|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-09-16-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2010
>
2010-09-16-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2010 3:06:46 PM
Creation date
10/31/2010 3:06:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />APPROVED MEETING MINUTES <br /> <br /> <br />Committee Name: Lexington Bicycle Advisory Committee <br /> <br />Date, Time and Location of Meeting: <br />September 16, 2010, 7 pm, Room G-15, <br />Town Office Building <br /> <br />Members Present: <br />Peggy Enders (Chair), Stew Kennedy, John Frey, Marita <br />Hartshorn, Mike Tabaczynski, Richard Canale, (Planning Board Liaison), Sandra <br />Shaw (Recreation Committee Liaison) <br /> <br />Others Present: <br />Bob Dangel, Bill McKenney, Richard Spencer, Margaret <br />Stebbins, Bob Hausslein <br /> <br />Members Absent: <br /> Peter Kelley (Selectmen’s Liaison), Jerry Van Hook, Laurel <br />Carpenter, George Gagliardi, Abe Shenker <br /> <br />Minutes <br />: The August 2010 minutes were approved. <br /> <br />Bikeway Requests: <br /> Peggy updated us on the request by ALS-Cure to use the <br />Bikeway on May 7, 2011 for a running race. (At our August meeting, we agreed <br />to recommend that the request not be approved due to large numbers on a <br />potentially very busy day). Peggy found out that, in prior years, Dave <br />Pinsonneault had worked directly with the race planners and that the LBAC had <br />not been consulted. Mike suggested we formalize our position on use of the <br />Bikeway for both large events as well as signs and posters. <br /> <br />Hartwell Avenue Traffic Mitigation <br />: The next discussion by the Planning Board <br />regarding Hartwell Avenue will be September 29; at that meeting the draft will be <br />finalized. Richard Canale reported that bike lanes on Hartwell and Bedford <br />Street will be included, accommodations will be made for cyclists on Wood <br />Street, the roundabouts will have on-rotary and off-rotary bike access, the <br />Minuteman crossing will be angled to accommodate the West Lexington <br />Greenway, and the West Lexington Greenway will be incorporated into the plan <br />at Bedford Street crossing by the power line. A final public hearing will be held <br />in mid to late November. <br /> <br />Subcommittee on Streets and Roads Heavily Traveled by Cyclists <br />: Peggy <br />reported that John Livsey has asked us to identify the network of heavily traveled <br />streets used by cyclists. He hopes that such a document, kept in draft form and <br />up to date, will help planning as roadway improvements are undertaken. Bob <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.