Laserfiche WebLink
PLANNING BOARD MINUTES <br />MEETING OF APRIL 12, 2000 <br />The meeting of the Lexington Planning Board held in the Selectmen's Room Town Office Building, was <br />called to order at 7:05 p.m. by Chairman Davies with members Bridge - Denzak, Colman, Galaitsis, Director <br />of Comprehensive Planning Bowyer, Planning Director Garber and Assistant Planner McCall- Taylor <br />present. Mr. Merrill was absent. <br />SUBDIVISION OF LAND <br />46 Hayes Lane Definitive Subdivision Plan, Peter Johnson, PUBLIC HEARING Mr. Davies opened the <br />hearing at 7:07 p.m. Present for this item were Gary Larson, Larson Associates, Iandscape architect, and an <br />audience of 15 interested persons. Mr. Larson presented plans for the proposed two -lot subdivision. He <br />showed that the plan complies with wetlands regulations and said there would be minor widening of the <br />portion of Hayes Lane that provides frontage for the site. <br />In response to Mr. Colman's question about considering a cluster layout for the site, Mr. Larson answered <br />that a cluster subdivision would require three dwelling units and that this could be a more intense use of the <br />site. Other questions and comments from the Board had to do with the street widening. <br />Several residents spoke against the road widening. They said that Hayes Lane is used as a cut - through route <br />and widening will allow that traffic to go faster through the neighborhood, creating a greater hazard. These <br />neighbors are not opposed to the proposed house. One resident said that illegal fill was dumped at the site in <br />previous years. <br />Mr. Davies acknowledged the comments from the audience regarding the widening of the street. He closed <br />the hearing at 8:04 p.m. <br />Rowland Avenue Definitive Subdivision Plan, Woodhaven Realty Trust, Continuation of Public Hearing <br />Mr. Davies opened the hearing at 8 :05 p.m. Frederick DeAngelis was present representing the applicant, <br />Barbara Palant. There were eighteen people in the audience. Mr. DeAngelis said that the applicant requests a <br />120 -day extension of the time in which the Board has to act on the definitive plan dated December 1, 1999. <br />Mr. Davies read a prepared statement, as follows: The Planning Board takes action on this case, after 14 <br />months, with a degree of frustration. During this time period, the Board has had to focus largely on issues of <br />lot title and property history, deeds, plot plans, vintage paper rights-of-way, old Board Of Appeals records <br />and the like. Such material is not the domain of this or any other Planning Board in the Commonwealth. <br />Such data is not required in anyone's subdivision regulations as a submission requirement. When it dons its <br />permitting hat, the stock in trade of this and all Planning Boards is made up of subdivision control, special <br />permits and rezoning petitions, and nothing else. <br />The Board is charged with evaluating subdivision elements such as paved travelways, curbing, sewer and <br />water mains, catch basins, street trees, lot lines, sidewalks and related improvements. Where a special permit <br />is involved (which is not the case with the Rowland Avenue application), the members ponder such matters <br />as the layout of houses on a site, the natural features of a piece of property, landscaping and screening, <br />handling stormwater runoff on the lot, and similar considerations. The proper and statutory role for the <br />Planning Board is to deal with these subdivision and site plan matters. The Board's role is emphatically not <br />to act as a local land court and to spend months trying to figure out an irregular flow of detailed and <br />fragmented property information. The Board's job is to review design features within the public <br />infrastructure and on private land; it is not our job to assemble real estate crossword puzzles that in some <br />instances might go back more than a century. <br />To compound the inappropriateness of the Board acting in this role, it has been necessary to make town <br />counsel Palmer and Dodge our partner in this venture for the past eight months. Combined with other so- <br />