Laserfiche WebLink
February 12, 2009 ZBA Minutes 2 <br /> Minutes of the Lexington Zoning Board of Appeals <br /> Selectmen's Meeting Room, Lexington Town Hall <br /> February 12, 2009 <br /> Board Members Present: Acting Chairman —John J. McWeeney, Arthur C. Smith, Carolyn C. <br /> Wilson and Associate Members Jill Hai and Martha C. Wood <br /> Staff Present: Dianne Cornaro, Administrative Clerk, David George, Zoning Administrator and <br /> Garry Rhodes, Building Commissioner. <br /> Petition Address: 397 Lowell Street, Map 46, Lot 37 <br /> The Chairman opened the hearing at 7:37 PM by reading the legal notices and described <br /> information received from the petitioner relative to the petition. <br /> Attorney Adam Braillard presented the petition for the applicant, MetroPCS Massachusetts, <br /> LLC. At the hearing he presented new plans for the design of the equipment to the board. With <br /> Attorney Braillard was the Site Requisitioner for MetroMCS Francis Parise and the Radio <br /> Frequency Specialist, Brian Eicenins, also of MetroPCS. <br /> The petitioner seeks to install a camouflaged wireless communications facility on the roof of the <br /> building at 397 Lowell Street. <br /> The building is used for retail, restaurants, offices, and storage and is located in the CRS zoning <br /> district. The building is host to two other wireless telecommunication's carriers. On January 10, <br /> 2008 the ZBA granted approval to Bell Atlantic to install antennas inside of a faux shelter to be <br /> built on the rooftop. The other wireless facility (non- camouflaged) appears to have been <br /> constructed under a building permit prior to the current wireless telecommunication's By -law. <br /> The applicant sought special permits for a camouflaged wireless installation at this site on <br /> August 28, 2008. The matter was continued to September 11, 2008, at which point the <br /> application was withdrawn without prejudice for redesigning. <br /> Prior to the hearing, the petition and supporting data were reviewed by the Building <br /> Commissioner, Conservation Administrator, Town Engineer, Health Director, Board of <br /> Selectmen, the Zoning Administrator, the Planning Administrator, the Design Advisory <br /> Committee and the Communications Advisory Committee. Comments were received from the <br /> Design Advisory Committee, the Communications Advisory Committee and the Zoning <br /> Administrator. <br /> The Board asked how much did the equipment weigh and how far back from the edge of the <br /> building would it be. The equipment weighs approximately 1200 pounds and it will be about 8 <br /> feet from the edge of the roof. <br />