|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-05-12-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2011
>
2011-05-12-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2011 5:05:57 PM
Creation date
7/14/2011 5:05:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />APPROVED MEETING MINUTES <br /> <br /> <br />Committee Name: Lexington Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: May 12 <br />, 2011, 7 pm, Ellen Stone Room, <br />Cary Hall. <br /> <br />Members Present: <br /> Stew Kennedy (Acting Chair), John Frey, Marita Hartshorn, <br />Jerry Van Hook, Bob Hausslein (FoLB Chair), Richard Canale (Planning Board <br />Liaison), Sandra Shaw (Recreation Committee Liaison), Laurel Carpenter <br /> <br />Others Present: <br /> Philip Posner, Peter Brooks, Richard Spencer <br /> <br />Members Absent: <br /> George Gagliardi, Mike Tabaczynski, Peter Kelley <br />(Selectmen’s Liaison), Peggy Enders (Chair). <br /> <br />Minutes <br />: The April 2011 minutes were accepted as corrected. <br /> <br />MassBike plans for Summer Century and Family Ride <br /> (Philip Posner). July 30, <br />Lexington High School. Peggy has agreed to be the liaison between MassBike <br />and the town. Included in the different rides planned will be a 12-mile family ride <br />within Lexington. Laurel will help Philip and Peter determine the route. Clear <br />signs are important as well as cue sheets with mileage indications on them. The <br />LBAC voted to support this event and Peggy should convey this to the selectmen. <br /> <br />Plans for Bikeway Drainage and Root Control <br /> (Update) Town Engineering <br />Division recently presented the bikeway restoration plans to the Conservation <br />Commission. The hearing will be continued. Locations to receive drainage <br />improvements are: adjacent to the DPW Compost Facility; between the two <br />crossings of North Lexington Brook beneath the bikeway near Revere Street; <br />between the Maple Street bridge and Tower Park; and behind the group of <br />businesses west of Bow Street. Root control will follow. <br /> <br />Bikeway Intersection Safety Upgrades <br /> (Update) Tabled until June. <br /> <br />Other business: <br /> <br />…A German Company has published a new magazine called “Cyclingmobility.” <br />…Grant applications for the Scenic Byway are due May 23. Ideas include a web <br />page, brochures, maps, interactive displays and kiosks. The Conservation <br />Stewards have a kiosk prototype, which costs approximately $500 for materials. <br />Stew will send specifications to Richard Canale. Locations for kiosks may include <br />Alewife, Arlington Center, Season’s Four, the Depot, the Visitor’s Center. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.