Laserfiche WebLink
'09 Minutes of the <br />Lexington Ad Hoc Crematory Study Meeting <br />August 20, 2019 <br />(as clarified and approved at September 17, 2019 meeting) <br />Location and Time: 201 Bedford Street; 2nd Floor Training Room; 5:00 P.M. <br />Members Present: Suzie Barry (Chair Non-voting, and Select Board liaison), Narain <br />Bhatia, George Burnell (EDAC), Judith Crocker, John Flynn (Board of Health), Msgr. Paul <br />Garrity (LICA), Bridger McGaw <br />Members and Others Absent: Sara Iverson, Sandy Beebee (Capital Expenditures liaison) <br />Others Present: David Pinsonneault (DPW liaison), Carolyn Kosnoff, Nick Nichols <br />(Appropriations liason), Sanjay Padaki (Appropriation liaison — Telecon 6:05pm) <br />Documents Presented: <br />Most documents, including the financial analyses, discussed Ad Hoc Crematory Study committee <br />meetings can be found on this shared google drive: <br />haps://drive.poople.corn/drive/folders/1GpbEsOCpzhUb YXXoxKaa6ifOtYdUSFW?usp=sharing <br />The Ad Hoc Crematory Sturdy Interim Report to 2019 ATM can be found here: <br />https:11www.lexingtonma.gov/sites1lexingtonmal Yes/u�loads/article2ad hoc crematory interim re <br />port Ord 2019 v3 bos ok 4.3.19. pdf <br />Ms. Barry called the meeting to order at 5:06 pm. The committee unanimously approved minutes <br />from the July 17th, 2019 meeting. (Motion by Msgr. Paul Garrity, second by Judith Crocker) <br />Msgr. Garrity reported on the Lexington Interfaith Clergy Association (LICA) meeting held June 18, <br />2019. Msgr. Garrity noted the Association did not have an explicit recommendation "for' or "against' <br />the construction of a Crematory at Westview Cemetery. <br />After careful deliberation the LICA issued the following statement: <br />"We call upon the ad hoc crematory study committee and town meeting to fully consider the spiritual <br />needs of the Hindu, Buddhist, Jain, Sikhs, and any other communities who practice cremation <br />(specifically the need to witness cremation) as they seek to discern how to move forward." <br />Mr. McGaw reported on an informal discussion with Town Council with respect to possibility for <br />outsourcing the crematory operation. Town council stated "no" to outsource construction. <br />Outsourcing Operation was doable, but not recommended. Significant issues with ownership an <br />enterprise control. <br />The committee continued further reviewed Mr. McGaw financial analysis. Mr. McGaw prepared a <br />spreadsheet to examine operating costs over a ten year period. Payback times examined based on <br />a variable number of cremations and cost per cremation. The analysis concluded that any <br />reasonably competitive cost per cremation would require an unattainable number of cremations per <br />year. <br />Ms. Barry gave a further status update on the survey the Town Manager sent to 107 nearby <br />communities. Ms. Barry informed the committee on the follow up with survey responses from <br />Page 1 of 2 <br />