|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-11-04-TREE-draft
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Tree Committee-TREE
>
Minutes
>
2010-2019
>
2010
>
2010-11-04-TREE-draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2019 1:58:20 PM
Creation date
12/23/2010 1:45:54 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - TREE - Tree Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Attachment 1 <br />Tree Committee Minutes November 4, 2010 <br /> <br />Topic-draft of Tree Planting Protocol <br /> <br />Planting Methodology Considerations: Implementation Considerations: <br />Approved location and species <br />Ease of planting Bag planting system-Pruning roots reqd <br />Ease of watering(watering plan) 4 inch Perforated tubing <br />Stabilize root ball 3 stake method-remove after 2 years <br />Protect tree Staking <br />Soil Conditioning Hydrogel and compost (20% by volume) <br /> Compost free from Hartwell Ave station <br /> <br />Item 2-Ease of watering-Install when planting 2 or 3 one foot sections or a 6-8 foot <br />length of coiled 4 inch perforated tubing <br /> The ideal system would allow for DPW to perform fast, effective watering on new <br />trees. Above ground systems appear marginal in their effectiveness. <br /> <br />Planting-We have backhoes and a 19 inch auger, why are they not used? <br /> <br />Other thoughts-Limit GRAFTED stock, review WHERE to plant, review WHEN to <br />plant, Focus on NATIVE tree selection <br /> <br />How can the DPW and Tree Committee /Volunteers work together for a better result? <br />Tree Committee/Volunteers could prune root ball while DPW prepares hole and <br />compost/hydrogel <br /> <br />Gerry Paul/Jim Wood Estabrook Dunstan Chestnut planting 1 Nov 2010 <br />2hrs X 2men=4man hours(added compost and staked) <br /> <br />Anne Senning/Jim Wood Partial Survey of trees planted in 2010: 1/3 to 1/2 are <br />struggling. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.