|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-02-10-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2011
>
2011-02-10-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 5:08:34 PM
Creation date
7/14/2011 5:08:33 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />APPROVED MEETING MINUTES <br /> <br />Committee Name: Lexington Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: <br />February 10, 2011, 7 pm, Rm 111 Town <br />Office Building <br /> <br />Members Present: <br />Peggy Enders (Chair), Stew Kennedy, John Frey, Marita <br />Hartshorn, Jerry Van Hook, George Gagliardi, Bob Hausslein (FoLB Chair), <br />Sandra Shaw (Recreation Committee Liaison) <br /> <br />Members Absent: <br /> Laurel Carpenter, Mike Tabaczynski, Peter Kelley, <br />(Selectmen’s Liaison), Richard Canale (Planning Board Liaison) <br /> <br />Minutes <br />: The January 2011 minutes were accepted. <br /> <br />Snow Plowing <br />: Peggy reported that so far this winter the Bikeway has been <br />plowed about 8 times. Invoices to date from John DeNapoli are $3,990. After <br />the late January storm, the path narrowed so much that DeNapoli could not plow. <br />With the help of Peter Kelley and Jimmy McLaughlin, equipment was brought in <br />on February 4 to widen the Bikeway to that it could be cleared. Peggy said that <br />she would talk with Bill Hadley about these recent events as well as about the <br />trial arrangement with Bedford. She will suggest that Bedford plow the section <br />between Westview and Wiggins regularly and invoice FoLB for our fair share. <br />Hand shoveling and snow blowing around the gates has become a problem <br />because there has been so much snow; there is growing resentment for having <br />to clear so much area with volunteer labor. Perhaps if and when we have a <br />better agreement with the town (e.g., regarding the bollards and the gates), this <br />problem will solve itself. Alan Nelson from Bedford helped during the last storm <br />with Westview, Hartwell, and Bedford. Jerry, George, Peggy and Bob have been <br />doing the lion’s share this winter, and much relief has been provided with the <br />help of Bob Hausslein’s snowblower. <br /> <br />Bikeway Guidelines: <br /> George presented his latest draft and the committee was <br />reminded that we’re trying to produce two documents – one to present to the <br />Selectmen for possible inclusion in their policies manual (general principles for <br />use) and one, more specific, set of guidelines for use by LBAC for special events <br />and signage requests. We discussed the level of detail we should include. <br />George will send the next draft for review. The guidelines should include a <br />process for approval as well as the guidelines for special event requests. <br /> <br />MAPC Bike rack Program <br />: Funding for this program is expiring at the end of this <br />year; MAPC has notified us that $305K is left in this budget for 2011 with an <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.