Laserfiche WebLink
Transportation Advisory Committee Minutes <br />October 7, 2008 <br />Present: Sara Arnold, Sally Castleman, Elaine Dratch, Bill Levison, Danny Moraff, Francine <br />Stieglitz, Richard Canale (Planning Bd liaison) <br />Staff: Gail Wagner. <br />Beal Corp: Peter Nichols, Ed Grant, Charles Kalauskas <br />Beal Corporation/Ledgemont Expansion <br />➢ Peter Nichols gave an overview of the Ledgemont development and proposed expansion. <br />➢ Charles Kalauskas, consultant, summarized Ledgemont traffic patterns and auto counts. <br />➢ Expansion will create 117 underground parking spaces, 3.2 spaces per 1,000 square feet. <br />Existing two buildings have 3.8 parking spaces per 1,000 square feet. <br />➢ Employee commuter surveys reflect 90% SOVs and 10% carpooling. Majority of <br />respondents commute from outside Route 128 so less likely to carpool. <br />➢ Beal Corporation's traffic mitigation proposal to be presented at Special Town meeting <br />November 17, Article 9. Two objectives: reduce vehicle trips to site and mitigate traffic. <br />➢ Mitigation proposal specifics: On site transportation coordinator; 128 BC membership; <br />Bike storage and showers; Zip Cars; Tenants encouraged to work from home and flex <br />time; Tenants to subsidize cost of non -auto travel; Site amenities such as cafeteria and <br />ATM machine; Contribution to Lexpress; Contribution to Town to improve South <br />Lexington travel infrastructure. <br />➢ Mr. Nichols noted that Lexpress was viewed as a possible Center lunch shuttle. He <br />envisions Lexpress traversing Ledgemont, entering on Spring and exiting Hayden Ave. <br />➢ TAC's comments: Supportive of bike racks, reduced parking spaces, 128 BC <br />membership, transportation options, and financial support of non - drivers to create parity <br />with drivers' perks . Regarding Lexpress contribution, five (5) year review is very <br />different than wording of Lexington Technology Park's TDM agreement. And, based on <br />current operating schedule, Lexpress may not be able to serve as a lunch shuttle or <br />traverse Ledgemont property. <br />TAC's Review of Beal's TDM proposal <br />➢ Traffic Mitigation Group negotiates TDM terms. Elaine will present TAC's feedback. <br />➢ Points: Mitigation standards apply to entire property not just expansion; Parking space <br />reduction applies to entire Ledgemont complex; Annual $10,000 contribution to Lexpress <br />subject to CPI (half sq footage as Lexington Tech Park with a TDM payment f $20,000 <br />with CPI); Financial incentive for employees to encourage public transit; Annual on -site <br />traffic mitigation review with on -site transportation coordinator. <br />End of Day Rider Counts Verified <br />➢ TAC's observer corps selected various 5:30 pm and 6:00 pm routes to confirm ridership. <br />This was done since the drivers' were not recording riders on these routes in violation of <br />the contract that required drivers to record all riders. <br />➢ Ten (10) runs were observed. Rider counts for 8 runs were the same as the driver sheets. <br />For two (2) runs, driver sheets reflected one (1) less rider. <br />➢ From Sept 15 through October 3 (total 15 days), 5:30 pm runs averaged 11 riders and <br />6:00pm runs averaged 5 riders. <br />➢ Sara suggested one bus might go into Lexington High School for these routes to see if it <br />would motivate more students to take Lexpress home at these times. <br />