|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2004-10-26-NAC notes
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Noise Advisory Committee-NAC
>
Minutes
>
2004-2009
>
2004
>
2004-10-26-NAC notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2019 5:50:36 PM
Creation date
4/30/2011 3:46:00 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
NAC - Noise Advisory Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Notes from the meeting of the Media Subcommittee of the Communications Advisory <br />Committee for October 26, 2004. <br /> <br />Present were Maria Kieslich (CAC), James Akimchuk (CAC), Jeanne Canale (CAC), <br />Miriam Boucher (CAC) Jeanne Krieger (BOS) and Alan Lazarus (TMMA) <br /> <br /> <br /> <br />We discussed the current status of the Board of Convener process. The mode of <br />governance has been decided. Any official announcement will wait until the <br />present phase of discussions is completed. <br /> <br /> <br />The presentation to the Board of Selectmen on the current status of the Board of <br />Conveners has been postponed until mid/end-November or December. Before <br />any presentation is made, we need answers to the questions from Jeanne Canale to <br />Town Counsel. <br /> <br /> <br />Transition Plan <br /> <br />We discussed the transition plan that Maria presented. <br />o <br /> <br />When it’s firmed up, we will need to present it to the BOS. <br />o <br /> <br />An important part of this plan will be how we’re going to handle Town <br />o <br />Meeting. <br /> <br /> <br />If an outside bid is required for any work (e.g. any future build out, outside <br />contractor for production services), we will have to get a minimum of three bids. <br />We may need to talk to purchasing to get instructions on the procedure to follow. <br /> <br /> <br />Kite’s End <br /> <br />Need to talk to Comcast and RCN about the potential of getting an RCN <br />o <br />live feed into Kite’s End (Comcast has historically not been cooperative <br />about this). Jim to manage. <br /> <br />We will need to go through Lexington’s purchasing procedures to rent <br />o <br />Kite’s End – Jeanne to manage. <br /> <br />The town can hire contractors. However, we will need a job description to <br />o <br />do this. <br /> <br />A large issue with Kite’s End is how to staff it. Exactly when to take over <br />o <br />the lease is also an issue. <br /> <br />Will still need connectivity to both Comcast and RCN wherever the media <br />o <br />center locates. <br /> <br />Jeanne C. to contact Tom Steel and try and set up a meeting with Jim to <br />o <br />discuss this informally. <br /> <br /> <br />Will probably know within a month about whether the media center will be <br />allowed to occupy space in the basement of Cary Hall. <br /> <br /> <br />Jim to be point person for any contact with Arlington’s media center. <br /> <br /> <br />Programming <br /> <br />Miriam will be the complaint person for subscribers’ issues with <br />o <br />programming. <br /> <br />Need to create process for getting programming aired. Jim to manage. <br />o <br /> <br /> <br />Open issue: status of sound system in Cary Hall. <br /> <br /> <br />SCOLA <br /> <br />Wendy Wilson to be contacted <br />o <br /> <br />What’s the status of SCOLA? <br />o <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.