|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-05-26-PB-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Planning Board-PB
>
Minutes
>
2010-2019
>
2010
>
2010-05-26-PB-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 3:27:53 PM
Creation date
6/29/2010 9:52:39 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PB - Planning Board
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PLANNING BOARD MINUTES <br />MEETING OF MAY 26, 2010 <br /> <br />A regular meeting of the Lexington Planning Board in the Selectmen’s Meeting Room, Town Office <br />Building was called to order at 7:30 p.m. by Chairman Greg Zurlo with members Charles Hornig, Richard <br />Canale, Wendy Manz and planning staff Maryann McCall-Taylor, Aaron Henry, and Lori Kaufman <br />present. Anthony Galaitsis was absent. <br /> <br />**************************SUBDIVISION ADMINISTRATION**************************** <br />PUBLIC HEARING <br />147 Shade Street, continued public hearing for site sensitive development: Mr. Zurlo called the continued <br />public hearing to order at 7:32 p.m. In attendance were Mr. Fred Russell, engineer, the applicants Chen <br />He and Wendy Whu with approximately 7 people in the audience. Mr. Russell presented the following <br />information included in the definitive plan: <br /> <br /> The eastern side of the property by 151 Shade Street has good screening and would retain it; <br /> <br /> The existing house would include renovations and an addition in the back; <br /> <br /> There would be two infiltrations systems, one for the runoff of the existing house and a second <br />system for the new house; the runoff would be through the driveway; and <br /> <br /> The new planting schedule would be modified and enhanced around the infiltration system. <br />There was a suggestion by staff to move the infiltration system under the pavement. Mr. Russell <br />responded that he would like the well to be monitored, did not want to pull up pavement and there was <br />possible ledge in the alternate spot. <br /> <br />Board Comments: <br /> <br /> How was this plan site sensitive? Mr. Russell responded that he could maintain the vegetative <br />cover on the east side and maintain more of the wooded area on the second lot to buffer the <br />existing homes. <br /> <br /> What was the expectation of the process for tonight? Mr. Russell said he expected to come back <br />with final revised plans based on staff and Board comments. <br /> <br /> What are you trying to accomplish with the limit of work? Mr. Russell said that he would be <br />trying to maintain as much of the vegetative cover to buffer the existing neighbors. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.