|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-01-19-CEC-min
Breadcrumb Navigation:
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Capital Expenditures Committee-CEC
>
Minutes
>
2010-2019
>
2011
>
2011-01-19-CEC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2019 8:59:02 AM
Creation date
3/2/2011 12:01:30 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CEC - Captial Expenditures Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minutes from Capital Expenditures Committee Meeting <br />01/19/11, 7:30pm, Samuel Hadley Public Services Building, Cafeteria (Summit) and Room 125 <br />Members Present: David Kanter, Shirley Stolz, Charles Lamb (Chair) <br />Members Absent: Ted Edson, Bill Hurley <br />[Note: The Committee was convened in the Cafeteria as part of Summit 4, but then immediately moved <br />to the above -cited room for an independent discussion. The Committee's subsequent actions during the <br />Summit are represented by the Minutes of that Summit.] <br />Other Attendees: <br />Rob Addelson (Assistant Town Manager for Finance), Pat Goddard (Director, Department of Public <br />Facilities [DPF]) <br />Discussion of Funding the Center Complex Restroom Renovation Project <br />Funding in the amount of $77K for that project was provided by the 2008 Annual Town Meeting <br />(ATM) under Article 14a. After having completed the Design & Engineering, $66,823 remains <br />available for the construction. The lowest responsible bid for the construction ($69,680), plus the <br />$5,000 contingency felt prudent by the DPF, totals $74,680— leaving a shortfall of $7,857. The Town <br />proposes to fund that shortfall from the $13,000 balance remaining in the FY2008 Building Envelope <br />funding (2007 ATM, Article 31j, for remodeling, reconstructing and making extraordinary repairs to <br />municipal buildings) after preserving the $75,000 estimated for a lift to the Bird Room in the Cary <br />Memorial Building. (Except for that lift, all other work contemplated with that Building Envelope <br />funding has been accomplished.) <br />Motion: Endorse funding the shortfall of approximately $8K on the Center Complex Restroom <br />Renovation Project (08/14a) from the FY2008 Building Envelope funding (07/31j). Approved 2 -1 (DK <br />opposed). <br />The Committee would like to see the installation of the lift to the Bird Room in the Cary Memorial <br />Building move forward as soon as practical, even if on its own. <br />8:OOpm: Rejoin the Summit. <br />These Minutes were approved by the CEC at its meeting on February 8, 2011. <br />
The URL can be used to link to this page
Your browser does not support the video tag.