Laserfiche WebLink
�y w-AOR yrry. <br /> Minutes of the <br /> s \�� Lexington Capital Expenditures Committee (CEC) Meeting <br /> n March 20, 2019 <br /> APRIL&", <br /> II,E XI NGT.O <br /> Location and Time: Town Office Building, Reed Room (111); 7:45 A.M. <br /> Members Present: Charles Lamb, Chair; David Kanter, Vice-Chair& Clerk; Sandy Beebee; <br /> Rod Cole; Frank Smith; and Wendy Manz <br /> Members Absent: None <br /> Others Present: Carolyn Kosnoff, Assistant Town Manager for Finance; <br /> David Pinsonneault, Director, Department of Public Works; Sara Arnold, Recording <br /> Secretary <br /> Documents Presented: <br /> • Notice of CEC Meeting, March 20, 2019 <br /> • Draft#4 CEC Report to 2019 Annual Town Meeting (ATM); Compiled by Mr. Kanter <br /> Call to Order: Mr. Lamb called the meeting to order at 7:45 A.M. <br /> Preparation for the 2019 ATM, including Review of Draft#4 of this Committee's Report <br /> to that Town Meeting (CEC Report): <br /> Mr. Lamb reported that his report to the ATM for this Committee under Article 2: Election of <br /> Deputy Moderator and Reports of Town Boards, Officers and Committees, would be short <br /> and based on the Executive Summary. <br /> Mr. Kanter initiated a page-by-page review of Draft#4 of the CEC Report to address/clarify <br /> comments/questions, make corrections, and verify the person responsible for additional <br /> actions needed to complete the report. Edits made since the last version were accepted <br /> and/or tweaked. <br /> During the review, Mr. Pinsonneault stopped in (7:55 A.M.-8:03 A.M.) to answer questions <br /> regarding DPW-related projects. The discussion with Mr. Pinsonneault focused on Article 16: <br /> Appropriate for Municipal Capital Projects and Equipment; f) Automatic Meter Reading <br /> System (AMR) (Article 16(f)). Comments included but were not limited to: <br /> • Assuming this project is funded, the water meters that are installed in the next few <br /> years will need to be replaced in approximately 15 years. <br /> • Funding for meter replacements is included in the operating budget, using Enterprise <br /> Funds. Currently, this is handled by staff. Under the new program it is anticipated that <br /> a contractor would be used. <br /> • The system is expected to identify 80-90% of leaks in a shorter period of time than is <br /> now the case. The Town can turn off a resident's water if the resident is out-of-town. <br /> • A resident can use an on-line system to monitor water usage and establish thresholds <br /> for identifying when water usage is out of the ordinary. <br /> Ms. Kosnoff stopped in (8:19 A.M.-9:30 A.M.) to answer questions. She noted that the <br /> average additional cost per household for the AMR system is estimated to be approximately <br /> $80 per year. Regarding Article 22: Establish, Dissolve, and Appropriate to and from <br /> Specified Stabilization Funds (Article 22), Ms. Kosnoff reported that the Memorandum of <br /> Understanding associated with the King Street property is being reviewed by the Town to <br /> determine which stabilization fund, or funds, will receive the nearly $1.0 million payment that <br /> Page 1 of 2 <br />