|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2020-06-18-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2020
>
2020-06-18-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2020 8:51:36 AM
Creation date
11/19/2020 8:51:34 AM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Minutes 6-18-20 <br /> Members Present: ]on Himmel, Dick Perry, Chuck Favazzo, Celis Brisbin <br /> It should be mentioned that several members of the Sustainable Lexington <br /> Committee were present as was Mark Sandeen (Select Board Liaison) as well <br /> as other residents. <br /> Participating in the presentation were representatives from Tecton Architects <br /> and his Consultants as well as the Town's Sustainable Design consultant, the <br /> Green Engineer. <br /> As Co-Chair ]on Himmel opened the meeting by reading the preamble as <br /> requested by the Select Board for Remote meetings. <br /> Tecton Architects began with a PowerPoint presentation for an update on the <br /> Police Station Project. <br /> A Site Plan was shared that demonstrated some development since last <br /> meeting, showing the full Fletcher Field area, bio-retention Basin, some <br /> landscaping, an updated focus area at the front entrance to the Police <br /> station and a possible reflective space in front of the former entry that could <br /> possibly be an area for the police memorial. The overall parking count <br /> remains unchanged in this design which matches the existing parking <br /> counts' and the calculated green space area is larger than the existing <br /> condition. <br /> Generator placement and potential battery storage placement is an ongoing <br /> discussion, but are expected to go between the police station and Cary <br /> Memorial Hall. There was a reminder about the pending new antenna tower <br /> at the rear corner of the site. <br /> There was a quick walk thru of the two floor plans but little discussion as <br /> there has been no real changes since the last meeting. In general, the <br /> current design (all new construction) is approx. 5000 sf less than the prior <br /> fall 2019 plan, which was based on the preservation of two facades as <br /> previously desired' by the HDC, renovation and additions to the existing <br /> building. <br /> There was a general review of the building elevations and a perspective. <br /> The Architect commented on the color of the metal panning. The design of <br /> the overhead doors still needs work. See minutes later on for discussion on <br /> update from HDC informal hearing. <br /> 'The count includes the seven patrol cars that are to be parked within the building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.