .� �._. Date: 15-Sep -06
Project ID Number. 1 51 - _ Revision Date: 15- Aug -13
Submitted By: Chris Filadoro
Department: Recreation
Priority _?
First Year Submission? 0 P #: 7 81- 274 -8355 E-mail cfila @lexingtonma.gov
Description of Proiect:
This is an ongoing multi -year capital program to address safety and playabiiity concerns and to provide adequate & safe field conditions for
neighborhood families, recreation, and school programs. The FY2015 budget request is for $100,000 to renovate the multipurpose field at
Clarke. The last renovation on this field was in 2000. The Public Works Department oversees the maintenance of the school and town athletic
facilities. The Town of Lexington athletic fields see excessive use and timely renovations and replacement are critical to provide safe and
playable fields for all user groups. The Clarke Multipurpose field will be laser graded and will be crowned for proper drainage. The project will
also include site amenities such as signage, trash barrels and benches.
Proposed future renovations will include turf, drainage, irrigation ( where applicable) , and site amenities ( benches, backstops, etc.)
FY2016 - $110,000- Adams Soccer field renovation will include turf, drainage, irrigation ( where applicable) , and site amenities.
FY2017- $75,000- Lincoln Park Softball Field renovation will include turf, drainage, irrigation and replacing the backstop.
FY2018 - $150,000 New in- ground irrigation systems at the Hastings, Bowman and Franklin.
FY2019 - $210,000 - Harrington Baseball and Softball Fields and Computerized Irrigation Controls for all in- ground systems.
Justification /Benefit:
Safety for all participants is the major concern and improving upon the safety of the fields is the major benefit to all users. The Town of
Lexington athletic fields are constantly used by recreation, school, youth, and adult groups. They are in need of major repairs that cannot be
completed within the operating budget. There are safety issues with faulty backstops, uneven turf, uneven infield areas and drainage. The
benefit would be to renovate the fields to a condition where they will be safe, playable, and more easily maintained.
Impact if not completed:
The impact of not approving this request is a continuing deterioration of the fields which may lead to injuries and cancellation of games. This will
impact the School teams, youth leagues, adult leagues, and Recreation programs and affect the quality of life in Lexington.
Timeframe: Replace. Freo:
Develop specifications after Town Meeting approval and perform renovations beginning July 2014. 10 Years
Stakeholders:
Residents, non residents, School programs, Youth League programs, Adult programs, DPW, Recreation Department
Operating Budget Impact:
DPW and Recreation staff hours, equipment and materials costs should decrease with improved field conditions that will require routine
maintenance and not emergency repairs.
Cast Analysis:
Funding Source: 0 Levy * CPA 0 Revolving 0 State Aid 0 Water 0 Sewer 0 Recreation 0 Private 0 Other
Capital Funding Request
518
Site Acquisition
Design /Engineer
Construction
Equipment
Contingency
Totals
CPA Amt. Req.
2015
$0
$10,000
$85,000
$3,000
$2,000
$100,000
$100,000
►111
$0
$10,000
$95,000
$3,000
$2, a6o
$110,000
$110, 000
2017
2018
$4
$o
$10,0
$0
-
$60,000
$145,046
$2,400 $0
- $3,000
$5,000 I
$75,000
! $150,000
i
$75,004
1 $145,000
2019
Totals
$4
$o
$10,000
F 40,000
$140,000
2S ,QQ4
$55,000
$63,000
$5,000
$17,000
$210,000
$210,000
$645,000
Recurring Cost
$0.00
Maintenance Cycle
1 Years
_ CPA Purpose
C) Open Space
O Recreation
0 Historic
0 Housing
8/20/2013 8:28:11 AM
L A N $< k 1 LAN
r, t
Town of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
Recreation
First Year Submission? ❑ Phone #: 781 -274 - 8355 E -mail cfilad @lexingtonma
Project Name' Park Improvements - Athletic Fields
Project TD Number: 518
Submitted By: Chris Filadoro _ Department:
Basis of Cost Projection:
Cost projections are based on similar past projects and information from vendors and architects.
Date: 15- Sep -06
Revision Date: 15- Au -13
Priority 2
8/2012013 8:28:11 AM
Town of Lexington 1
Capita - FY 2015 -FY 2019 Ca itaI hu oventent Projects
Park Im rovements Hard Court Resurfa
Project Name: A - _ 9 _...__ _ _ Date: 13 - Au g - 07
Project ID Number: 53 Revision Date: 09- Aug -13
Submitted B y: Karen Simmons /Chris Filado Department: Recreation --- ,Priority 3
First Year SubmiSSion? ❑ Pbone #' 781 - 862 - 0500 E- mail ksimmons @iexingtonm
Description of project:
The Recreation Committee requests funds to institute and carry out a hard court resurfacing program. The program includes resurfacing,
painting and striping the hard court surfaces at Recreation facilities. These facilities include neighborhood Basketball Courts, Center Track and
Tennis Courts at the Center Complex, Clarke Middle School and Valley.
The FY 2015 request of $85,000 is to resurface, paint and restripe the Gallagher Tennis Courts and the Clarke Middle School Tennis Courts. It
will also replace some tennis equipment such as nets, posts and center anchors.
Future projects:
FY2016- $55,000 - Sutherland Park and Marvin Park basketball courts which will need resurfacing and new backboards /poles.
FY2017- $55,D00 - Rindge Park and Kinneens Park basketball courts which will need resurfacing and new backboardslpeles.
FY2018- $60,000 - Adams Park- resurface, paint and restripe the Adams Tennis Courts and the Adams Basketball court, including new
backboards and poles.
Justification/ Benefit:
Over the past 18 years, the Town has supported and invested in an upgrading of the town's recreation infrastructure. The hard court resurfacing
program is a program for hard surface athletic facilities which include basketball, tennis, track and the skatepark. The program will include
resurfacing and painting the hard court surfaces and installing new posts, backboards, nets and rims at Recreation facilities. It is important to
maintain these valuable assets in the community to ensure their usability and the safety of the users. The Town has spent a great deal of money
to improve the Town's recreation infrastructure and it is important to maintain the resources.
Impact if not completed:
The impact of not approving the request is a deterioration of the athletic facilities and unsafe conditions for the community. In addition, the
Massachusetts Interscholastic Athletic Association (MIAN could deem the Gallagher tennis courts as unplayable. This would require the
Lexington Public Schools athletic program to move matches away.
Timeframe: Replace. Freq:
2015 10 Years
Stakeholders:
School Department, DPW, Recreation and the community at large
Operating Budget Impact:
Failure to maintain the infrastructure will result in higher repair costs and /or complete reconstruction.
Cost Analysis:
Funding Source 0 Levy (J CPA 0 Revolving 0 State Aid 0 Water O Sewer O Recreation C) Private Q Other
Capital Funding Request
532
2015 2016
Site Acquisition
$p $0
DesignfEngineer
$5,000 $2,000
Construction
$72,000 $45,000
Equipment
$6,000 ! $7,000
Contingency
-- $2,000 $1,000
_ . _ _ .....
Totals
........
$85,000 I ..- $55,000
/CPA Amt. Req.
$85,OD0 $55,000
$0
$5,000
2017
2018 2019
Totals
$z,DOD �z,a00 j $D
$11,000
$45,000
$50,000 - $0
$212,000
$7,000
$7,000
30
$27,000
$1,000
-- $1,000
$0
$5,000
$55,000 $60,000 $0
$55,0 $60,QDD $D
$255,000
Recurring Cost
on nn
Maintenance Cycle
5 Years
CPA Purpose
[� Open Space
Recreation
Q Historic
0 Housing
8/20/2013 8:28:11 AM
TOWn of Lexington - FY 2015-FY 2019 Capital Improvement Projects
w, - rprovements- Hard Court Resurfac -
\ I , Project Name: Park Date. 13 Aug 07
Project ID Number: 532
Submitted By: Karen Simmons/Chris Fladoro Department: Recreation
Revision Date. 09-Aug-13
Priority
First Year Submission? [7] Prone #: 781-862-0500-x262 E-mail ksimmons@lexingtoi)ma.gov
Basis of Cost Projection:
The cost esflmates are based on similar past projects.
8120/2013 8:28:12 AM
} Town of Lexington - FY 2015-FY 2019 Capital Improvement Projects
Project Name: Park an Playground Impro vements - - _ � -. Date: 30 Aug -05
Project ID Number: 2 8 2
Revision Date: 15 -Aug -13
Submitted By : Chris I'Vadoro Department: Recreation _- Priority 4
First Year Submission? ❑ Phone #: 781- 27 -8355 E -mail cfiladorc o@Iexingtonma.gov
Descriotion of Project:
The Recreation Committee requests $65,000 to renovate the playground equipment at Garfield Playground, located on Garfield Street, The
improvements will include construction of a new play structure, new swing set, installation of appropriate safety surfacing under and around the
playground structure and swings, and new site amenities such as signage, park benches and trash barrels.
Proposed future projects:
FY2016- $65,000 to update and replace the playground equipment at Marvin Park located on Morris Street.
FY2017- $65,000 to update and replace the playground equipment at Sutherland Park which is located on Sutherland
Road.
FY2018 - $65,000 to update and replace the playground equipment at Rindga Park which is located on Rindge Street.
FY2019- $65,000 to replace and update the swings and site amenities at the Bow Street Park and update and replace playground equipment at
Franklin.
The proposed projects will renovate and rehabilitate existing safety surfacing and deteriorating equipment so that all sites will be in compliance
with Consumer Product Safety Commission ( CPSC) , American Society for Testing and Materials (ASTM) and the Americans with
Disabilities Act ( ADA) standards and guidelines.
Justification/ Benefit:
The play equipment at Garfield is outdated and still has a sand safety surface which needs to be replaced. It is used by the neighborhood and
children watching Little League games. This playground needs to comply with CPSC, ASTM and ADA standards.
Impact if not completed:
The current equipment, use zones, and surfacing do not comply with CPSC, ASTM or ADA standards. As the equipment continues to age and
deteriorate, more frequent inspections, repairs and equipment removal will be needed to ensure that the users are safe. This is neither cost
effective nor efficient.
Timeframe:
spring 2014
Stakeholders:
Residents, DPW, Recreation.
Operating Budget Impact:
no impact to the operating budget
Replace. Freq_
20 Years
Cost Anal sis:
Funding Source: 0 Levy a CPA Q Revolving ❑ State Aid 0 Water 0 Sewer 0 Recreation ( Private ❑ Other
Capital Funding Request
2B2
Site Acquisition
Design /Engineer
Construction
Equipment
Contingency
Totals
2015 2016 2017 2018
Recurring Cost
2019 Totals $0.00
$o $D $0
$D
I $0 $o
_ J
$0 $0 $0 $0
$0$0
$0
$20,000 i $20,000 � $20,000 $20,QQ0 $2Q,000
u
$100,000
$42,000
$42,000 - $42 $42,000 I $42,000 $210,040
$3,000 1 $3,000 $3,000 $3,007 $3,000 $15,040
$65,000 $65,000 � $65,000 $65,040 $65,000
$325,000
I i CP A Amt. Req. $65,000 $65,000 1 $65,001) $66,D00 1 $65,000
Basis of Cost Projection:
Maintenance Cycle
1 Years
CPA Purpose
C) Open Space
Recreation
Q Historic
Housing
8/2012013 8:28:11 AM
Town of Lexington - FY 2015-FY 2019 Capital Improvement Projects
Project Name: __taFkand t layLroundl7lpL Improvements Date:
ts 30-Aug-05
Project ID Number: Revision Date: 15- Aug -13
Submitted By: Chris F ladom
Department: _Recreation Priority AfT
First Year Submission? ❑ Phone #: 781-274-83 E-mail cfiladoro@lexingtorma.gov
The cost projections are based on similar renovation projects and from estimates by Landscape Structures.
8/20/2013 8:23:11 AM
Town of Lexington - FY20I5- FY20I9 Capital Improvement Projects
Project Name: Pine Meadows Equi pment Date: 11- Aug -o 8
Project ID Number: 5 Revision Date: 14- Aug -13
Submitted By: Karen Si mmons
Department:
Recreation
Priority
First Year Submission? ❑ Phone #: 781- 8 62 -0500 x2 E -mail ksimmons @lexingtonma.gov
Description of Project:
FY2015 - Purchase a Toro Aerator for $26,000 and a Toro Utility vehicle for $25,000.
Toro Pro Core 648- will replace the Toro aerator that was purchased in 2000 as well as the Ryan Greensaire 24 purchased in 2003. The new
Toro Aerator will be used to aerate the tees, greens, collars and aprons during the season. The greens are done three times per year and the
other areas in the spring and fall.
The Toro Utility vehicle will replace a 1990 Cushman Utility vehicle. The Toro Workman is used on a daily basis for all projects on the golf course
and maintenance including topdressing of the greens, tees, collars and aprons, spraying the greens, tees, collars and aprons and fairways,
fertilizing the golf course fairways and rough, hauling material for bunker repair.
FY2016 Toro Grounds Master 4500D mower to replace the existing 2007 Toro Grounds Master. The machine is used a minimum of four times
per week to cut the areas of the rough throughout the golf course. The life expectancy of golf course mowers average 7 years. The cost is
estimated at $55,000.
Justification /Benefit:
The aeration equipment that is being replaced is obsolete and beyond their useful lives. The new Toro Pro Core 648 has significant improved
performance, speed and technology that will allow us to aerify the areas faster with much improved results. For the past three years the
management company has been using their awn Pro Core 648 to do all the aerification at Pine Meadows. It would not make economic sense to
have an outside contractor perform the work as the timing and scheduling is critical and the cost would be significantly more than purchasing the
equipment over its estimated life of twelve years.
The Cushman Utility Vehicle is fifteen years old and beyond its useful life. In addition, the Cushman is a three wheel vehicle and there are
concerns with the safety of the vehicle carrying heavy loads over certain terrain. The new vehicle will ensure the safety of the operator.
The overall aesthetic quality of a golf course is very important to its ultimate financial success. The good maintenance of a golf course requires
equipment that operates efficiently, effectively, and safely. The quality of the turf and grooming of the course is critical to the overall operation.
Impact if not completed:
With the significant amount of play and existing soils at Pine Meadows it is important to perform aerification of the turf grass throughout the
season. It would bean extreme inconvenience to the golfers in having to use the old equipment as it takes at least three times as long to
complete the process to the point where you should close the course for a couple of days resulting in a loss of revenue. More important, the
spacing and depth of the Toro Pro Core aerator is better resulting in improved turf quality. if the turf is not maintained properly, it will affect the
quality of play and the Town will lose customers, thus reducing revenue. In addition to the financial loss, employee safety issues arise If
machinery is operated beyond its reasonable life span.
Timeframe•
July 2014.
Replace. Fred
12 Years
Stakeholders:
Residents, Non- resident golfers, Recreation, Lexington Public Schools Golf Team, Minuteman Tech High School Golf Team
Operating Budget Impact:
Reduce repair costs
Cost Analysis:
Funding Source: ❑ Levy Q CPA O Revolving O State Aid O Water O Sewer d Recreation 0 Private C) Other
8/20/2013 8:28:11 AM
_ Town of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
�.
Project Name Pine Meadows Equipment -_ -- date: 11 Aug -DS
Project ID Number: 519 Revision Date: 14- Aug -13
Submitted By: Karen Simmons Department: Recr eation Priority 5
Fir Year Submissio ❑ Phone #: 781- 862 -0500 x262 E - mai l ksimmdns@lexingtonma.gou
Capital Funding Request
519 2015 2016
Site Acquisition $0 i $p
DesignlEngineer $0 $0
Construction $0 $0
Equipment $51,000 $55,0DD
Contingency $0 $0
Totals $51,000 $55,000
A Amt. Req. I $D 1 $0
2017 2018 2019 Totals
$o
$0 $0 so - - $0
$0 $0 $0 $0
— $ D $0 $a $ 106,000
$D $-0 $D $0
r $o $o $o $1as,00a
$D $D $D
Recurring Cost
_1 — Years
CPA Purpose
0 Open Space
0 Recreatton
Q Historic
C Housing
Basis of Cost Projection:
2013 cost estimate
8120/2013 8:28:11 AM
`� . Town of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
k ' Project Name: ADA Accessibility Study Date: 29- Aug -08
Project ID Number 530 Revision Date: 09- Aug -13
Submitted By: Karen Simmons Department: Recreation Priority 6
First Year Submission? ❑ Phone #: 78 - 862 - 0500 x262 E -mail ks immons @ iex ingto nma.gov
Description of. Project;
The Recreation Committee requests $60,000 to complete a study of the Town- s recreation areas to determine accessibility deficiencies. The
assessment will look at ADA accessibility deficiencies including proper signage, limited handicapped parking, poor accessible access pathways,
inaccessible and non - compliant seating ( bleachers, non - compliant picnic facilities and a variety of other issues) .
The consultant will note any accessibility deficiencies found and suggested corrective actions and provide cost estimates to remedy the
accessibility deficiencies. As a result of the survey, a written Transition Plan, will be completed to be incorporated into future plans.
Justification/ Benefit:
The Town has over 30 recreation and open space areas including neighborhood parks and playgrounds and they should be accessible for all to
enjoy.
Impact if not completed:
It limits the use of open space and recreation facilities by individuals that require accessible resources.
Timefra me:
2016
Stakeholders
all users of the public facilities
Operating Budget t Impact:
Replace. Fred
0 Years
Cost Analysis:
Funding Source: O Levy ( CPA O Revolving Q State Aid C) Water Q Sewer Q Recreation O Private Q Other
Capital Funding Request
530 2015 2015 2017 2018 2019 Totals
Site Acquisition
Design /Engineer
Construction
Equipment
Contingency
$0 $0 j $0 $0
$0 $0
$0 $60,000.
$0
$0
$60,000 _
_ .$
$0 $0 $0
- - - -- -$0 --
$0.
$ 0 _L
$0
$0 $0 $0
— — $0 —
$ _— $0
$0 $0 $0
$0
$0 — — $o ..
Totais
$0 J
$60,000
$0
$0 $0
$60,000
CPA Amt. Reg.
$0
$60,000
$0
$0 $0
Basis of Cost Projection:
Three vendors provided a cost estimate in 2006 based upon the scope of work.
Recurring Cost
$0.0a
Maintenance Cycle
0 Years
CPA Purpose
Q Open Space
(� Recreation
(� Historic
Q Housing
8/20/2013 8:28:11 AM
Town of Lexington - FY 2015 --FY 2019 Capital huprovement Projects
Project Name: Town Pool Renovation M
Project ID Number: 283
Submitted By: Karen Simmons Department:
Recreation
Date: 30- Aug -0
Revision Date: 09- Aug -13
Priority
First Year Submission? ❑ Phone #: 7_81-862 -0500 x262 E -mail ksimmons @lexingtonma.gov
Description of Project:
The Recreation Committee is requesting $1,188,308 in FY2017 for Phase III of a multi- phased program of renovations to the Irving H. Mabee
Pool Complex. The phased approach was identified in the Engineering Consultant's Study completed in FY2008 by Bargmann Hendrie and
Archetype. Phase III of the project scheduled for FY2011 will include replacing the filtration systems which are beyond their life expectancy.
The building will have to be enlarged in order to accommodate four new filtration systems. The Garrity, Main and Diving Pools share a common
filter system. The current Department of Health Codes do not allow multiple pools to share a filter. The Town is currently grandfathered until the
filter is replaced_ By having the pools on a common filter, if a situation occurs that warrants closing a pool, all three pools must be closed. The
timing of this projct may be adjusted based on the efficiency and operating conditions of the existing filtration system.
Replacement of the filtrations system is a large undertaking and requires the following work:
E=xpansion of the filter room (an addition to the building is required) .
Replacement of piping between existing surge tank and filter room ( main and diving pool)
Replacement of piping between Garrity Pool and filter room.
Removal and replacement of concrete decks to access piping.
Upgrade of electrical service to 600 Amps for increase in pump quantity.
Justification/ Benefit:
The Irving H. Mabee Pool Complex is a heavily used recreation facility during the summer. Attendance at the Center Pool Complex averages
over 85,000 people. While the facility continues to operate safely, the filtration system was cast updated In 1980. The consultant's report
provided the Town with a detailed list of recommended upgrades and repairs needed, thus allowing the Town to plan and budget the upgrades
and repairs effectively and responsibly. With each year, the efficiency and effectiveness of the filtration systems and chlorinators decreases.
Repairs become more costly as the filtration system breaks down more frequently. The improvements to the filtration system will bring the
system into compliance. Funding was approved in 2010 for Phase I and 2011 for Phase ll. Phase I and Phase II are complete.
Impact if not completed:
If immediate needs are not identified and addressed, the pool may need to be closed for an extended period of time during the peak season, thus
affecting the residents and decreasing revenues.
Timeframe: Replace. Freg
2017 -2018 30 Years
Stakeholders:
Residents, Non- residents, Recreation, DPW, Health Department, Lexington Public Schools
Operating Budget Impact:
Repairs to the filtration system and plumbing system has become an annual occurrence which impacts the operating budget.
Cost Analysis:
Funding Source: 0 Levy * CPA ❑ Revolving ❑ State Aid ❑ Water Q Sewer Q Recreation ❑ Private Q Other
8120/2013 8:28:11 AM
Town of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
? Project Name Town Pool Renovation _. Date: 30-Aug-05
Project ID Number: 283 Revision Date: 09-Aug -13
Submitted By: Karen Si mmons Department: Recreation — Priority 7
First Year Submission? E] Phone #: 7 81 - 862 - 0500 x262 E - mail Ksimmons @lexingtonma.
Capital Funding Request
Recurring Cost
283 2015 2016 2017 2018 2419 Totals $0.00
Site Acquisition ! $0D._ _ .. $0 . _. $0 .._ _..._ _. $O _ -- _....._ -$Q Maintenance Cycle
Oesign /Engineer $0 $0 $82,500 $o $0 $82,500 1 _ Years
Construction $0 $0 $1,064,608 1 $0 SQ $1,064,608 CPA Purpose
Equipment
Contingency $0
� . _ �Q Open Space
.. $41,200 $ -^ _ $ PPP $41 "'200 �
I �� Recreation
Totals $0 $0 $1,188,308 $0 $0 $1,188,308 Historic
ICPA Amt. Re $0 S0 Isi.188,308 1 $0 1 $0 O Housing
Basis of Cost Projection:
The cost estimate is based on the Pool Facility Audit completed by Bargmann Hendrie + Archetype, Inc. in February 2408.
8/20/2013 8:28:11 AM
Town of Lexington - FY 2015 -FY 2010 Capital kuprovement Projects
14 147 Project !Name: Athletic Facili Lightin Date; 25- Aug -05
Project ID Number: 278 Revision Date: 09 Aug - 13
Submitted By: Kar Simmons /Chris Flladcro
Department: Recreation
Priority 8
First Year Submission? ❑ Phone #: 781- 862 - 0500x262 E -mail ksimmons @lexingtonma.gov
Description of Proiect:
The Recreation Committee requests $287,552 in FY2016 for Phase I of an Athletic Facility Lighting upgrade to replace the existing lighting
system and structures at the Gallagher Tennis Courts and the Center Complex Basketball Courts with more cost efficient fixtures and illuminants.
Phase II of the project scheduled for FY2019 requests $483,150 to replace the existing lighting system at the High School Varsity Baseball and
Varsity Softball field.
]ustification Benefit:
The current lighting system is constantly being repaired and does not operate effldentiy. Tennis court lighting was last upgraded in 1986. The
basketball court lighting was also improved in 1986. With the exception of bulb and fixture replacement and repair, there have been no significant
improvements to the lighting systems in these areas.
The Center # 2 Softball Lights were installed in 1986 and the Center # 1 Baseball lights were installed in 1997. The installation of newer energy
and cost efficient systems will provide financial savings to the Town and allow for a safer environment in which to participate in night activities.
Recreation is a value added service to the community.
Impact if not completed:
The repair budget for the existing lighting systems will continue to increase_ As energy costs continue to rise, the cost to operate the lights
increases yearly. Outdated, inefficient lighting at heavily used areas such as the Center Recreation Complex have a negative impact upon the
department budget. Newer lighting will enhance playing conditions for participants, provide the users of the area with a safer facility in which to
recreate, be less obtrusive for the neighborhood and environment, and be more energy efficient and trouble free for the Town.
Timeframe: Replace. Freg:
Phase 1 2016; Phase II - 2019 25 Years
Stakeholders:
Lexington Public Schools, Residents, Non residents, Youth and Adult Leagues, DPW, Recreation
Operating Budget Impact:
The specifications will include a 25 -year warranty and maintenance program. This will eliminate maintenance costs for 25 years including labor
and materials. New energy efficient fixtures and bulbs wiil result in a operating cost savings.
Cost Analysis:
Funding Source: O Levy (J. CPA 0 Revolving ❑ State Aid 0 Water 0 Sewer 0 Recreation 0 Private Q Other
Capital Funding Request
278
2015
Site Acquisition
$0
Design /Engineer
F $0
Construction
$0
Equipment
$0
Contingency
$0
......... .....
Totals
_
�- - - $0
CPA Amt. Req _ $0
Basis of Cost Pro'ection:
2016 2017 2018 2019 Totals
$a $o $o $0 $0
$138 776 $0 $0 $236,575 $375,351
$138,776 $0 f $0 $236,575 $375,351
$10,000 $o $0 T^ $10,000 -- $20,0o0
$287,552 $0 $o f $483,150 $770,702
$287,552 $0 $0 $483,150
The projected cost is based on a 2008 estimate from Musco Sports Lighting, LLC..
Recurring Cost
(go nn
Maintenance Cycle
25 Years
CPA Purpose
0 Open Space
Recreation
❑ Historic
(:) Housing
8/20/2013 8:28:11 AM
`{ Town of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
r Project Name: Cente Trac and Field Reconstruction Date: 15 -A -11
Project ID Number: 7 Revision Date: 09- Aug -13
Submitted By: Chris FiladorolKaren Simmons Department: Recreation Priority _ 9
First Year Submission? ❑ Phone ##: 781 - 274 -8355 E -mail cfiladoro @lexingtonm
Descriotion of Project:
The Center track area is one of the most heavily used facilities in town and is open and available 365 days per year depending on the weather.
The track and the associated athletic field area are used by the school, youth and adult groups, Recreation and residents. The area is used for
walking, running, track and field events, soccer, Special Olympics and Physical Education classes. The track surface was recoated in the fall of
2012 and this is the last recoating that the track can undergo. It is estimated to add 5 to 6 years of life to the existing surface. This request is to
totally reconstruct the track surface, do a complete renovation of the athletic field with the installation of synthetic turf, installation of lights and
replacement of the existing bleachers. The FY2018 request for this project is $3,000,000.
Justification Benefit:
The track surface continues to wear out at a high rate creating unsafe conditions which affect a large number of users. The reconstruction will
allow for continued high use for a wide range of users and provide a safer and more comfortable surface. The reconstruction of the athletic field
will allow for extended use similar to Lincoln Park.
Impact if not completed:
The track surface will continue to deteriorate causing safety concerns and possible ciosures for more costly short -term repairs. The athletic field
Will be at capacity and the hours of use will be limited by inclement weather and worn areas causing down time for programs that are already at
their limit.
Timeframe: Replace. Fred
2018 25 Years
Stakeholders:
Lexington Public Schools, Recreation, youth and adult sports programs, residents.
0Reratin9 Budget
It is estimated that the expense to operate the lights is approximately $6,000 per year. This will he offset by revenue.
Cost Analysis-
Funding Source: (�) Levy ( CPA O Revolving Q State Aid O Water O Sewer O recreation ❑ Private ❑ Other
Capital Funding Request
732
Site Acquisition
Design /Engineer
Construction
Equipment r
Contingency
Totals
2015 2016
^ $0 $0
$0 $0
$0 $0
- $0 $o
$o $0
2017
$0
$0
$0
$0
$
$a
2018
$0
$300,000
$2,000,000
$400,000
$300,000
$3,000,000
$2,4CO.000
2019
_- $0
$0
$0
$0
$0
Totals
-- - .. ........... $0_
$300,000
$2,000,000
$400,000
$300,000
$3,000,000
Recurring Cost
em nnn nn
Maintenance Cycle
__...0 Years
CPA Purpose
O Open Space
Recreation
0 Historic
❑ Housing
Basis of Cost Projection:
Cost projections provided by Stantec based on similar projects. The synthetic turf is estimated to cost $600,000. The subsurface drainage and
track construction is estimated at $2,400,000.
812012013 5,28:12 AM
� ? Town of Lexington - FY 2015 -FY 2019 Capital Improvement Projects
Project Name: Pine Meadows Improvements Date: 3 0- Aug -05
Project ID Number: 28 Revision Date: 0 Aug - 13
Submitted B y: Chris Fi ladoro
Priority 10
First Year Submission? ❑ Phone #., 781 274 -8355 E -mail cfiladoro@iexingtonma.gov
Description of Proiect:
In 2006, the Town hired an engineering firm to address the remediation of poor drainage and storm water flow conditions and associated holding
ponds that are at or adjacent to Pine Meadows. Phase I was approved in 2009 and the work included restoration of the Upper Control Pond
Dam, the access path between the upper pond and the Kiln Brook, creation of an overflow system and reconstruction of the existing pipe near the
spillway. This work was completed in April of 2012.
FY2017- $275,000 to replace the existing drainage system that is currently functioning at a reduced capacity on the 1st and the 8th fairways.
FY2019- $75,060 to update the in ground irrigation system with a computerized Site Pro System.
Justification/Benefit:
Pine Meadows is a valuable open space and recreational resource area for the Town of Lexington. It is used year round by residents to play golf,
cross- country ski, sled and walk. Dredging the lower pond will clean out the silt that is contaminating the irrigation system. Installing new
drainage lines will reduce the flooding problems that currently exist on the fairways.
Impact if not completed:
Not implementing the drainage improvement project could result in poor turf quality and wet fairways. Poor conditions will result in a reduction of
play and revenue.
Timeframe: Replace. Freq:
Develop specifications after town meeting Town Meeting approval and perform renovations beginning November of 2017 20 Years
Stakeholders:
Residents, Non - residents, DPW, Recreation, Lexington Public Schools, Lexington High Golf Team, , Minuteman High School and the
Conservation Commission
Operating Budget Impact:
A reduction in revenue if the fairways are not playable.
Cost Analysis-
Funding Source: a Levy O CPA C) Revolving O State Aid O Water O Sewer * Recreation 0 Private 0 Other
Capital Funding Request
ego 2015 2016 2017 2018 2019 Totals
Site Acquisition
q $0 $0 $Q $0 $0 � $0
$0
Design /Engineer $0 $45,000 $0 $0 $45,000
Construction I
$0 — �Q $215,000
215,000 . _.__.._ I $Q .. $215,000
Equipment $0 $0 $0 $0 $75,000 $75,000
Contingency $0 1 $0 $15,000 l $o $o $15,000
_ . .....
Totals $0 - $0 $275,000 1 $0 — $75,000 $350,000
! C PA Amt. e. $0 $(} $0 $0 1
Basis of Cost Praiection:
Department: Recreation
Recurring Cost
$0.00
Maintenance Cycle
1 Years
CPA Purpose
0 Open Space
a Recreation
Historic
[) Housing
The drainage improvement cost estimate is based on the Hydrology Report prepared by Tutela Engineering Associates, Inc. completed in Aprl
2008.
8/20/2013 8:28:11 AM
Town of Lexington - FY 2015-FY 2019 Capital Improvement Projects
Project Name: Parker Meadow Accessible T rail Construction _ Date: 13- Aug -13
Project ID Number: 880 Revision Dater
Submitted By: Karen Simmons /Karen Mullins Department: Recreation — priority _ 11
First Year Submission? ® Phone #: 781-862-0600x262 Em ail ksimmons @lexingtonma.gov
Description of Project:
This project is to secure funding to construct a universally accessible passivo recreational trail system for Parker Meadow, a Town -owned
property ( Map 64 Lots 14013, 140D, 14213, 143, and 182; and Map 56 Lot 30) that was acquired by the Town in cooperation with the
Commonwealth of Massachusetts in the 1970x. This is a project in collaboration with a private citizens committee, Conservation and Recreation.
The funding for the design of this project is being requested by the Conservation Department in the FY2015 budget.
The design documents will be used to formalize this proposal for the construction phase in a subsequent year. This is a place holder.
Justification/ Benef t:
- Create barrier -free access to one of Lexington_ s popular open space properties via a passive recreational trail system for members of the
public with physical, vision and auditory limitations.
Impact if not completed:
- Lexington will continue to offer no open space properties that possess barrier free access to members of the public possessing physical or
other handicaps that preclude the ability to enjoy Lexington's open space resources.
Timeframe: Replace. Freq_
Will be established once the design and cost estimate is complete 25 Years
Stakeholders-
residents, Conservation, Recreation,
Operating Budget Impact:
Cost Analysis:
Funding Source: 0 Levy 0 CPA 0 Revolving 0 State Aid 0 Water 0 Sewer 0 Recreation O Private 0 Other
Capital Funding Request
8847
2015
Site Acquisition $o
DesignlEnginoer $0
Construction
Equipment
Contingency f
......... ......... .. _ .. .
Totals $o
[[_PA Amt. R.q.
$Q
Basis of Cost Proiection:
2016 2417 2018 2019 Totals
$0 $fl. $fl $Q .. .....
$0 $0 $o $o $0
_._
$o $oo $o $o
$0 $0 $0 $0 $0
$0 $4 $0 $o - - - -- $ 0
$0 $o $o $0
Recurring Cost
$0.0 -
Maintenance Cycle
Q Years
CPA Purpose
{) Open Space
0 Recreation
0 Historic
0 Housing
8/20/2013 8:28:12 AM