Laserfiche WebLink
T' <br />f <br />fir` <br />SELECTMEN'S MEETING °" d <br />April 3, 1989 <br />A regular meeting of the Board of Selectmen was held on Monday, <br />April 3 , 1989, in the Selectmen's Meeting Room Town office Building, at <br />7:00 p.m. Chairman Smith, Mr. Marshall , Mr. Eddison, Mr. McSweeney; Mr, <br />White, Town Manager; Mr. Cohen, Town Counsel; Ms, Radway, , Asst, to the <br />Town Manager; Mrs. Snow, Executive Clerk, were present. Mr. Dailey <br />joined the meeting later, <br />CONSENT AGENDA <br />ECCLES REQUEST, PLAYGROUND PARKTNG <br />Upon motion duly made and seconded, it was voted to refer the <br />request of Anne Laurin Eccles, 49 Parker Street, for construction of a <br />parking lot ad J scent to the Leathers playground at the Center Field, to <br />the Traffic Safety Advisory Committee for review and rpcommpndati ons . <br />CONTRACT X89 -9 SIGNED <br />Upon motion duly made and seconded, it was voted to execute <br />Contract #89-9, Cleaning & Lining Existing Water Mains, as awarded at <br />the Selectmen's Meeting on March 20, 19890 <br />CENTER CROSS14ALKS <br />Mr. White referred to the recommendations of the Lexington Center <br />Committee that all Center crosswalks now painted in the ladder design be <br />repainted at this time, over the existing design, in diagonal striping. <br />Tt was also urged that crosswalk repainting occur more frequently. <br />The L.C.C. felt -that since the existing design is badly worn, it <br />would, in time, wear away completely. Mrs. Batti n , L.C.C. Chairman , was <br />present for the discussion. <br />The Manager felt that the proper way to change the pattern would be <br />to remove the thermal plastic, at a cost of $16,000 to $26,000, before <br />repainting. He added that the plastic material does not accept paint <br />and that painting a different design over it would present a number of <br />problems in terms of aesthetics. He suggested that he and the L,C.C& <br />explore the issue further and that the crosswalks be repainted in the <br />ladder design for this year, at least. <br />Mr. White asked for the Board's authority to arrange for completion <br />of this work before Patriot's Day' <br />Mrs, Ratti n stated that at a Joint meeting of the L.C.C. with the <br />Traffic Committee, the four L.C.C. members were unanimous in their <br />opinion that zebra striping is preferable, as had always been the view <br />of the full committee. <br />It was pointed out that some crosswalks in the Center have only <br />stripes at the sides, with no ladder design and Mr. McSweeney suggested <br />that these be painted now in the zebra design, with the side stripes <br />painted so as to avoid the existing thermal plastic stripes. <br />It was the sense of the Board to go forward with the Town Manager's <br />suggestion to repaint, as is, the ladder design crosswalks, and as <br />suggested by Mr. McSweeney, to install zebra striping on all Center <br />crosswalks with only side lines. The thermo plastic l adderi ng will be <br />phased out over two years, to be replaced by the zebra design as soon as <br />possible. <br />