Laserfiche WebLink
Greenways Corridor Committee <br /> June 13, 2019 <br /> Parker Room, Town Office Building <br /> Lexington, Massachusetts <br /> Members Present: Mal Crawford, Alex Dohan, Peggy Enders, Eileen Entin, Don Grant, Bob <br /> Hausslein, Susan Kenyon, Keith Ohmart, Mike Tabaczynski <br /> Other Attendees: Joe Pato, Select Board liaison, Mark Sandeen, new Select Board liaison <br /> Votes: Meeting minutes of April 25 and May 16, 2019: Approved <br /> Taken out of order, the Community Connector report - Keith presented at the Joint <br /> Stewards/Conservation Commission meeting May 20, regarding fitting the project into the Con- <br /> servation Priorities list. May make sense to separate Community Connector from Environmen- <br /> tal Bond Bill. ConCom will support the Connector between the Community Center and Cotton <br /> Farm, but the continuation through the wetland to reach the high school is a much bigger pro- <br /> ject and is unlikely to be high on the Priorities list. Could it still fit into the Environmental Bond <br /> Bill if done in twohp ases (as opposed to two separate projects, which would eliminate it from <br /> qualifying for EBB funds)? <br /> Reports/Updates: <br /> • Return to the Hudson Room in September. <br /> • Jordan & the Conservation interns are working on the Laconia St trail. <br /> • Work on the 0 Grove St (Jefferson Drive) development is progressing and the developer has <br /> agreed to put forward money for the trail, which can be used for surveying. Developer will <br /> build trail to the property line. Rerouting the existing social trail will include building a 24 foot <br /> bridge. Sheila Page is the contact in the Planning Dept on this project. Joe and Mark will fig- <br /> ure out who should talk to Burlington. Might help if GCC members can walk site with sur- <br /> veyor when that gets scheduled. <br /> • The Bridge School NOI needs a DEP number. Mal explained about ConCom concern about <br /> seed mix and possible replanting of closed trail area. Will ask ConCom to visit site again. <br /> • Fairland St project - Susan and Keith have been emailing with Mark Baron. Susan will go to <br /> next Weds Planning Board meeting to follow up. Project will need to satisfy ConCom and <br /> DPW as well as Planning. Sheila Page (Asst. Planning Dir.) is the project contact for Town. <br /> • Susan has the last box of brochures and will have students distribute this summer. There <br /> should be enough to last through July and maybe into August. We will be ready for a new <br /> map this fall. Hayden Woods boardwalk work will be done by fall, and the Bowman School <br /> site walk is scheduled for Friday so the next route will be signed soon. Keith will put in a <br /> budget request this fall for $5000 for a new brochure. We should put the QR code on the <br /> new brochure. We will have to figure out what text to cut, as we don't have enough space for <br /> more points of interest now. Should we go to a larger format? Should we coordinate with <br /> Tourism and their brochure? <br /> • A Winchester resident emailed the GCC general email with ideas for future trails. Keith will <br /> respond and cc Bob for follow up. <br />