|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2020-12-10-LCC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Center Committee-LCC
>
Minutes
>
2020
>
2020-12-10-LCC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2021 12:34:18 PM
Creation date
3/17/2021 12:34:17 PM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - LCC - Lexington Center Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Town of Lexington <br /> Lexington Center Committee <br /> Minutes ,n,'+nr for the meeting of December 10, 2020 held on Zoom <br /> pursuant to Governor Baker's March 12, 2020 order suspending certain provisions <br /> of the Open Meeting Law, G.L. c. 30A, section 18, and subsequent orders. <br /> Committee members present: Richard Brown, Michael Boudett, Katherine Huang <br /> (9:03 am) Frederic Johnson, Pamela Lyons, Innessa Manning, Jerold Michelson <br /> (chair), Pamela Shadley <br /> Liaisons: Jill Hai, Select Board, Bob Creech, Planning Board, Sandhya Iyer, <br /> Economic Development Director, Casey Hagerty, Economic Development <br /> Coordinator, Joe Pato, Select Board (informally), David Pinsonneault, DPW, Dawn <br /> McKenna, Tourism Committee, Upsanan Chhabra, Artwalk Committee, Melanie <br /> Tanionos, Business Collaborative, Erin Sandler-Rathe, Chamber of Commerce, <br /> Sandra Shaw, Council On Aging, Stella Carr, Sustainability Director <br /> We began with an update from Dave Pinsonneault concerning the Center <br /> Streetscape Project. The 100% design plans are complete and the project is going <br /> out to bid in January with construction to begin right after Patriot's Day. The first <br /> phase running from the Police Station to Merriam Street will occur from April to <br /> November 2021 and 2022. There will be construction inspection services working <br /> directly for the Town to ensure the project is performed as the design requires. <br /> Once the contractor is hired there will be public meetings with the Chamber of <br /> Commerce and other stakeholders. An email list will be set up to push out <br /> construction information and updates. Beta is the project engineer. <br /> Casey let us know that she will be connecting with an architect regarding the bike <br /> node (TM bought the property in 2020) to do some rechecks with relevant <br /> groups. The Police Dept. will not enforce any parking meters when there is snow <br /> blocking the meters. The SB will be discussing meters at an upcoming meeting. <br /> The Visitors Center (including the bathrooms) will close for the months of January, <br /> February and March, 2021. Were bathrooms to remain open staff would be <br /> FH5236496.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.