Laserfiche WebLink
PBC Minutes 6-18-20 <br /> Members Present: ]on Himmel, Dick Perry, Chuck Favazzo, Celis Brisbin <br /> It should be mentioned that several members of the Sustainable Lexington <br /> Committee were present as was Mark Sandeen (Select Board Liaison) as well <br /> as other residents. <br /> Participating in the presentation were representatives from Tecton Architects <br /> and his Consultants as well as the Town's Sustainable Design consultant, the <br /> Green Engineer. <br /> As Co-Chair ]on Himmel opened the meeting by reading the preamble as <br /> requested by the Select Board for Remote meetings. <br /> Tecton Architects began with a PowerPoint presentation for an update on the <br /> Police Station Project. <br /> A Site Plan was shared that demonstrated some development since last <br /> meeting, showing the full Fletcher Field area, bio-retention Basin, some <br /> landscaping, an updated focus area at the front entrance to the Police <br /> station and a possible reflective space in front of the former entry that could <br /> possibly be an area for the police memorial. The overall parking count <br /> remains unchanged in this design which matches the existing parking <br /> counts' and the calculated green space area is larger than the existing <br /> condition. <br /> Generator placement and potential battery storage placement is an ongoing <br /> discussion, but are expected to go between the police station and Cary <br /> Memorial Hall. There was a reminder about the pending new antenna tower <br /> at the rear corner of the site. <br /> There was a quick walk thru of the two floor plans but little discussion as <br /> there has been no real changes since the last meeting. In general, the <br /> current design (all new construction) is approx. 5000 sf less than the prior <br /> fall 2019 plan, which was based on the preservation of two facades as <br /> previously desired' by the HDC, renovation and additions to the existing <br /> building. <br /> There was a general review of the building elevations and a perspective. <br /> The Architect commented on the color of the metal panning. The design of <br /> the overhead doors still needs work. See minutes later on for discussion on <br /> update from HDC informal hearing. <br /> 'The count includes the seven patrol cars that are to be parked within the building. <br />