HomeMy WebLinkAbout2007-04-30-CEC-min
CEC 4/30/07, TOB 111, 10am
SS, TE, CWL
Victoria Buckley, Jeanne Krieger, CV, PK, Bill Hadley, Dave Cannon,
Francine Steiglitz, Peter Chalpin
VB: Vibration and tree pits are not in current specs.
JK: Construction specs are the same as the Pittsburgh study (std).
But the test is not an objective test, just a research paper. The
contracts say that they'll perform to ADA stds. The 3/12 BoS minutes
say that they won't go forward with phase 2 until Commission on
Disabilities can review the pilot. The specs are already sufficient
for the contract.
Resolution: Agreement that the BoS, CEC will all agree to review the
pilot before going on to Phase 2.
Lincoln Field
$60K already spent. Discussion of several options. Option 2b would
be to only put up barrier on the highest leaking 300 feet without a
membrane and see if that's good enough. But it's not clear if DEP
will approve this or not.
JK: 2b requirs continued consulting.
No one is sure if we have to do the full 900'.
TE: Do option 2c and get 40 years out of the life of the project.
SS: Don't micromanage. Do 2a or 2c.
Motion: Recommend 31(a) at $550K and have BoS and staff determine which
option to choose.
Article 43(b)
$42,575 balance is $32,150,000 (March 2002 STM) + 1.575M (May 05 ATM)
+ 250K (May 2006 ATM) - project costs and outstanding encumberances.
The 1.575 was voted net of both rebates from NStar, but second one
looks like it may not come in. Fiske rebate was assumed to be $125K,
but it hasn't come through yet (and it may not come through at all).
The technology portion is FF&E.
Fiske was $110K over on legal + additional $140K D&E fees.
TE: supports with the admonition that PBC gets accurate reports of
what's been spent.
SS: supports.
Need to reiterate that we should bid one project at a time and use two
appropriations + one Debt Exclusion question so that there are two
accounts in MUNIS.
Motion: Recommend $500K on 43(b). 3:0
Adjourn: 11:20am